HomeMy WebLinkAboutBLD-23-001244�'q� TOWN OF YARMOUTH Building Department
BUILDING
of
(508) 398-2231 ext.1261
oy
PERMIT
PERMIT NO BLD-23-001244
JOB WEATHER CARD
ISSUE DATE 09/3012022
APPLICANT Kaila O'Farrell
PERMIT TO Repair
r
AT (LOCATION) 7 WOODSIDE CIR, YARMOUTH PORT, MA 02675 ZONING DISTRICT
Bldg. Type: Residential
SUBDIVISION MAP BLOCK LOT 123.93 BUILDING IS TO BE: CONST TYPE
USE GROUP
REMARKS WEATHERIZATION, AIR SEALING, CELLULOSE
AREA (SQ FT) 1,745,667,00 EST COST($) 5900.00 PERMIT FEE ($) 35.00
OWNER MATHEW & LORI HATCH
BUILDING DEPT BY
ADDRESS .7 WOODSIDE CIR
CONTRACTOR
LICENSE MA
Construction Supervisor
Michael T McMahon and Son Inc
Michael McMahon
2 Fuller Street
Carver, MA 023301025
YARMOUTH PORT MA 02675-1800 /��/ PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWA K OR NY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM IN3PECTION3 REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED! NSPECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
1NORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPI ICINE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION
STAGES OF CONSTRUCTION ARn\/F