Loading...
HomeMy WebLinkAboutOOC recorded 5.5.2025Doc :1 s 522 * 463 05-05-2025 2 : O 1 BARNSTABLE LAND COURT REGISTRY e. City/Town CANTON f. State 5. Project Location a.Street Address 21 TELEVISION LANE b City/Town YARMOUTH d. Assessors Map::Plat# 14 f. Latitude 41.63475N 6. Property recorded at the Registry of Deed for: a. County b. Certificate c. Book BARNSTABLE 228738 7.Dates Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File #:083-2469 WPA Form 5 - Order of Conditions eDEP Transaction Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 #:1880735 L)�__] City/Town:YARMOUTH A. General Information 1. Conservation Commission YARMOUTH 2. Issuance a. t✓ OOC b. r Amended OOC 3. Applicant Details a. First Name ALFREDO G. b. Last Name LOPILATO c. Organization HOMEOWNER d. Mailing Address 4 ALBERT STREET e. Cityrrown CANTON f. State MA g. Zip Code 02021 4. Property Owner a. First Name ALFREDO G. AND JANEL M. b. Last Name LOPILATO c. Organization HOMEOWNERS d. Mailing Address 4 ALBERT STREET MA g. Zip Code 02021 c. Zip Code 02673 e. Parcei.Lot# 53 g. Longitude 70.23194W d. Page a. Date NOI Filed: 2-24.:2025 b. Date Public Hearing Closed: 3:20.'2025 c. Date Of Issuance: 4.7'2025 8.Final Approved Plans and Other Documents a. Plan Title: b. Plan Prepared by: c. Plan Signed/Stamped by: d. Revised Final Date: e. Scale: PROPOSED JUSTIN J. STRONG TREE 2r 11:2025 AS NOTED HOUSE SITE PLAN LAMOUREUX ENGINEERING B. Findings ].Findings pursuant to the Massachusetts Wetlands Protection Act Following the review of the the above -referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. r Public Water Supply b. r Land Containing Shellfish c.r-, Prevention of Pollution d. r Private Water Supply e. r Fisheries f. P- Protection of Wildlife Habitat g. r Ground Water Supply h. r Storm Damage Prevention i. r Flood Control 2. Commission hereby finds the project, as proposed, is: Page I of 9 * ELECTRONIC COPY