Loading...
HomeMy WebLinkAboutStructural Engineer letter 4/14/25 DWD ENGINEERING, INC. 5 MICHAEL ROAD EAST BRIDGEWATER, MA 02333 (508)378-9602 domdean@aol.com April 14, 2025 Mr. Mark Grylls-Building Commissioner Yarmouth Building Department 1146 Route 28 South Yarmouth, MA 02664 RE: Prefabricated Building Erection 212 Mid Tech Drive-Yarmouth, MA Dear Grylls, This letter is to confirm that I have been onsite for the prefabricated building erection. Based on my observations it is my professional opinion that the building erection has been completed in accordance with the plans prepared by Star Building Systems dated February 20, 2024, the International Building Code (IBC 2015) with Massachusetts State Building Code Amendments (9th Edition), and generally accepted construction practice. If you have any questions concerning this letter or if I can be of further assistance, please do not hesitate to contact me. di .Ji..A®4,4 Si P OF NMgs,4\ , /t' i ' "e ,ti, Ili: g' - o . r .'.nictiAiN n.:.►.,►P.E. ' i•er3IRUCTURAL 0 No.35062, cc.J . Cc: Kurt Raber-Catalyst Ago 9FGrs-> - ��``�A Waylon Lohr-Lohr Construction FF0. ssr-QNAL�N.14 I C :' .WL ) ' K 1 [ 1 APR 1 7 2025 BUILDING DEL ._.Ii _ 1, By