Loading...
HomeMy WebLinkAboutBLD-23-00268812.E 121 Z)2 of YA TOWN OF YARMOUTH Building Department BUILDING (508) 398-2231 ext.1261 oy PERMIT PERMIT NO BLD-23-002688 ";T,;AC ;, , ISSUE DATE 12/12/2022 JOB WEATHER CARD APPLICANT Henry E Cassidy PERMIT TO Repair AT (LOCATION) 52G SOUTH SEA AVE, WEST YARMOUTH, MA 02 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 031.193C8 BUILDING IS TO BE: CONST TYPE REMARKS Install 280 sq ft R21 closed cell spray foam to crawlspace walls with 570 sq ft 10 mil poly vapor barrier -- 52G USE GROUP LICENSE CONTRACTOR AREA (SQ FT) 0.00 EST COST($) 2500.00 PERMIT FEE ($) 35.00 OWNER STANFORD BARBARA RAE BUILDING DEPT BY ADDRESS TOURIGNY LINDA L, 67 MECHINIC S, UNIT 31 ATTLEBORO MA 02703 i ��&i. PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARnvF