Loading...
HomeMy WebLinkAboutBLD-23-002717TOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23-002717 12/12/2022 James Dimopoulos �� izl�z►c Z BUILDING PERMIT JOB WEATHER CARD PERMIT TO Repair AT (LOCATION) 153 CAPT BACON RD, SOUTH YARMOUTH, MA 0 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 068.81 REMARKS Weatherization, Insulation & Air Sealing AREA (SQ FT) 702,056,520. EST COST($) 5260.00 OWNER PATRICIA PHELAN TR BUILDING IS TO BE: CONST TYPE ADDRESS CHRISTOPHER, MATTHEW PHELAN TR, 153 PERMIT FEE ($) 35.00 BUILDING DEPT BY USE GROUP CONTRACTOR LICENSE CS-104464 Construction Supervisor James Dimopoulos 25 Seven Sister Rd Haverhill, MA 01830 SOUTH YARMOUTH MA 02664 f- l§'I. / /-I& PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL CONSTRUCTION WORK: 1) FOUNDATIONS OR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL MEMBERS (READY FOR LATH OR FINISH COVERING) 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REFER TO DETAILED INSPECTION SCHEDULE APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A CERTIFICATE OF OCCUPANCY IS REQUIRED, SUCH BUILDING SHALL NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS l:I��►W/T�I� POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WHERE APPLICABLE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL PLUMBING/GAS AND MECHANICAL INSTALLATIONS. WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARCI\/F