Loading...
HomeMy WebLinkAboutBLD-23-001244�'q� TOWN OF YARMOUTH Building Department BUILDING of (508) 398-2231 ext.1261 oy PERMIT PERMIT NO BLD-23-001244 JOB WEATHER CARD ISSUE DATE 09/3012022 APPLICANT Kaila O'Farrell PERMIT TO Repair r AT (LOCATION) 7 WOODSIDE CIR, YARMOUTH PORT, MA 02675 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 123.93 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS WEATHERIZATION, AIR SEALING, CELLULOSE AREA (SQ FT) 1,745,667,00 EST COST($) 5900.00 PERMIT FEE ($) 35.00 OWNER MATHEW & LORI HATCH BUILDING DEPT BY ADDRESS .7 WOODSIDE CIR CONTRACTOR LICENSE MA Construction Supervisor Michael T McMahon and Son Inc Michael McMahon 2 Fuller Street Carver, MA 023301025 YARMOUTH PORT MA 02675-1800 /��/ PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWA K OR NY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM IN3PECTION3 REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED! NSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS 1NORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPI ICINE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION STAGES OF CONSTRUCTION ARn\/F