Loading...
HomeMy WebLinkAboutBLD-23-001599TOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23-001599 12/12/2022 Andre Tameirao (0- Izll?, 1ZZ BUILDING PERMIT JOB WEATHER CARD PERMIT TO Repair AT (LOCATION) 8 MANY OAKS CIR, YARMOUTH PORT, MA 02675 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 117.38 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Replace siding with White Cedar Shingles (Like for Like) and replace 1 window CONTRACTOR -- OKH approval 10/26/22 LICENSE CS-114272 Construction Supervisor 1 ASA Construction Group Andre Tameirao 114 Melbourne Road 1,366,172,28 EST COST($) 21879.00 PERMIT FEE ($) 100.00 AREA (SQ FT) Hyannis, MA 02601 OWNER FRANK &LYNNE MELLACE JR BUILDING DEPT BY ADDRESS 8 MANY OAKS CIRCLE YARMOUTH PORT MA 02675-2514 �j j( PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPPECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARMIP