Loading...
HomeMy WebLinkAboutBHDC-24-29PROP. 4" SCH. n 40 PVC-% PROVIDE H.D.P.E. RISER w/ REMOVABLE, SECURED, WATER -TIGHT COVER TO F.G. OVER OUTLET COVERS (TYP OF 2) F.G. OVER P.C. EL.= 16.2' (max) DISCONNECT VALVE (12" bgs) 9" MIN. V\,-2" SCH. 40 36"MAX. O D-BOX 21,10 30"0 5.00, )wrt C9? 1% min. L=2'± 10" T--TEE LIQUID �� II 12.15 EL.=9.89' 12.50' LEVEL 12.25 -'-1 -° TEE UMP ON �� TEE .=9.39'18.9'TOO FND'�EL UMP OFF EL.=8.89' 22" ZABEL FILTER 6" CRUSHED STONE MODEL # A1801 4x22 gagga EL.=7.56' OVER MECHANICALLY (GAS BAFFLE ON BOTTOM) COMPACTED BASE AI I � rl� TANIV non CAI -ON PUMP CHAMBER LENGTH 10'-6" WIDTH 5'-8" DEPTH 5'-8" LENGTH 8'-6" WIDTH 4'-10" DEPTH 5'-8" 'CONTRACTOR TO VERIFY PROPOSED 1,500 GALLON SEPTIC TANK ~� EXISTING ELEVATION PRIOR �ROPOSED 1 ,000 G/ ! " ON PUMP CHAMBER TO ANY WORK 8� NOTIFY ENGINEER ¢`" ^�� "'�. NOT TO SCALE_ SWING -TIES f - `bR, y 1 -24Ic -�' o � L6 M / �0 rr U) 26✓� Q DESCRIPTION HCA HC-2 U.PAB SC SEPTIC TANK COVER IN (1) 20.9' 26.1' -- -- SEPTIC TANK COVER OUT (2) 28.7' 32.8' -- -- PUMP CHAMBER COVER IN (3) 33.0' 36.6' -- -- PUMP CHAMBER COVER OUT (4) 38.6' 41.6' -- -- CORNER OF STONE (5) -- -- 10.9 54.5' CORNER OF STONE (6) -- -- 17.9' 67.0' CORNER OF STONE (7) -- -- 46.6' 69.1' CORNER OF STONE (8) - - 44.3' 57. 1' /I w / � O w �F'1 0' �O (b PROPOSED THREE (3) 500 GALLON H-20 LEACHING CHAMBERS w/ STONE PROPOSED PVC VENT;, EXACT LOCATION PER OWNER ( O S- - Cl) 17' O U.P. #4B ap - TOP OF FOUNDATION = 23.7'± PROVIDE H.D.P.E. RISER w/ COVER WITHIN 6" OF F.G. OF FINISH GRADE INLET COVERS (TYP OF 2) @ FND. EL.= 16.0'± F.G. OVER TANK EL.=16.6' (max) TEES TO BE CENTERED DIRECTLY 9" MIN. UNDER RISERS 21" MIN. 36"MAX. PROP (T YP)--, , EL.=13.23' 4" SCH. 40 PVC L=13'± SLOPE @ 1% min. 6+ CLkNECTI 3" 2" DROP MIN. - (° 3" DROP MAX. g-, -------- <h 14" 48" INV OUT = 2" PVC 27.9 FINISH GRADE OVER D-BOX = 30.5'± REMOVABLE WATERTIGHT RISER TO WITHIN 6" OF FINISHED GRADE 5" DIA. OUTLET(S) I 9" MIN. 36"MAX. 4" PVC OUT TO SAS 6" 12" MIN. / 6" CRUSHED STONE OVER MECHANICALLY COMPACTED BASE 5 OUTLET DISTRIBUTION BOX TO BE INSTALLED ON A LEVEL STABLE BASE. FIRST TWO FEET OF OUTLET PIPES TO BE LAID LEVEL. CROSS SECTION VIEW -20-DIS i ,-`IjUTIN BOX DETAIL NOT TO SCALE INSTALL 1-1/4" PVC TO HOUSE. JOINTS TO BE MADE WATERTIGHT. WIRE PUMP AND FLOATS TO SIMPLEX CONTROL PANEL No. 1-CC2 NEMA-1 MFG. HOOVER INSTRUMENTS. NEMA 4 JUNCTION BOX CORROSION RESISTANT & LIQUID -TIGHT CABLE CONNECTORS SUPPORTED CONNECTORS SUPPORTED BY 1-1/4" PVC CONDUIT, JOINTS TO BE MADE WATERTIGHT 13" 6„ 3„ 13" co 4.0' ALARM i LIQUID v LEVEL UM ON C 10 c PUMP OFF FINISH GRADE OVER CHAMBERS = 302- 31.5' PROP. VENT WITH CHARCOAL FILTER TO ABOVE GRADE E N E RAL N C TE SLOPE @ 2%MIN. OVER SYSTEM 3/4' TO 1-1/2 DOUBLE WASHED STONE TO CROWN OF PIPE 1. UNLESS OTHERWISE NOTED, ALL SYSTEM COMPONENTS AND CONSTRUCTION - 4" SCHEDULE 40 PVC METHODS SHALL BE IN ACCORDANCE WITH TITLE 5 OF THE STATE ENVIRONMENTAL STON MIN SLOPE 1% N OFE OR GEOTEXT ILE FILTER FABRIC DOUBLE WASHED CODE AND ANY APPLICABLE LOCAL RULES. 2. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. TOP OF SAS - 28.50' PLACE H-20 RISER ON 9" MIN. ALL CHAMBERS wl 3. 4" SCHEDULE 40 PVC PIPE WITH WATER TIGHT JOINTS SHALL BE USED IN DISPOSAL 27.50' 36" MAX. BREAKOUT EL = 28.00' PIPED INLETS TO- SYSTEM UNLESS OTHERWISE NOTED. WITHIN 6" OF F.G. 1 4. TO PREVENT BREAKOUT, THE PROPOSED FINISHED GRADE SHALL NOT BE LESS THAN ELEVATION = 28.00' FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE SAS. UNLESS A o$o O 00 0 two ��o 0 0 40 MIL GEOMEMBRANE LINER IS PLACE AT LEAST FIVE FEET FROM S.A.S. AND THE TOP OF THE LINER IS NOT LESS THAN THE BREAKOUT ELEVATION. 000 u 5. SLOPE ALL SOLID PIPE AT 1.0% MINIMUM. 0o THIS SYSTEM IS NOT DESIGNED FOR A GARBAGE DISPOSAL. 0 0 0 0 0 0 0 ao 0 0 0 0� - 7. LOCAL BOARD OF HEALTH AND DESIGN ENGINEER TO BE NOTIFIED PRIOR TO BACK 0 0 0 0 0 0 0 00 0 0 0 o o FILLING WHEN SYSTEM IS NEARLY COMPLETE AND READY FOR INSPECTION. SYSTEM IS NOT TO BE BACK FILLED WITHOUT FIRST OBTAINING APPROVAL FROM BOARD OF HEALTH AND DESIGN ENGINEER. 1/ 4.0' 8 5' (TYP) 4.0' 4 0' 4 83' 4.0' 8. ELEVATIONS BASED ON N.A.V.D. 88 DATUM. SEE BENCHMARK SHOWN ON PLAN FOR ELEVATION. 33.5' (Tl'P.) 9. CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION GROUND WATER ELEV= < 18.70' THROUGH DIG -SAFE AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE AT 12.83' 1-888-DIG-SAFE AND ANY OTHER APPLICABLE AGENCIES. REPORT ANY DISCREPANCIES 3 - 500 GALLON CHAMBERS 5' MI". CHAMBER END VIEW TO THE DESIGN ENGINEER. TYPICAL CHAMBER PROFILE H-2O CHAMBEP DETAILS 10. ALL JOINTS WHERE PIPE ENTERS AND EXITS CONC. STRUCTURES SHALL BE MADE WATERTIGHT. NOT TO SCALE 11. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING NOTE: PUMP MUST BE EQUIPPED WITH A HIGH LEVEL ALARM LOCATED IN THE BUILDING SERVED WHICH IS POWERED BY A CIRCUIT SEPARATE FROM THE CIRCUIT TO THE PUMP. 2 SCH. 40 TO D-BOX 2" BALL VALVE w/ UNIONS SCH. 80 PVC GEORGE FISHER CO. MODEL NO. 560 2" SCH. 40 TEE w/ CLEAN -OUT CAP - 1/4" WEEP HOLE IN DISCHARGE PIPE HOISTING CABLE 7 x 19 STAINLESS STEEL 1/8" DIA. / 1,760 LB. STRENGTH I -2" BALL CHECK VALVE SCH. 80 PVC 100 P.S.I. FLOWMATIC MODEL No. 208S (2) WIDE ANGLE CONTROL FLOATS �� o u \ 1/4" WEEP HOLE IN DISCHARGE PIPE (BARNES 073618) \� 1: PUMP ON/OFF 120 ACTIVATION 2" SCH. 40 PVC DISCHARGE PIPE 2: ALARM ACTIVATION BARNES 2SEV-L PUMP' n 75 H.P.' 240V; 2" DISCHARGE PASSING 2" SOLIDS OR APPROVED EQUAL 1,000 GALLON PUMP CHAMBER. NOT TO SCALE NOTES: 1.) MAGNETIC MARKING TAPE SHALL BE PLACED ALONG THE TOP EDGE OF EACH SEPTIC SYSTEM COMPONENT. 0 2.) CONTRACTOR SHALL VERIFY SOIL CONDITIONS IN THE LOCATION OF THE PROPOSED LEACHING SYSTEM TO FORCE MAIN TO BE c) ENSURE CONSISTENCY WITH TEST PIT DATA SHOWN ON THIS PLAN. REPORT TO ENGINEER AND LOCAL BOARD \ vm PROP i20\ 6) \ �,� SLEEVED WITHIN 10' F_) m OF HEALTH IF SOILS ARE NOT CONSISTENT WITH TEST PIT DATA. f 15 WATER LINE CROSSIN� H-20 +lI J� - \ -�` D-BOX m 32 - 3.) PROPOSED WORK IS NOT LOCATED WITHIN A DEP APPROVED ZONE II. TP 1 Benchmark 241_ - V \ ! Corner of Wall 4.) SWING TIES SHOWN ON THIS PLAN ARE PROVIDED ONLY AS A COURTESY FOR THE INSTALLER. INSTALLER `-- 29x ^o� \ Elev. = 25.09' SHALL VERIFY SWING TIE MEASUREMENTS IN THE FIELD PRIOR TO INSTALLING THE SYSTEM. CONTRACTOR I fie' N.A.V.D. 88 SHALL NOTIFY ENGINEER IF MEASUREMENTS APPEAR TO BE INCORRECT. �4, ``" - -- - 28 - - 30 2$. - 5.) ELECTRIC LINES FROM PUMP CHAMBER TO CONTROL PANEL AT THE BUILDING SHALL BE INSTALLED BY THE �Q- J 17„ CONTRACTOR. ELECTRIC LINES TO BE ROUTED FROM PUMP CHAMBER TO BUILDING WITH THE LEAST SC Pv ! / n _ - DISTURBANCE TO THE PROPERTY AS POSSIBLE. -28 26' - 24 - . - ' „ / 24 , � 15" `♦ 24 No l `^T �- - - 15 /\\O-} Off, / `� 19co S _ - \ „ rR�q \�GAT / / l l / i(`�/ 0, _ -20-------` 7--- - �� 22- Co LO ri O ") \ / o - -14 - -- ` 14„ - j 18 9 HC,q' \ �� / / / / / TOP OF COASTAL BANK PER THE _ _ - - - / #29 � / / //// / /// // / / Z STANDARDS UNDER MA DEP DWW 18" EXISTOR / / / / / / / G POLICY 92-1 (ISSUED: MARCH 3, 1992) - 10_ ` tiry �• N6i g -BEDR NO I�22 /l l l Jb� / / / / / �4 Q • 8 � ai TOF=23.7'± I l l / j�// l l // /I� ��'� HC-2 / / per/ / / / / //per O ROPOSED 1,000 GJ L. \ \ O \ 2p / / / / / // //p4 p�Co PUMP CRAM R�\ \�. �C''► �\ pN / ///'c/ /�pw G - 4 EROSION 76. P TANK ` CONTROL 7v EXISTING CESSPO TO BE \ ' ".RRER .i- / ,moo LOOD ZONE LINE DIVIDING ZONE X FROM ZON E P PED & REMOVED { P OF 2)J `�F�7 i �/ �o a/� (EL.9) BASED ON ACTUAL ON -THE -GROUND FIELD NSTRUMENT SURVEY (B.F.E. = 9.0' NAVD 88 BASED N M. #25001CO579J) (EFFECTIVE JULY 16, 2014) TOP OF COASTAL BANK PER THESTANDARDS UNDER UNDER MA DEP DWW POLICY -1 (ISSUED: MARCH 3, 1992). MAP 136 LOT 57 ' FLOOD ZONE LINE DIVIDING ZONE X FF • )M ZONE AE i - 2 55,320± S.F. (EL.9) BASED ON ACTUAL ON-THE-GRO: INSTRUMENT SURVEY (B.F.E. = 9.0' NA�'_ND FIELD 7 88 BASED ON 148.03' F.I.R.M. #25001CO579J) (EFFECTIVE JUL' 16, 2014) 1 N84° 49' 20"W SALT MARSH SIZE PLAN � S- \ ALE: 1" = 20' W Z N86o 07 10"E < Z 102.91' % o cn o O NC) = Q C J < - ON CJ Qf w 0 o !lo 6o H- Z I -70.49'- Q E,86° 07' 10"W I L=23.67 R=58.00 LO o S040 13' 05"E "- 191.56' w c> - U? ni it j II I� S040 39' 55"W I ! 75.00' li 20' CV LO �. 0)- &, M M / 0QO / Q I - 148 ,::3' / N84' 49 20"W �0 S84` 49' 20'E 17.00' I�!DEX PLAN -.,ALE: V = 100' 100 P 0 Pol'nt of Rocks LOCUS PLAN SCALE: 1" = 1000' DESIGN DATA NUMBER OF BEDROOMS (EXISTING) 4 NUMBER OF BEDROOMS (DESIGN) 4 ` DESIGN FLOW 110 GAUDAY/BEDROOM TOTAL DESIGN FLOW '440 GAUDAY) DESIGN FLOW x 200 = 880 L/DAY USE PROPOSED 1,500 GALLON SEPTIC TANK 1 INSTALL 3 - 500 GAL. CHAMBERS w/ STONE SIDEWALL CAPACITY (LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.) = GAUDAY (33.5' + 12.83) (2) (2') (0.74 GPD/ S.F.) =137.1 GAL/DAY BOTTOM CAPACITY (LENGTH x WIDTH) (0.74 GPD/S.F.) = GAL/DAY (33.5' x 12.83') (0.74 GPD/S.F.) = 318.1 GAL/DAY TOTALS - TOTAL NUMBER OF CHAMBERS 3 TOTAL LEACHING AREA 615.1 SQ.FT. TOTAL LEACHING CAPACITY 455.2 GAL./DAY DOSING & STORAGE REQUIREMENTS DESIGN FLOW: 440 G> DOSING REQUIRED: 4 CYCLES / DAY 440 GPD / 4 = 110 GALS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 110 GALS/CYCLE = 250 GALS/FT = 0.44 FT/CYCLE (USE 0.50' TO PROVIDE FOR BA.CKFLOW) STORAGE REQUIRED ABOVE WORKING LEVEL: 440 GAL. STORAGE PROVIDED ABOVE WORKING LEVEL: 500 GAL. REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM 'EST cT PIT DATA APPROPRIATE AUTHORITY. CCv ! 12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS PERC NO. N/A LOCATED UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, INSPECTOR: Barry Lewis (BOH) DRIVES. OR TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING. EVALUATOR: Michael Pimentel, EIT, CSE 13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES. C.S.E. APPROVAL DATE: Oct. 27, 1999 14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE DATE: November 2, 2023 MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY. TEST PIT #: 1 REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY, FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3). ELEV TOP = 29.70' 15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN ELEV WATER = < 18.70' SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK. PERC RATE _ < 2 min./inch 16. PROPOSED PROJECT IS LOCATED WITHIN: DEPTH OF PERC - 32" - 50 ASSESSOR'S MAP 136 LOT 57 OWNER OF RECORD: NB CLAYWORKS LLC TEXTURAL CLASS: I ADDRESS: 145 ST. BOTOLPH STREET; UNIT 15 BOSTON, MA 02115 11 X N 0 6" B 32" r C 29.70 FEMA FLOOD ZONE COMMUNITY PANEL # 25001 CO579J 29.20' 17. DEED REFERENCE: BOOK 34481, PAGE 163 18. PLAN REFERENCE: PLAN BOOK 190, PAGE 63 27.03' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. 22. TOP OF COASTAL BANK, AS SHOWN ON THIS PLAN, WAS DELINEATED BASED ON THE STANDARDS UNDER MA DEP DWW POLICY 92-1 (ISSUED: MARCH 3, 1992). 23. LOCATION OF EXISTING WATER LINE, ELECTRIC LINE, TELEPHONE LINE, AND CABLE LINE SHOWN ON THIS PLAN IS APPROXIMATE ONLY AND SHALL BE FIELD VERIFIED AT THE START OF INSTALLATION. INSTALLER TO REPORT TO ENGINEER IF LOCATION IS DIFFERENT THAN SHOWN ON THIS PLAN. Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC W Z N86o 07 10"E < Z 102.91' % o cn o O NC) = Q C J < - ON CJ Qf w 0 o !lo 6o H- Z I -70.49'- Q E,86° 07' 10"W I L=23.67 R=58.00 LO o S040 13' 05"E "- 191.56' w c> - U? ni it j II I� S040 39' 55"W I ! 75.00' li 20' CV LO �. 0)- &, M M / 0QO / Q I - 148 ,::3' / N84' 49 20"W �0 S84` 49' 20'E 17.00' I�!DEX PLAN -.,ALE: V = 100' 100 P 0 Pol'nt of Rocks LOCUS PLAN SCALE: 1" = 1000' DESIGN DATA NUMBER OF BEDROOMS (EXISTING) 4 NUMBER OF BEDROOMS (DESIGN) 4 ` DESIGN FLOW 110 GAUDAY/BEDROOM TOTAL DESIGN FLOW '440 GAUDAY) DESIGN FLOW x 200 = 880 L/DAY USE PROPOSED 1,500 GALLON SEPTIC TANK 1 INSTALL 3 - 500 GAL. CHAMBERS w/ STONE SIDEWALL CAPACITY (LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.) = GAUDAY (33.5' + 12.83) (2) (2') (0.74 GPD/ S.F.) =137.1 GAL/DAY BOTTOM CAPACITY (LENGTH x WIDTH) (0.74 GPD/S.F.) = GAL/DAY (33.5' x 12.83') (0.74 GPD/S.F.) = 318.1 GAL/DAY TOTALS - TOTAL NUMBER OF CHAMBERS 3 TOTAL LEACHING AREA 615.1 SQ.FT. TOTAL LEACHING CAPACITY 455.2 GAL./DAY DOSING & STORAGE REQUIREMENTS DESIGN FLOW: 440 G> DOSING REQUIRED: 4 CYCLES / DAY 440 GPD / 4 = 110 GALS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 110 GALS/CYCLE = 250 GALS/FT = 0.44 FT/CYCLE (USE 0.50' TO PROVIDE FOR BA.CKFLOW) STORAGE REQUIRED ABOVE WORKING LEVEL: 440 GAL. STORAGE PROVIDED ABOVE WORKING LEVEL: 500 GAL. REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM 'EST cT PIT DATA APPROPRIATE AUTHORITY. CCv ! 12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS PERC NO. N/A LOCATED UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, INSPECTOR: Barry Lewis (BOH) DRIVES. OR TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING. EVALUATOR: Michael Pimentel, EIT, CSE 13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES. C.S.E. APPROVAL DATE: Oct. 27, 1999 14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE DATE: November 2, 2023 MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY. TEST PIT #: 1 REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY, FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3). ELEV TOP = 29.70' 15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN ELEV WATER = < 18.70' SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK. PERC RATE _ < 2 min./inch 16. PROPOSED PROJECT IS LOCATED WITHIN: DEPTH OF PERC - 32" - 50 ASSESSOR'S MAP 136 LOT 57 OWNER OF RECORD: NB CLAYWORKS LLC TEXTURAL CLASS: I ADDRESS: 145 ST. BOTOLPH STREET; UNIT 15 BOSTON, MA 02115 11 X N 0 6" B 32" r C 29.70 FEMA FLOOD ZONE COMMUNITY PANEL # 25001 CO579J 29.20' 17. DEED REFERENCE: BOOK 34481, PAGE 163 18. PLAN REFERENCE: PLAN BOOK 190, PAGE 63 27.03' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. 22. TOP OF COASTAL BANK, AS SHOWN ON THIS PLAN, WAS DELINEATED BASED ON THE STANDARDS UNDER MA DEP DWW POLICY 92-1 (ISSUED: MARCH 3, 1992). 23. LOCATION OF EXISTING WATER LINE, ELECTRIC LINE, TELEPHONE LINE, AND CABLE LINE SHOWN ON THIS PLAN IS APPROXIMATE ONLY AND SHALL BE FIELD VERIFIED AT THE START OF INSTALLATION. INSTALLER TO REPORT TO ENGINEER IF LOCATION IS DIFFERENT THAN SHOWN ON THIS PLAN. Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC LO o S040 13' 05"E "- 191.56' w c> - U? ni it j II I� S040 39' 55"W I ! 75.00' li 20' CV LO �. 0)- &, M M / 0QO / Q I - 148 ,::3' / N84' 49 20"W �0 S84` 49' 20'E 17.00' I�!DEX PLAN -.,ALE: V = 100' 100 P 0 Pol'nt of Rocks LOCUS PLAN SCALE: 1" = 1000' DESIGN DATA NUMBER OF BEDROOMS (EXISTING) 4 NUMBER OF BEDROOMS (DESIGN) 4 ` DESIGN FLOW 110 GAUDAY/BEDROOM TOTAL DESIGN FLOW '440 GAUDAY) DESIGN FLOW x 200 = 880 L/DAY USE PROPOSED 1,500 GALLON SEPTIC TANK 1 INSTALL 3 - 500 GAL. CHAMBERS w/ STONE SIDEWALL CAPACITY (LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.) = GAUDAY (33.5' + 12.83) (2) (2') (0.74 GPD/ S.F.) =137.1 GAL/DAY BOTTOM CAPACITY (LENGTH x WIDTH) (0.74 GPD/S.F.) = GAL/DAY (33.5' x 12.83') (0.74 GPD/S.F.) = 318.1 GAL/DAY TOTALS - TOTAL NUMBER OF CHAMBERS 3 TOTAL LEACHING AREA 615.1 SQ.FT. TOTAL LEACHING CAPACITY 455.2 GAL./DAY DOSING & STORAGE REQUIREMENTS DESIGN FLOW: 440 G> DOSING REQUIRED: 4 CYCLES / DAY 440 GPD / 4 = 110 GALS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 110 GALS/CYCLE = 250 GALS/FT = 0.44 FT/CYCLE (USE 0.50' TO PROVIDE FOR BA.CKFLOW) STORAGE REQUIRED ABOVE WORKING LEVEL: 440 GAL. STORAGE PROVIDED ABOVE WORKING LEVEL: 500 GAL. REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM 'EST cT PIT DATA APPROPRIATE AUTHORITY. CCv ! 12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS PERC NO. N/A LOCATED UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, INSPECTOR: Barry Lewis (BOH) DRIVES. OR TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING. EVALUATOR: Michael Pimentel, EIT, CSE 13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES. C.S.E. APPROVAL DATE: Oct. 27, 1999 14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE DATE: November 2, 2023 MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY. TEST PIT #: 1 REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY, FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3). ELEV TOP = 29.70' 15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN ELEV WATER = < 18.70' SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK. PERC RATE _ < 2 min./inch 16. PROPOSED PROJECT IS LOCATED WITHIN: DEPTH OF PERC - 32" - 50 ASSESSOR'S MAP 136 LOT 57 OWNER OF RECORD: NB CLAYWORKS LLC TEXTURAL CLASS: I ADDRESS: 145 ST. BOTOLPH STREET; UNIT 15 BOSTON, MA 02115 11 X N 0 6" B 32" r C 29.70 FEMA FLOOD ZONE COMMUNITY PANEL # 25001 CO579J 29.20' 17. DEED REFERENCE: BOOK 34481, PAGE 163 18. PLAN REFERENCE: PLAN BOOK 190, PAGE 63 27.03' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. 22. TOP OF COASTAL BANK, AS SHOWN ON THIS PLAN, WAS DELINEATED BASED ON THE STANDARDS UNDER MA DEP DWW POLICY 92-1 (ISSUED: MARCH 3, 1992). 23. LOCATION OF EXISTING WATER LINE, ELECTRIC LINE, TELEPHONE LINE, AND CABLE LINE SHOWN ON THIS PLAN IS APPROXIMATE ONLY AND SHALL BE FIELD VERIFIED AT THE START OF INSTALLATION. INSTALLER TO REPORT TO ENGINEER IF LOCATION IS DIFFERENT THAN SHOWN ON THIS PLAN. Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC 100 P 0 Pol'nt of Rocks LOCUS PLAN SCALE: 1" = 1000' DESIGN DATA NUMBER OF BEDROOMS (EXISTING) 4 NUMBER OF BEDROOMS (DESIGN) 4 ` DESIGN FLOW 110 GAUDAY/BEDROOM TOTAL DESIGN FLOW '440 GAUDAY) DESIGN FLOW x 200 = 880 L/DAY USE PROPOSED 1,500 GALLON SEPTIC TANK 1 INSTALL 3 - 500 GAL. CHAMBERS w/ STONE SIDEWALL CAPACITY (LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.) = GAUDAY (33.5' + 12.83) (2) (2') (0.74 GPD/ S.F.) =137.1 GAL/DAY BOTTOM CAPACITY (LENGTH x WIDTH) (0.74 GPD/S.F.) = GAL/DAY (33.5' x 12.83') (0.74 GPD/S.F.) = 318.1 GAL/DAY TOTALS - TOTAL NUMBER OF CHAMBERS 3 TOTAL LEACHING AREA 615.1 SQ.FT. TOTAL LEACHING CAPACITY 455.2 GAL./DAY DOSING & STORAGE REQUIREMENTS DESIGN FLOW: 440 G> DOSING REQUIRED: 4 CYCLES / DAY 440 GPD / 4 = 110 GALS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 110 GALS/CYCLE = 250 GALS/FT = 0.44 FT/CYCLE (USE 0.50' TO PROVIDE FOR BA.CKFLOW) STORAGE REQUIRED ABOVE WORKING LEVEL: 440 GAL. STORAGE PROVIDED ABOVE WORKING LEVEL: 500 GAL. REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM 'EST cT PIT DATA APPROPRIATE AUTHORITY. CCv ! 12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS PERC NO. N/A LOCATED UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, INSPECTOR: Barry Lewis (BOH) DRIVES. OR TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING. EVALUATOR: Michael Pimentel, EIT, CSE 13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES. C.S.E. APPROVAL DATE: Oct. 27, 1999 14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE DATE: November 2, 2023 MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY. TEST PIT #: 1 REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY, FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3). ELEV TOP = 29.70' 15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN ELEV WATER = < 18.70' SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK. PERC RATE _ < 2 min./inch 16. PROPOSED PROJECT IS LOCATED WITHIN: DEPTH OF PERC - 32" - 50 ASSESSOR'S MAP 136 LOT 57 OWNER OF RECORD: NB CLAYWORKS LLC TEXTURAL CLASS: I ADDRESS: 145 ST. BOTOLPH STREET; UNIT 15 BOSTON, MA 02115 11 X N 0 6" B 32" r C 29.70 FEMA FLOOD ZONE COMMUNITY PANEL # 25001 CO579J 29.20' 17. DEED REFERENCE: BOOK 34481, PAGE 163 18. PLAN REFERENCE: PLAN BOOK 190, PAGE 63 27.03' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. 22. TOP OF COASTAL BANK, AS SHOWN ON THIS PLAN, WAS DELINEATED BASED ON THE STANDARDS UNDER MA DEP DWW POLICY 92-1 (ISSUED: MARCH 3, 1992). 23. LOCATION OF EXISTING WATER LINE, ELECTRIC LINE, TELEPHONE LINE, AND CABLE LINE SHOWN ON THIS PLAN IS APPROXIMATE ONLY AND SHALL BE FIELD VERIFIED AT THE START OF INSTALLATION. INSTALLER TO REPORT TO ENGINEER IF LOCATION IS DIFFERENT THAN SHOWN ON THIS PLAN. Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC N 0 6" B 32" r C 29.70 FEMA FLOOD ZONE COMMUNITY PANEL # 25001 CO579J 29.20' 17. DEED REFERENCE: BOOK 34481, PAGE 163 18. PLAN REFERENCE: PLAN BOOK 190, PAGE 63 27.03' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. 22. TOP OF COASTAL BANK, AS SHOWN ON THIS PLAN, WAS DELINEATED BASED ON THE STANDARDS UNDER MA DEP DWW POLICY 92-1 (ISSUED: MARCH 3, 1992). 23. LOCATION OF EXISTING WATER LINE, ELECTRIC LINE, TELEPHONE LINE, AND CABLE LINE SHOWN ON THIS PLAN IS APPROXIMATE ONLY AND SHALL BE FIELD VERIFIED AT THE START OF INSTALLATION. INSTALLER TO REPORT TO ENGINEER IF LOCATION IS DIFFERENT THAN SHOWN ON THIS PLAN. Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC Yarmo h Department O O . nmoo nuwT1 N \A, Date FM FM 0 REV. I DATE SN OF lN,gss�� ti JOHN L. CHURCHILL JR. m A NO-48066 0 o 3- EG E N D RECEIVED EXISTING CONTOUR FEB 0 7 2024 PROPOSED CONTOUR HEALTH DEPT EXISTING WATERLINE EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC LINE EXISTING UNDERGROUND TEL. & CABLE LINE TEST PIT LOCATION PROPOSED 1,500 GALLON SEPTIC TANK PROPOSED 1,000 GALLON PUMP CHAMBER PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED H-20 DISTRIBUTION BOX PROPOSED 500-GALLON H-20 LEACHING CHAMBER BY APP'D. I DESCRIPTION PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR ANDY BALER LOCATED AT 29 AUNT DORAH'S LANE YARMOUTH PORT, MA 02675 SCALE: 1 INCH = 20 FT. DATE: JANUARY 15, 2024 0 10 20 40 80 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 n­Qv AAI'D ne :.. ed Qv \AI-0 1 r,6e Led 0... 11 !` 1 In \I- �9CC