HomeMy WebLinkAboutTransmittal revised planDOWN CAPE ENGINEERING, INC.
939 Main Street / Route 61-k
Yarmouth Port, MA 02675
508-3624541
DCE # 24-031
SE#83-2462
Transmittal
Date: February 27, 2025
To: Brittany DiRienzo, Conservation Administrator
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
From: Daniel A. Ojala, PE, PUS, Down Cape Engineering, Inc.,
RE: SE83-2462 NOI for Win Kyaw, 10 Buttercup Lane, South Yarmouth
Enclosed is the Site Plan Showing Proposed Stairs and Fixed Pier at #10 Buttercup
Lane (South) Yarmouth, MA, prepared for Win Kyaw, revised February 25, 2025.
The Site Plan was revised per the Conservation Commission Meeting relocating
the stairs to the beginning of the pier and showing that the 546ot clearance will be
provided at MHW for public right of passage.
Enclosed are 7 full-size plans; one with original stamp &signature.
Please feel free to call if you have any questions.
DOWN CAPE ENGINEERING, INC.
939 Route 6A, Suite C
Yarmouth Port, MA 02675
telephone: 5 08-3 62-4541
downcape. downcape. com
priscilla@downcape.com