Loading...
HomeMy WebLinkAboutElectric Inspection Results DY Intermediate School 286 Station Avenue 6-2-21 Met with Don Foose (Annese) & Ryan DiRico (Comodore) regarding temporary power for job site trailers. 6-14-21 Trailers & temp wiring from generators 7-2-21 Permit application received E22-0040 Issued 7-9-21 Primary duct banks from Station Ave to 2nd man hole OK'd 8-2-21 Duct banks HH#2 to HH#3 running in front of job trailers (AJ) 1K'd 8-3-21 Duct bank HH#1 to 5' before Pole & 2 U/G conduit for site lighting (AJ) 8-12-21 Duct bank (last 20' to pole) See notes. 8-20-21 Duct banks at pad mounted Xfmr. 8-27-21 Section "D" Stub up & conduits in slab / UFER Grounding 9-10-21 Duct bank from pad mount xfmr to bldg.. 9-21-21 Conduit (Secondary & Data) Section A,B, &C partial 9-29-21 U/G Gym area, locker rooms & bathrooms 10-12-21 Rec'd letter from GGD re: Fuel supply for Emergency Generator. 10-19-21 U/G Section C. Conduits in slab & stub-ups. 11-17-21 Temporary service connection. Eversource W/O # 6657295 OK'd 11-18-21 Eversource (Dorothy) advised that temp was approved for connection. 12-2-21 Duct bank for Data-Comm, Fiber, CATV, & Sign on Station Avenue 12-6-21 Letter to GGD Re: requirement for on-site fuel supply 12-9-21 Trench & conduits (Extension of U/G from 12/2/21 inspection. 12-16-21 U/G section of Bldg. B in 1st floor slab. 12-23-21 U/G Cafe storage, Cafeteria, stage, kitchen, kitchen office, dry storage, freezer, kitchen staff lunch room, NOT electrical room or cust. Work area. (AS REFERENCED ON E-2.11A) 1 1(4 . C . 4,44 ct--.0, Iti Ccily3 2" CTIN3 Fat_ r C81"ram► Z-( l W( 2_ C ' I26ti cat 3 \ l Z � /�iUv2 \mid