Loading...
HomeMy WebLinkAboutTransmittal revised planDOWN CAPE ENGINEERING, INC. 939 Main Street / Route 61-k Yarmouth Port, MA 02675 508-3624541 DCE # 24-031 SE#83-2462 Transmittal Date: February 27, 2025 To: Brittany DiRienzo, Conservation Administrator Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 From: Daniel A. Ojala, PE, PUS, Down Cape Engineering, Inc., RE: SE83-2462 NOI for Win Kyaw, 10 Buttercup Lane, South Yarmouth Enclosed is the Site Plan Showing Proposed Stairs and Fixed Pier at #10 Buttercup Lane (South) Yarmouth, MA, prepared for Win Kyaw, revised February 25, 2025. The Site Plan was revised per the Conservation Commission Meeting relocating the stairs to the beginning of the pier and showing that the 546ot clearance will be provided at MHW for public right of passage. Enclosed are 7 full-size plans; one with original stamp &signature. Please feel free to call if you have any questions. DOWN CAPE ENGINEERING, INC. 939 Route 6A, Suite C Yarmouth Port, MA 02675 telephone: 5 08-3 62-4541 downcape. downcape. com priscilla@downcape.com