Loading...
HomeMy WebLinkAboutFinal cost affidavit/breakdownTOWN OF YARMOUTH 1146 Route 28, South Yarmouth, MA 02664 508-398-2231 ext. 1261 Fax 508-398-0836 Office of the Building Commissioner FINAL COST AFFIDAVIT FOR WORK IN FEMA FLOOD ZONE To the Building Commissioner, In accordance with 780 CMR Section 109 of the Massachusetts State Building Code, the total estimated cost ofconsfuction, including all related costs* of the building at and constructed, reconstructed, altered, repaired, or extended under building permlt no.amounts to $eBo swear t the statements m herein are strictl N ticS gnature being referred to as the owner/agent identified below, do solemnlvy true, corect and made in good faith. *Related consffuction costs include all work done with or concurrently with the work contemplated by the buildingpermit including construction, reconstruction, repairs, demolitlon, ilvac *o.t, "t, ir-ishings and portableequipment are not part of the total construction cosb. Signanre of o 2't, z0g My Commission Expires @ Mary Etlen I RobertsNOTARY PUBLICCommonwealth ofMassachusettsMy Commisslon Exoiresn,|arch 27, 2O3i Notary Seal; I, Construction Supenrisor License #37 636 Contractor #L2OO4O Home Iaprovement 15 SPEAK WAY NORTH HARWICH, MASSACHUSETTS 02645 Phone: (so8) 432-5565 / Cell: 17741 836-6859 Email address: danaspeakma n@hotmail.com Phase II: Connie Wright, 23 Circuit Road, W. Yarmouth FINAL COST BREAKDOWN $14,000 $7,s00 Interior trim labor---- -------------$20,000 Kitchen Cabinetry--- -----------$15,000 Flooring: approx. 600+/- s.f. at $15/ft---------$4,500 Tile work----- -------$7,500 Glass shower door----------- -----$2,OOO Dumpsters & temporary outhouses------------$S,OOO Painting (interior only) Interior trim materials SUB-TOTAL: G.C.@l5o/o TOTAI: $181,630 $ 27,2so. $208,880. DAN A. SPEAI(MAN CONSTRUCTION GENERAL CONTRACTOR I