HomeMy WebLinkAboutEngineer Report - repairs 11/4/24 MICHELE CUDILO, P.E.
Consulting Structural Engineer
123 Cottonwood Lane,Centerville, Massachusetts 02632-1979• (508)737-8521 •mcudilo@ccmcast.net
November 4,2024
Ms.Johnson
West Yarmouth Series LLC
POB 342
Hyannis, MA 02601
RE: Egress Inspection: BEACH BERRY INN
157 BERRY AVE.,Yarmouth,MA
Dear Steve,
The following items were observed during Site Observation 01 on November 1, 2024,and require follow-up
construction,as discussed with you.
REAR STAIRS/DECKS
1. Replace rusted joist hangers and lag bolts:use Simpson LU26(min.)and 2-Ledgerlok per 16" bay.
The following criteria are required in your future maintenance. Any newly constructed rails shall meet the current
criteria:
1. Height of Rail at upper floors: 42"above decking;
2. Spacing between balusters: 4" clear max.;not ladder-type;
3. Max.triangular space between stair parts: 6"sphere.
4. All components shall be capable of withstanding a 200 lb. load in any direction.
5. Height of rail above the leading edge of stair tread: 42"
6. Stair treads to have 1" nosing over riser
Please call for final review of the above corrected conditions in the field for final observation.
Sincerely,
Michele Cudilo, P.E.