Loading...
HomeMy WebLinkAboutPlans 3.19.2024Taut Line Taut Line Slack Lin e Retrac table La dde r (l) Retractable Ladder ~ 0 0 0 DOCK LINE PLACEMENT #1 Tie-offs and Bumpers Flat Bottom Boat no scale Tie Line Tie Line Tide Sliders 4' (long) wrap ~around bumpe rs surrounding 10" pile/pier Retrac tab le Lad de r (l) ,TION c=tB.3 ~ 0 0 0 Cl) DOCK LINE PLACEMENT #2 Tide Sliders & Bumpers Flat Bottom Boat no scale -2x9 Retractable Ladder WET TECH LAND DESIGN, INC WETLAND PERMITTING -LAND PLANNING -LANDSCAPE DESIGN Scale: 1" = Date:Mar ch 19 P.O. Box 1580-Sagamore Beach, MA 02562 508 -642 -7701 on Ca e Cod 1 O' Drawn: WAYNE TAVARES L.A. Job No .21-8400 . Dock Re-development Plan for: DIG-IT CONSTRUCTION , LLC PO BOX 268 SOU TH DEN NI S. MA 02660 PHO N E: 508-4 32 -1 635 www.dig itc onstructionllc.com ENGINEER FOR WATER- DEPENDENT STRUCTURE (FLOAT/DOCK) ... ONLY DATE S / 11/ z.s-- KEITH E FER NANDE S, PE#"87 25 FOLL/NS POND (tidal) ····~---. ----------.. '\\., \,\ ', ', ' C i ' ;::; + ,.--., u 04-23-25 ' :' 0 //~ ! / r~ / / "-' ,. /R I : -...J i/~ //' Ji! I t r~ il ,-;::; ,I -:::<.I r~ Dock ~ 42', with side steps 8c la dders ta reach Baa t / Skiff Kayaks racks attached ,-------... , REVISED : 02-22-22 2 Buttercup Ln 2 Buttercup Ln .. Yarmo uth, MA 02673 Realty Trst Riverfront delineation & Mit iga tion 06-07-22 04-30-23 House Entr y/Egre ss Reconfigured ; approved b ZBA i Miti a tian chan e Reduce house size ReMa ve froM 35' Buffer 14 12 10 a 6 4 G O —2 I. 0+50 Taut Line 2" X 12" STAIR SADDLE RUNNER Slack Line —� V (long) wrap -around bumpers surrounding 10" pile/pier , Retractable Ladder ELEVATIONS AT LAND UNDER OCEAN Taut Line Slack Line Retractable Ladder 0" stay pile/pier X 4" PT POSTS 4" X 4" PT POSTS 42' FROM MHW X 4" W/2" ?: 6" "T" SUPPORT RAIL AIRWAY CONTINUES OFF DOCK TO BEACH 10" ARINF PIER 0 16' (up to 22' (driven, and on top); POINTED POLY "BIRD" CAP 0 NOTES: 1) ALL CONSTRUCTION CONFORM TO MASS BLDG CODE...... MOST RECENT EDITION 2) WETLAND DELINEATION (B.V.W.) BY Wet Tech Land Design, Inc 3) SURVEY BY RICK HOOD PLS (TOP COASTAL BANK DELINEATION) 4) ALIGNMENT OF DOCK SHALL BE PERFORMED BY SURVEY 5) ALL WORK COMPLETED BY HAND; PILES DRIVEN BY HYDRAULIC COMPRESSION; 6) PILES SHALL BE MARINE LUMBER WITH ACQ ONLY; NO CCA LUMBER TO BE USED 7) ALL HARDWARE SHALL BE GALVANIZED OR PLASTIC COATED 8) NO STRINGER JOIST TO BE LONGER THAN 10' 9) ALL (2" x6") HANDRAILS (if required) SHALL BE SPACED 10' APART; A 9" BALL CANNOT BE PASSED THROUGH THE RAIL: 10) ALL CONSTRUCTION TO BE APPROVED BY LOCAL BUILDING DEPT. 11) ANY LADDER TO BE ANODIZED ALUMINUM OR PVC; RETRACTABLE, IF POSSIBLE Will nJii`11R2.1D7i11a7:VL1TClk76T.M111 0*3 1120RVA zi 1110 = W-1 11 111AM I.187-11 at Station 0+40, Land Under Ocean was 17" below MLW; at Station 0+42, WO was 29" below MLW; apparent Bass Hole PIER DOCK CROSS SECTION (LENGTHWISE AND TRANSVERSE) 10" DIAM piers located at 10' OC; installed by hydraulic compression TOP OF EXISTING BULKHEAD STARTS=7.C2 NAV 88; ENDS @ 6.02 THRUFLOWTM VDOCK COMPOSITE DECKING (24" X 4' staggered modular) 5/8" GALV BOLT -WASHERS -DOUBLE NUT (@8") FROM PIER---1 DOUBLER @ 3" X12" X 10' PT (MARINE GRADE) SUPPORTED WITH (4) 2" X 12" X 1V JOISTS LAST STEP =[ 1P34 Extreme DOCK LINE PLACEMENT #1 rC(rFEFAI! Tie-offs and BumpersFlat Bottom Boat no scale DIG -IT CONSTRUCTION, LLC PO BOX 268 SOUTH DENNIS. MA 02660 PHONE 508-432-1635w .digitconstructionllc.com ENGINEER FOR WATER- DEPENDENTSTRUCTURE (FLOAT/DOCK)....ONLLY DATE / KEITH E FERNANDES, PE 48725 POND ELEVATIONS AT LAND UNDER OCEAN Extreme Max Sliding Dock Lading 2" X 12" CROSSTIE AND RUNNER?RU—_ x," —, WHEN GREATER THAN X SEPARATION FROM MARSH Ladders STRAIGHT LADDERS LIFT .AODERS FLOAT IC DOCK LIFT SwINeT G LADDERS FINGER PIER LIFT LADDF 41 LADDERS VARIOUS DOCK LADDERS CENTER TO CENTER OF PILES TRANVERSE DOCK SECTION @ PILE N.T.S Tie L Tide Slid 4' (long) wrap -around bumpers surrounding 10" pile/pier 2" X 12" CROSSTIE AND RUNNER TRUSS (X 2) WHEN LESS THAN 3' SEPARATION FROM MARSH Retracla 24 22 20 18 16 14 12 10 8 6 4 2 0 —2 —4 —6 AWN � N c C O.o — �N O o� i00 N 2� N 0 0Y -0 CD �—� O N �U Q w - _0 Z F(''1 4-+ �1 O E O > U C7 • J O Qz N + 0 C) O ryM� W W n` _ Gt2 N Q Cz'� CD j `./ O W A Q00 � I Tie Line ~� a ('0 (V � Z ^U O � Q z L LJ `./ Retractable Ladder 7 1 < 6 :2 (3 U) W z � 'D CLM r.-I N _ U 4D a v Y z m cD c S Q CL. o o A z N I— I I CD 00 DOCK LINE PLACEMENT #2 1 — a' Tide Sliders & Bumpers "�' m o0 Flat Bottom stcale Boat z o o U CD SHEET 2 OF 2 Original May 19, 2024 w II a Revised April 23, 2025 P4 Dock @ 42', with side steps E"1 ca & ladders to reach Boat / Skiff w Kayaks racks attache E C Wayne Tavares PWS r co CS #048-451