Loading...
HomeMy WebLinkAbout25-E020 14 Pheasant Cove Circle Approved�� TOWN OF YARMOUTH C x 1146 ROUTE 28, SOUTH YARMOUTH, MA 02664-4451 ' �L= Telephone (508) 398-2231 Ext. 1292-Fax (508) 398-0836 MAR 1 12025 OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTM King's Highway 1gRMOUTH TOWN CLERK RE APPLICATION FOR Historic District NAR 11'25 PM3'39 CERTIFICATE OF EXEMPTION Application is hereby made for the issuance of a Certificate of Exemption under Sections 6 and 7 of Chapter 470 of Acts of 1973, as amended, for the proposed work as described below and on plans, drawings, or photographs accompanying this application. Type or print lanibly: Address of proposed work: 14 Pheasant Cave Circle _ Map/Lot # 14933 owners): Douglas & Laura Mance Phone #: 520 419-7272 All applications must be submitted by owner or accompanied by letter from owner approving submittal of application. Mailing address: 172 E Croydon Park Rd -Tucson, AZ 85704 Year built: 2003 Email: Lmance@IOngrealty.com Preferred notification method: X Phone Email Agent/Contractor: Pt_J Carpentry Phone #: 7744878089 Mailing Address: 21 Fruean Ave Al — Email: Thaynna@pljcarpentryinc.com Preferred notification method: 11 Phone Emai Descri tion of Proposed Work Additional Rages may be attached if necessary): Replace Deck Rear of house. Not visible from any public way. See attached plan Signed (Owner or agent): C Date: 03/10/2 > Owner/contractor/agent is aware that a permit may be required from the Building Department. (Check other departments, also.) > This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever date shall be later. For Committee use oniv: Date: Amount Cash/CK#: Rcvd by: Date Signed31I f Ca ,> v; 4ol 1 Approved Approved with changes mm� Reason for denial: MAR 11 7r9; .. Old King's Highway HtstolIc District Signed: �' ��� ~ 2i 1 APPLICATION #: Sherman, Lisa From: Robert Wilkins Sent: Tuesday, March 11, 2025 3:11 PM To: Sherman, Lisa Subject: Re: 25-EO20 14 Pheasant Cove Circle Attachments: 25-EO20 14 Pheasant Cove Circle.pdf Attention!: This emait originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. approved 'ARMOUTH TOWN CLERK RE MAR 11125 Pm3:33 On Mar 11, 2025, at 2:58 PM, Sherman, Lisa <LSherman@yarmouth.ma.us> wrote: Residents would like to replace their back deck and add a small addition to it as well at 14 Pheasant Cove Circle. Please let me know if you need any additional information. Thanks Bob, Lisa Lisa Sherman Town of Yarmouth Administrator, Old King's Highway Historic District and Yarmouth Historical Commission 508-398-2231, ext. 1292 lsherman@yarmouth.ma.us MAR 11 2025 Old King's Highway Historic District TOWN OF YARMOUTH a p y 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 026644451 Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836 OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE WAIVER OF 45-DAY DETERMINATION The applicant/applicant's agent understands and agrees that due to the current declared National and State public health emergencies the determination of our Application for a Certificate of Appropriateness/Demolition/Exemption may not be made within 45 days of the filing of such application. The applicant agrees to extend the time frame within which a determination is to be made as required by the Old King's Highway Regional Historic District Act. SECTION 9 -Meetings, Hearings, Time for Making Determinations "As soon as convenient after such public hearing; but in any event within folly -five (45) days after the filing of application, or within such f rrther time as the applicant shall allow in writing, the Committee shall make a determination on the application. " Applicant understands that the review of this application will be scheduled as soon as the situation allows. Thaynna Santana Rodrigues Applicant/Agent Name (please print): Applicant/Agent signature: MAR 11 2025 Old King's Highway Historic District Application #: K.f41 1. Date: 03/10/25 MAR 1 12025 Old King's Highway Historic District �5-E020 mNK22z oe� MAR 1 1 2025 MA & � Old King's Highway din mISA Historic Disfict y -Df+tto �m co \ ro xQlw N d0 VpS09� � boo'" w z!� II 0 ILA p, ' 1 n 0. n u 00LOA � oO n roop O _. 6� X CD [l1 i 1� N tD Q O �\ QI �. 0 (O P ()I 1 ill -P ILe O IV Ul N OVl -T -T — •- r '' — 'A VpL,Lq'1� � Q � y �Y 9p a n � W Cv rm C yy N �, A tf O l.P lD $ •� x M OD Mtn T D V N �O r7G g FrQ ��fi F � N ' D w — 6 r O1 4�- 3 Q 411 Q T li 4 a 00 O O (A O 3 z. N V O '� fD (D 0 C to l.Q i7 C O O �' O ler treat 01 rq O in N I •" f7 �. 4 CL �C 3 C if" � �• < 21 D o o O{ O O p Q y g bak "00d m ro o tv d onw, S M -0-` ;, o n v . G °pkaut m Q N (n D z ooC H c j C n @ n a d IPa. s l'' D D zi, (-i 25 E 0 2 0 12025 Highway District f 11 Hi N decks.00m O O 0 Y Q P�� m Hui, y2� m " r; MAR 1 [ 12025 !d King' j Highwa Historic District W M m O z MAR I 1 King store 9 8 m N CC isrr� pp � n a GGp coy 2 D.y w 2 m�t 25-EO20 2x10 Ledger Buard to be flashed and bolted (2) 1i2' bolts with washers or equivalent every Won tenter. (See ledger detail in deck construction guide) Joists to be 2x10 pressure treated southern yellow pine,nstalled 16" on center. Beams to be 2-2x10 pressure treated southern yellow pine nailed. Guard Rails to be 36' high with less than 4' openings per IRC code. (See rail detail in deck construction guide) Stairs to be busR max rise 7-314" min rise 4" in run 10- per IRC code. (See stair detail n deck construction guide) Decking lobe SiU6 Pressure Treated Pine (Follow manufacturers installation instructions) All hardware to be corrosion resistant and installed per manufacturers instructions. ghway >tdct §|I!. n # ! |�:�; £ PC 4 \ 2H } ; 2 2 B �k h k 2 | , ■ 0 |t|/ z k m | ! MAR 1l7§ § 2 2 DU King% Highway / Historic District k � 2 § ----� 2 k r § § § . / ! M k | � AR1i35 k m # ® 2 § | Of K ng% Highway m | Historic District § § |§( k �K� § m AK� 7■■ | kkkk PC - A P PUP |k 0§k f o2 2 -2§ 2|! § ■ moLedger Board ■beflashed and boltedm mmwfth washers or equivalentevery , on _+ (See ledger «rm decksecom deck con _�¥M �mm�motreated southern installed ?«center. pressure yellow pine Beams mbezx0pressure treated southern yellow pine nailed. Guard Rails to be 36" high then « openings per IRC code. (See rail detail wdock construction guide) Stairs mbe built max rise 7-3/4'min rise «■ run om _IRC code. (See stair detail .deck __ins m Decking to be 5146m_re Treated Pine. (Follow _a_ers 6 , instructions) All hardware mbe corrosion resistantom installed per manufacturers' instructions. n r,_ M n n n A3 u Ail — F4 U |.- ( l�|� * }||§| 2 § 2 ! IN 2 § 7§&`K ` 9 k§|§ § — 9!|- § , ■ q K v m � � � a k ` | /R]l15 \ Old King% Highway K I Historic DlmHC £ ) ) ! | r % \ \ z rn § � ` R1125 k ! 2 m | Old King% Highway k 2 Historic District) 2 2 7 k � § k�| 2 * ; ■;;� !;. k K§� lee- \\ #■ Hip § §7 �� W� §|77 G |N �)\2 # «■ §§| q _ � � ■ 2xI0 Ledger Board to be flashed and boltedm, &sat washers or equivalent every Won _# A.ledg r«wa ___nsm deck _.m�zo pressure treated southern yellow pine installed 16' on_* Beams mbezxopressure treated southern yellow pine mk Guard Rails to be n with _ then ropenings per IRC _e. A,_ __, deck ___n#m Stairs to be _ rise z « mow_ ?�� code. (See .a« -dam __Any w Decking to be6m_re mated met _ _nufa _eW installation inst_, All wed_ to be corrosion resistant and ___per manufacturers' instructions. 2 5— E 0 2 O qi de m Z X Z m 0 0 z X V D m m LIAR 1 17025 Old King's H Historic Di 25 Hi0hway Footings to be installed to 48' depth as is required by your local building ordinance. Frost footing sizes based on 55 Ibs per square foot tributary loads applied to 1500 psi soil compression capacity (assumed clay soil). See footing detail in deck construction guide. 2 5 - E 0 2 0 A"L_ PLJ CARPENTRY CAPE COD -MA PI j Carpentry ESTI MATE A71 api MD MAR 11 7025 Old King's Highway Historic District 21 Fruean Ave, A-1 South Yarmouth, MA 02664 Phone: (774) 487-8089 Email: contact@pljcarpentryinc.com Web: pljcarpentry.us Description DECK Prepared For Laura Mance 14 Pheasant Cove Cir, Yarmouth MA (508) 419-7272 (520) 907-2564 MAR 1 1 2025 Old King's Highway Historic District OPTION 1 - DECKING REMODELING & CABLE RAILING Scope of Work: Deck Removal and Reconstruction 1. Demolition and Disposal Estimate # Date • Completely remove all existing decking boards, guardrails, keeping the main frame. • Dispose of all removed materials in accordance with local regulations: Removing the old decking ensures that any compromised materials are replaced. Starting with a clean slate allows for a stronger, safer, and more durable deck structure. 2. Frame Construction • Build a new, robust addition frame to support the deck. • like project design: • Frame blocks for all split boards to ensure stability. • Frame blocks for all posts for proper alignment and load distribution. • Adjustments as needed to account for irregularities or unique site conditions: A well-built frame is the backbone of a long-lasting deck. Frame blocks add strength and stability, preventing issues like sagging or misalignment over time. 3. joist Protection • Apply flashing tape to all joists of the new frame to protect against water infiltration: 1568 01/08/2025 Total $49,785.00 $49,785.00 Paqe 1 of 4 2 5 h 0 2 0 Flash tape extends the life of the frame by preventing water damage, rot, and corrosion, particularly in areas where fasteners penetrate the wood. 4, Decking Installation • Install new HARBOR GRAY FROM WOLF,decking boards using hidden composite fasteners for a seamless appearance. • Incorporate a picture frame design on the edges for an elegant and finished look. • Alternatively, install pressure -treated wood decking, depending on client preference: Hidden fasteners create a clean, polished surface with no visible screws or nails. A picture frame design enhances aesthetics by defining the edges and reducing wear on the borders. POSSIBLE: Pressure -treated wood is an economical option wi r while composite decking offers a modern, low -maintenance solution. 1 DXDDO 5. PVC Trim Installation MAR 11 2025 • Install special white PVC trim on all; • Kick boards Old King's Highway • Risers Historic District • Rim joists: PVC trim resists moisture, rot, and insects, providing a clean, finished appearance while requiring minimal maintenance. 6. Railing Installation • Install new Railings • CABLE RAILINGS • Post sleeves • Skirts • Caps: MAR 1 12025 Old King's Highway Historic District PVC railings are durable, weather -resistant, and maintain their appearance over time. The classic New England design enhances the decks aesthetics and complements traditional architecture. • All materials, labor, and disposal costs are included in the quote. 25-E02Q Paqe 2 of 4 -The HOMEOWNER agrees to pay the PLj CARPENTRY a total amount mention above for the Carpentry Services upon completion of the job. An initial payment is due upon signing this Contract, with the remaining balance to be paid immediately upon satisfactory completion of the Carpentry Services. -This change ensures that the payment will be made promptly upon the completion of the carpentry work. Please remember to consult with a legal professional to ensure that the contract meets your specific requirements and local regulations. - Anything not mentioned on work of scope will be charged extra; - Any verbal agreement that is not included on original scope of work has to be added to a new contract and signed TIMING - Our average starting date for any project is 2 to 4 weeks after the down payment check is received - Works with permits involved requires 3 to 6 weeks to be started considering the entire permit process and different politics from every town - Any different starting dates from the two items above has to be informed to the costumer and agreed first - Any projects that involves special material orders might affect the timeline - Working time expectations informed on the scope might differ according to weather issues or for any special occasion such as workers transportation issue, health problems, holidays and weekends DUMSPERS AND DISPOSAL - Dumpsters has to be placed as soon as work starts - None personal belongs allowed on dumpsters during working time - Dumpsters included are just related to the demolition on job site - Dumpsters has to be removed when the job is done - All metal wastes has to be collected properly and disposed signing this document, the customer agrees to the services and conditions outlined in this document. Signed on: 01/08/2025 MAR 1 1 2025 ...Old l ing',s H.,qh ay . Historic District Signed on: 01/08/2025 PLJ Carpentry =@W MAR 11 7025 Old King's Highway Historic District Laura Mance 25--E020 Page4of4 RETAIN WALL $3,300.00 RETAINING WALL $3,300.00 REMOVE OLD ROTTED TIMBERS. BUILD NEW RETAINING WALL WITH NEW TIMBER Subtotal $53,085.00 Total $53,085.00 Deposit Due $21,234.00 Payment Schedule Deposit (40%) $21,234.00 1 st Payment (30%) $15,925.50 Final Payment (30%) $15,925.50 aMD"M MAR11IM Old King's Highway Kistonc 0istndt MAR 1 12025 Old King's Highway Historic District Paoe 3 of 4