HomeMy WebLinkAboutInpsection report - all Electrical YARMOUTH GARDENS 497 Main Street (Rt-28) 2-5-21 Request for Ufer ground inspection for 2-12-21 (No permit application) 2-12-21 Ufer ground inspection REJECT. (Still no permit) 2-17-21 Ufer ground re-inspection OK' (Still no permit) 3-2-21 Received application for Bldg# 1 (E21-4935) Issued 3-2-21 Received application for Bldg#2 (E21-4936) Issued 3-9-21 Conduits from future pad mounted xfmr to just inside foundation Bldg 1 3-11-21 Conduits continue from where they left off on 3/9 to just before utility area 3-12-21 Ufer ground for building#2 3-24-21 U/G conduits to utility room, building 1 & extension of data/comm to bldg. 2 3-31-21 U/G conduits (Feeder)to septic equipment & pump runs & sensors 4-9-21 U/G Bldg 2 towards Xfmr pad 4-12-21 U/G Bldg 2 towards rear of building OK'd 4-14-21 U/G Bldg 2 towards septic & elevator room OK'd 4-16-21 U/G Bldg 2 Elevator to electric room OK'd 5-12-21 Site lighting U/G Bldg 1 OK'd 5-14-21 U/G left side Bldg 2 OK'd 5-17-21 Temp lighting & receptacles Bldg#1 6-30-21 Temp lighting & receptacles Bldg#2 6-30-21 Reviewed conditions (Weather proof) OK'd to start rough wiring 7-14-21 Received application for HVAC wiring Bldg 1 (E22-0235) Issued 7-14-21 Received application for HVAC wiring Bldg 2 (E22-0237) Issued 7-19-21 Rough Units: 101, 102, 103, 104, 111, 112, 113, & 114(E21-4935) 7-19-21 Rough (HVAC Controls) Units: 101, 102, 103, 104, 111, 112, 113, & 114 (E22-0235) 8-6-21 Rough Bldg#1 North wing except 109 not ready(AJ) 8-6-21 OK'd to start wiring for Bldg. #2 (AJ) (CONTINUED NEXT PAGE) V 8-11-21 Rough for room#109 OK'd 8-17-21 Low voltage wiring for HVAC Rooms: 105,106, 107, 108, 110, 115, 116, 117, 118, 119, & 120. (E22-0235) OK'd 8-31-21 Rough Bldg#2 6 units North end OK'd 9-7-21 Rough Bldg#2 2nd floor units (Except last 3 South end) OK'd 9-10-21 Rough Bldg#2 (second floor 3 south units&common area OK'd 9-20-21 L/V thermostats (Bldg#2) Rooms 206, 207, 208, 209, 217, 218,& 219 (E21-4936) OK'd 10-4-21 L/V stats (Bldg#2) Rooms 202, 203, 204, 205, 213, 214, 215, &216 (E22-0237)OK'd 11-18-21 Building#1 (Service) (E21-4935) Not ready. 11-21-21 Building#1 (Service) OK'd 11-21-21 Building#2 (Service) (E21-4936) OK'd 12-16-21 Building#1 Above ceiling 2nd floor OK'd 12-16-21 Building#1 Above ceiling 1st floor Reject(BDA Cable laying on grid) 12-17-21 Building#1 Above ceiling(E21-4935)OK'd 12-17-21 Building#2 Above ceiling inspections (E21-4936) Not ready 1-25-22 Partial final (Bldg#1) (E22-4935) Partial OK'd 2-10-22 Over ceiling inspection (Bldg#2) (E21-4936) OK'd 2-17-22 Final (Bldg#2) (Several items) Reject 2-23-22 Received application for solar (Bldg#2) (E22-4658 Issued) 2-23-22 Received application for solar (Bldg# 1) (E22-4659 Issued)