HomeMy WebLinkAboutElectric Inspection Results DY Intermediate School
286 Station Avenue
6-2-21 Met with Don Foose (Annese) & Ryan DiRico (Comodore) regarding
temporary power for job site trailers.
6-14-21 Trailers & temp wiring from generators
7-2-21 Permit application received E22-0040 Issued
7-9-21 Primary duct banks from Station Ave to 2nd man hole OK'd
8-2-21 Duct banks HH#2 to HH#3 running in front of job trailers (AJ) 1K'd
8-3-21 Duct bank HH#1 to 5' before Pole & 2 U/G conduit for site lighting (AJ)
8-12-21 Duct bank (last 20' to pole) See notes.
8-20-21 Duct banks at pad mounted Xfmr.
8-27-21 Section "D" Stub up & conduits in slab / UFER Grounding
9-10-21 Duct bank from pad mount xfmr to bldg..
9-21-21 Conduit (Secondary & Data) Section A,B, &C partial
9-29-21 U/G Gym area, locker rooms & bathrooms
10-12-21 Rec'd letter from GGD re: Fuel supply for Emergency Generator.
10-19-21 U/G Section C. Conduits in slab & stub-ups.
11-17-21 Temporary service connection. Eversource W/O # 6657295 OK'd
11-18-21 Eversource (Dorothy) advised that temp was approved for connection.
12-2-21 Duct bank for Data-Comm, Fiber, CATV, & Sign on Station Avenue
12-6-21 Letter to GGD Re: requirement for on-site fuel supply
12-9-21 Trench & conduits (Extension of U/G from 12/2/21 inspection.
12-16-21 U/G section of Bldg. B in 1st floor slab.
12-23-21 U/G Cafe storage, Cafeteria, stage, kitchen, kitchen office, dry storage, freezer,
kitchen staff lunch room, NOT electrical room or cust. Work area.
(AS REFERENCED ON E-2.11A)