Loading...
HomeMy WebLinkAboutStructural Engineer 4/18/25 ik PHILBROOK ZpENGINEERING FIELD REPORT/WORKSHEET Project No: ??_5.o 107 BEACH STREET '50NIS MA8385-B 82438 Sheet No: L of MEMO FOR RECORD: 18 April 2025 Subject: Exterior 1 Story Exterior Stairway/Landing/Handrail for the South Yarmouth United Methodist Church Location: 318 Old Main Street South Yarmouth. MA Contact: Paul Sweester Project No: P25-08 Notes from Inspection &Design Findings: hq1435 1. The 2nd story stairway,landing and handrail system for this property was inspected on 8 APR 25 and found to be in satisfactory condition. The work was performed IAW Para. 1001.2.2 MA Amend.to the 2021 IBC. MA 10th ed. Loads meet Para. 1607.9.1 requirements of this Code: Live Load(Landing)= 100 lb/sq ft Live Load(Stair)=100 lb/sq ft -- Horizontal Load (Guardrail)=200 lb impact Horizontal Load(Guardrail)=50 lb/ft 2. This is an all-steel galvanized structure. It is self-braced and free-standing from the building. It is close-fit connected to prevent slip-thru. It is well made. 3. This is the maintenance and serviceabliity inspection and will require a re- inspection within the next 5 years(5 year period for A-3 Use Group). Annual inspections and routine maintenance remain an owner responsibility under Para. 1001.2.1 MA Amend. Respectfully submitted, ��``r Ss9c� >`�° T VARNUM GN`,. � n �G� �— ` o PHILBROOK .,. MECHANICAL °'!. T.VARNUM PHILBROOK,P. l ,No.30690,0 Q �. , -., ` . I4- rF __ -1.,.1.-getah-N a =?�a ,� ! =ate - L — �® TI -- y ilf P82-FRW-7