HomeMy WebLinkAboutas-built Plan 4.10.2025�DCE #>0-246
Scale: 1 "= 20'
1C r0 30 40 50 FEET
NOTES
1. DATUM IS NAVD88
2. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO
BE USED FOR LOT LINE STAKING OR ANY OTHER
PURPOSE.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING
DIGSAFE (811) AND VERIFYING THE LOCATION OF ALL
UNDERGROUND & OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF WORK.
4. EXISTING SEPTIC LOCATION PER TIE -CARD ON FILE
WITH TOWN.
J
DATE DANIEL A. OJALA, P.E., P.L.S.
LOCUS MAP
NOT TO SCALE
ASSESSORS MAP 20 PARCEL 16
DATUM: NAVD88
LOCUS IS WITHIN FEMA FLOOD ZONE VE
EL. 13 & AE EL. 12 AS SHOWN ON COMMUNITY PANEL
#25001C0339J DATED 7/16/2014
SITE LIES WITHIN "LIMIT OF MODERATE WAVE ACTION"
EXISTING CONDITIONS
SITE PLAN
OF
9 FLAKEYARD LANE
WEST YARMOUTH, MA
PREPARED FOR
CLIFFORD BETRON
DATE: APRIL 10, 2025
off 508-362-4541
fax 508-362-9880
downcape.com
I
down cape eagideefing, inc.
civil engineers
land surveyors
SURVEY: NHO
939 Main Street ( Rte 6A)
DRAFTED BY: DEG
YARMOUTHPORT MA 02675
CHECKED BY: -01,
10-246
BETRON 2024.DWG