Loading...
HomeMy WebLinkAboutBLD-23-000277TOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23-000277 09/22/2022 cathy bedard BUILDING PERMIT JOB WEATHER CARD PERMIT TO Repair FAT (LOCATION) 2 DEBS HILL RD, YARMOUTH PORT, MA 02675 ZONING DISTRICT Bldg. Type: Residential .SUBDIVISION MAP BLOCK LOT 108.49C9B BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS INSTALL 9 REPLACEMENT WINDOWS. NO STRUCTURAL WORK -- OKH CONTRACTOR approval918/22 LICENSE 116396 Construction Supervisor Permit Services BRANDONBOYLE AREA (SO FT) 0.00 EST COST($) 11658.00 PERMIT FEE ($) 50.00 142 RHODE ISLAND AVE CUMBERLAND, RI 02864 OWNER TIMOTHY & KIMBERLY AMES BUILDING DEPT BY ADDRESS 2 DEBS HILL RD YARMOUTH PORT MA 02675 &d � f f` /t'16 PHONE T H!S PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL'IW OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARAT-- CONSTRI.JCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBFRS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED* INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. _ POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING; INSPECTIONS APPROVALS WORK SHALL. NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF IN SECTIONS INDICATED ON THIS CARD UNT;L THE -INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAM BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION" ARn\/F