Loading...
HomeMy WebLinkAboutMitigation plans 5.20.2025Substitutions allowed with prior approval of Conservation Administrator. Locations may be field adjusted. Temporary irrigation to be used for the first two growing seasons - i.e., drip hose. Mitigation/restoration plantings are to be monitored for three years for invasives and plant success. Invasive plants are to be removed by hand in the spring and fall. Failed plantings are to be be replaced to 90% survival. Annual reports are to be submitted to the Conservation Commission by October 15. Proposed Mitigation Plan prepared for Christos Kounadis 50 Heritage Drive West Yarmouth, MA Date: May 20, 2025 Scale: 1"=20' Plan section from Existing Conditions Site Plan #16 Woodbine Drive, West Dennis, MA prepared for John Friel by Down Cape Engineering, Inc. March 6, 2025 Hamlyn Consulting 690 Thousand Oaks Drive Brewster, MA 02631 774-323-0603 (12) St. John's wort (Hypericum densiflorum), 1 gal. 3' on center (12) Inkberry (Ilex glabra), 3 gal. 4' on center (11) Winterberry (Ilex verticillata), 2-3 gal., 5' on center (9) Highbush blueberry (Vaccinium corybosum), 2 gal. 6' on center (11) Carolina rose (rosa carolina), 1 gal. 4' on center (12) Sweet pepperbush (Clethra alnifolia), 1 gal. 4' on center (7) Swamp azalea (Rhododendron viscosum), 2-3 gal. 5' on center (3) Tupelo (Nyssa sylvatica), 4-6' B&B, 15' on center (10) American cranberry viburnum (Viburnum trilobum), 2 gal. 6' on center (11) Arrowwood (Vuburnum dentatum), 2 gal. 6' on center (19) Sheep laurel (Kalmia angustafolia), 1 gal. 3' on center (2) Witch hazel (Hamamelis virginiana), 3 gal. 5' on center (6) Silky dogwood (Cornus amomum), 2-3 gal. 5' on center (10) Red chokeberry (Aronia arbutifolia), 1-2 gal. 5' on center (6) Maple-leaved viburnum (Viburnum acerifolium), 2 gal. 5' on center (3) Bayberry (Morella pensylvanica), 2 gal. 4' on center Exist. cedars Exist cedars Mitigation Calculations Net hardscape in the 35-50-foot buffer zone: -128 sf Mitigation credit: 128 X 3 = 384 sf Net hardscape in the 50-100-foot buffer zone: 2307 sf Mitigation requirement: 2307 X 2 = 4614 sf 4614 - 384 = 4230 sf provided Net hardscape in outer riparian zone: 1173 sf Mitigation requirement: 1173 X 2 = 2346sf 4230 sf provided Notes Plant species, size and spacing