Loading...
HomeMy WebLinkAboutCOC req 4.15.2025939 main street rte 6a yarmouth port mass 02675 tel. (508) 3624541 fax (508) 36M880 down cape engineering, inc civil engineers & land surveyors TIZNSIVIITTAL Apri115, 2025 FROM: Heather Cornell hcornell@downcape. com Yarmouth Conservation Method of Deli RE: 9 Flakeyard Lane, West Yarmouth Certificate of Compliance, SE83-1992 DCE#1M46 Betron Email; In off Attached please find documents to support a request for a Certificate of Compliance at 9 Flakeyard Lane, including: • Request for a Certificate of Compliance, WPA Form 8A • Down Cape Engineering, Inc. Statement • Existing Conditions Site Plan, dated April 10, 2025 • Site photos • Filing fee CC: File 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits 1 own cape engineering, inc civil engineers & land surveyors April 155 2025 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Ref: #9 Flakeyard Lane, West Yarmouth (SE83-1992) Dear Commission Members: tel. (508) 3624541 fax (508) 36M880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari, E.I.T., S.E. In September of 2014, the Commission issued an Order of Conditions for the above - referenced site, SE83-1992, for the raze and replace of an existing garage on a previously developed site. No work was ever done under that Order which subsequently expired. We respectfully request the issuance of a Certificate of Compliance for SE83-1992. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. I� Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP He Number: SE83-1992 Provided by DEP A. Project Information 1. This request is being made by: Clifford Betron Name 381 Tahmore Drive Mailing Address Fairfield CT 06825 City/Town State Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Clifford Betron Applicant 9/22/2014 SE83-1992 Dated DEP File Number 3. The project site is located at: 9 Flakeyard Lane West Yarmouth Street Address City/Town 20 16 Assessors Map/Plat Number Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Clifford &Patricia Betron Property Owner (if different) Barnstable County Certificate (if registered land) 5. This request is for certification that (check one): 28465 146 Page ❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ® the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformSa.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE83-1992 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (com, 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass,gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town. html) wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 ;; T ��1 � � - , 1 � ��; r. - �, �� ti 2 � r ' y �, f A's ,:� n . C — t � r tt I �( � z �, ;�� � I �J ! �,t f °; , ��',l / l4* �+art �c '�;�`; �' � � , � Y �� `.t � � �'� t� 1 i Yy, y1AN; � 1!�`� ' �if ;' , �. t�h � ';,i r � �