Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number
IL 1WPA Form 8A — Request for Certificate of Compliance SE-83-2244
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information Yarmouth Conservation
Commission
Important:
When filling out 1. This request is being made by:
MAC 2 2025
forms on the 114 Upper County LLC
computer, use Name
only the tab Post Office Box 1210 C E I V E D
key to move
your cursor Mailing Address
do not use the South Yarmouth MA 02664
return key. City/Town State Zip Code
* I -- —
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
i�'�I 114 Upper County LLC
Applicant
09/14/2020 SE-83-2244
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in 160 Wood Road South Yarmouth
an Order of Street Address _ City/Town
Conditions, the 60 21 _
property owner
must request a
Assessors Map/Plat Number Parcel/Lot Number
Certificate of 4. The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance
from the issuing
authority stating Property Owner of different/
that the work or Barnstable 32507 95
portion of the
work has been
County Book Page
satisfactorily
completed. Certificate(if registered land)
5. This request is for certification that (check one):
® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a doe..rev 5/29/14 Pape 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 8A — Request for Certificate of Compliance sE-83-2244
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see ttp://www.mass.govieeaiagenciesimassdepiabouticontactsffind-the-massdeu-regional-office-
?uryour-city-or-town html).
epalorm8a.doc..rev.5129114 Page 2 of 2
�� t.k iG
�F�' G DEMAREST LAND SURVEYING
338 Mayfair Road
South Dennis, MA 02660
Phone: 508-364-9049
‘.`� email: demarestlandsurveying(d,gmail.com
Q
IS, t. '
Date: 3/18/2025
To: Brittany DiRienzo
Conservation Administrator
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
Re: 160 Wood Road
South Yarmouth
Dear Brittany:
After performing a post construction site visit to 160 Wood Road, it is my determination that the
newly re-built deck, new retaining wall and stairs to the west of the dwelling and new retaining
wall to the east of the dwelling, complies with the site plan submitted to the Conservation
Commission, by Meyer& Sons, Inc., dated July 21, 2020.
Thank you for your consideration.
Sincerely,
o Z. Demarest Jr.
Professional Land Surveyor