HomeMy WebLinkAboutFinal cost affidavit/breakdownTOWN OF YARMOUTH
1146 Route 28, South Yarmouth, MA 02664
508-398-2231 ext. 1261 Fax 508-398-0836
Office of the Building Commissioner
FINAL COST AFFIDAVIT FOR WORK IN FEMA FLOOD ZONE
To the Building Commissioner,
In accordance with 780 CMR Section 109 of the Massachusetts State Building Code, the total estimated cost ofconsfuction, including all related costs* of the building at
and constructed, reconstructed, altered, repaired, or extended under building permlt no.amounts to $eBo
swear t the statements m herein are strictl
N ticS gnature
being referred to as the owner/agent identified below, do solemnlvy true, corect and made in good faith.
*Related consffuction costs include all work done with or concurrently with the work contemplated by the buildingpermit including construction, reconstruction, repairs, demolitlon, ilvac *o.t, "t, ir-ishings and portableequipment are not part of the total construction cosb.
Signanre of o
2't, z0g
My Commission Expires
@
Mary Etlen I RobertsNOTARY PUBLICCommonwealth ofMassachusettsMy Commisslon Exoiresn,|arch 27, 2O3i
Notary Seal;
I,
Construction Supenrisor License #37 636
Contractor #L2OO4O
Home Iaprovement
15 SPEAK WAY
NORTH HARWICH, MASSACHUSETTS 02645
Phone: (so8) 432-5565 / Cell: 17741 836-6859
Email address: danaspeakma n@hotmail.com
Phase II: Connie Wright, 23 Circuit Road, W. Yarmouth
FINAL COST BREAKDOWN
$14,000
$7,s00
Interior trim labor---- -------------$20,000
Kitchen Cabinetry--- -----------$15,000
Flooring: approx. 600+/- s.f. at $15/ft---------$4,500
Tile work----- -------$7,500
Glass shower door----------- -----$2,OOO
Dumpsters & temporary outhouses------------$S,OOO
Painting (interior only)
Interior trim materials
SUB-TOTAL:
G.C.@l5o/o
TOTAI:
$181,630
$ 27,2so.
$208,880.
DAN A. SPEAI(MAN CONSTRUCTION
GENERAL CONTRACTOR
I