HomeMy WebLinkAbout25-E007 169 Route 6A ApprovedO°o TOWN OF YARMOUTH Mffljop
yy
� 1148 ROUTE 28 SOUTH YARMOUTH MA 02664 5 -44 1
Telephone (508) 398-2231 Ext. 1292—Fax (508) 398-0836
FEB 1 0 2025
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
Id King's Highway
iARNOUTH TOWN CLERK RE APPLICATION FOR Historic District
FEB 18125 A148:52 CERTIFICATE OF EXEMPTION
Application is hereby made for the issuance of a Certificate of Exemption under Sections 6 and 7 of Chapter 470 of
Acts of 1973, as amended, for the proposed work as described below and on plans, drawings, or photographs
accompanying this application.
Type or Print12gibly:
Address of proposed work: le� / �� Map/Lot #
Ownerfsl: '--ee� Phone #:
All applicatio must be eubmi by owner
//or accompanied by letter from owner approving submittal of application.
Mailing address: ��/ �✓� m� fT �� / /7 Year built: / ' J`~eq
Email: q /'C 0- 74u,- f/, HOC llC• 6flreferred notification method: Phone (Email
L , its .1 . n.
Mailing Address: /
�+ fiC/ e_e / 4 f
Phone #: sd9
IJi"
Email: C P.Oc we r �I �P hr a �� C Preferred notification method: Phone
Delcriplign of Proposed
Q'C /! s S-' .� �Oi' sir, f Gt I�'� e
G 0� �' • ,
cler C y �+�- �• l� • � j� 2-, cc
Signed (Owner or agent): /� Date:
lo Owner/contractortagent is aware that a permit may be required from the Building Department. (Check other departments, also.)
This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever date shall be later
' 1l 11 i:i ; ; I
Date: d1
Amount W
Cash/CK #:
Rcvd by . �' S
=AM
A roved with than
ZApprovedPP es g
Reason for denial:
Date Signed Signed 5U k-�1?14 e4'0? I
Old King's
ti 5 2017
Sherman, Lisa
From: Robert Wilkins
Sent: Thursday, February 13, 2025 8:33 AM
To: Sherman, Lisa
Subject: Re: 25-EO07 169 Route 6A
Attention!: This email originates outside of the organization. Do not open attachments or click links
unless you are sure this email is from a known sender and you know the content is safe. Call the
sender to verify if unsure. Otherwise delete this email.
OK approved
On Feb 11, 2025, at 1:52 PM, Sherman, Lisa <LSherman@yarmouth.ma.us> wrote:
I heard back from the contractor for 169 Route 6A:
There will be nothing exposed on the North side of the building oastreet view like now. And
on the sides it will be 12 -15 inches of parged cement.
Please let me know if you need any additional information.
MMThanks Bob,
ARMOUTH AdN CLERK RE
FEB 13125 AMB:52
FEB 13 2025
Q1d Ag's HighwAif
From: Robert Wilkins IgnEgI111111111111W Historic District
Sent: Tuesday, February 11, 2025 10:21 AM
To: Sherman, Lisa <LSherman@yarmouth.ma.us>
Subject: Re: 25-EO07169 Route 6A
Attention!: This email originates outside of the organization. Do not open attachments or click links
unless you are sure this email is from a known sender and you know the content is safe. Call the
sender to verify if unsure. Otherwise delete this email.
have two questions: How much of the new foundation will be exposed (height from the
ground, i.e.), and what will the visible material be?
p.s. It's surprising how many synthetic materials are green, vinyl among them!
7
rS.Ti�wMlw1.1� •^.+MYf.
On Feb 11, 2025, at 9:00 AM, Sherman, Lisa <i.Srierman. yarmouth.ma.us>
wrote:
Interesting note about Trex! Good to know.
For the barn, he is going to raise the barn and add a foundation
underneath. That's all— no other changes. I talked to him
specifically about that to make sure that is the extent of the barn
project.
Let me know if you have any additional questions. =WE
Thanks Bob, FEB 13 2025
Lisa Old King's Highway
Historic District
From: Robert Wilkins
Sent: Monday, February 10, 2025 3:55 PM
To: Sherman, Lisa <<Shermangyarmouth.ma.us>
Subject: Re: 25-EO07 169 Route 6A
Attention!: This email originates outside of the organization. Do not open attachments or click links
unless you are sure this email is from a known sender and you know the content is safe. Call the
sender to verify if unsure. Otherwise delete this email.
Hi Lisa,
The decking isn't a problem. In fact, in consideration of the new legislation
that urges us to "give great weight" to alternative, green building materials,
found this out about Trex: "Trex is considered a green product as it is made
from 95% recycled material The company that produces it is a member of
the US Green Building Councit and has employed green principles for over 20
years."
However, I do have concerns about the barn, most importantly, what exactly
is meant by "rebuild barn." Taken literally, that would require a demolition
certificate, followed by a COA for the "rebuild."
If they separate the deck from the rebuild, i will grant the exemption.
a
:..
On Feb 10, 2025, at 10:21 AM, Sherman, Lisa
<LSherman armouth maxs> wrote:
:••
Resident would like to replace decking on the side
and rear of the house and raise the barn to add a
foundation at 169 Route 6A.
Please let me know if you need any additional
information.
Thanks Bob,
Lisa
Lisa Sherman
Town of Yarmouth
Administrator, Old King's Highway Historic District and Yarmouth
Historical Commission
508-398-2231, ext. 1292
(sherrnan@Wrmouth.vna,us
r]
FEB 13 2Q25
Old King's Highway
Historic District
�,.1:�Ojl
le
�D
FEB 102015
Old King's Highway
Historic District
P I R.. SEE
FEB 13 2025
Old King's Highway
Historic District
2 5 - E 0 0 7
D
FEA 10 1D7§
l u 0; K, ng's Hj.-
O Historic District
FEB 13 2025
Old King's Highway
Historic District
2 5 - E 0 0 7 ,Ii;
T 0 D
3 2025
Old King's Highway FED 10 2025
Historic District 2 5- E 4 0 7
Old King'; Highway
Historic District
,, I
FEB 13 2025
Old King's Highway
Historic District
FEB 10 2025
Historic; District
2 5 - E 0 0 7
wtfWei/d,.�
mmms
FEB 13 7025
Old King's Highway
Historic District
VORM0
FEB 1 0 2025
Old King's Highway
Historic District
2 5 - E 0 0 7
ril