Loading...
HomeMy WebLinkAboutBLD-23-000991OF q/Z3/LZ TOWN OF YARMOUTH Building Department BUILDING' (508) 398-2231 ext.1261 PERMIT NO BLD-23-000991 PERMIT ISSUE DATE 09/22/2022 JOB WEATHER CARD APPLICANT Freedom Forever Massachusett: PERMIT TO Repair AT (LOCATION) 107 MERCHANT AVE, YARMOUTH, MA 02675 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 136.105 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Roof mounted pv solar panels- 4.800Kw system- 12 total panels- 200A -- OKH CONTRACTOR approval9/14/22 LICENSE CS-116415 Construction Supervisor Freedom Forever Massachusetts LLC AREA (SQ FT) 758,989,440. EST COST($) 33672.00 PERMIT FEE ($) 150.00 Aaron Wendt 135 Robert Treat Paine Dr. OWNER JON FISH & JOYCE MARIA BUILDING DEPT BY Taunton, MA 02780 ADDRESS , 107 MERCHANT AVE YARMOUTH PORT MA 02675 /-7%/,f d IA J,J //�JjMeo PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFcR TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. _ POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROCEED PERMIT WILL BECOME .'DULL AND VOID IF INPPECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. 3TAGES OF CONSTRUCTION ARn\/P