Loading...
HomeMy WebLinkAboutCOC request 6.12.2025 Shorefront Consulting Professional Services on Land or At Sea 290 Center St., Dennis Port, MA 02639 www.shorefrontconsulting.com 508-280-8046 shorefrontconsulting@gmail.com Yarmouth Conservation Commission June 12, 2025 Attn: Brittany DiRienzo 1146 Route 28 South Yarmouth, MA 02664-4492 By hand delivery and email Re: Request for Certificate of Compliance and Statement of Compliance Proposed Elevated Walkway, Landing, and Invasive Species Removal in Dinah’s Pond Jeffrey and Beth Fanara 116 Mayflower Terrace South Yarmouth, MA 02664 Map 119, Parcel 58 On behalf of my clients, Jeffrey and Beth Fanara, please accept this request for a Certificate of Compliance for the above referenced project. A site inspection was performed by Shorefront Consulting on May 28, 2025. The proposed work is complete. An As-built plan and photographs are included in this request. The project was monitored and inspected by Shorefront Consulting during the construction process. The invasive removal effort is ongoing. The plantings have been installed, augmented as needed, and are in stable condition. The only deviation from the design plan is that the outer lower landing extends about two feet further seaward than expected. While the deck and landing heights conform to the plan, it is likely this resulted from the actual rise and run stair layout where the run was longer in the field than shown on the design plan. This deviation has no effect on the salt marsh because it extends beyond the marsh. The area does look like the marsh has extended seaward a little all by itself, which is a good thing. There are no other deviations from the plan observed during the time of inspection. Therefore, the project has been completed in accordance with the Order of Conditions, and all Special Conditions contained in SE-83-2306 issued on 1/27/2022. Attached please find Yarmouth form WPA-8A Request for Certificate of Compliance, photos of the completed project, an as-built plan dated 5/28/25, and a check for $75 made payable to the Town of Yarmouth. This letter is certified by the surveyor with their stamp. Please include this request in your next public hearing. The original Certificate of Compliance should be mailed to Shorefront Consulting for recording. If there are any questions or concerns regarding this request, please contact me as soon as possible. Sincerely, Mark Burgess Shorefront Consulting Enclosures: As Stated cc: Jeffrey and Beth Fanara (Applicants) wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE83-2306 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: Jeffrey B. and Beth A. Fanara Name P.O. Box 775 Mailing Address Dennis City/Town MA State 02638 Zip Code 508-247-7838 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Jeffrey B. and Beth A. Fanara Applicant 1/27/2022 Dated SE83-2306 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 116 Mayflower Terrace Street Address South Yarmouth City/Town Map 119 Assessors Map/Plat Number Parcel 58 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Jeffrey B. and Beth A. Fanara Property Owner (if different) Barnstable County 34895 Book 109 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE83-2306 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). Jefferey and Beth Fanara – 116 Mayflower Terrace, South Yarmouth Photo showing back yard and elevated walkway and deck Photos showing beginning of walkway and new landing Photo showing walkway and lower deck level Jefferey and Beth Fanara – 116 Mayflower Terrace, South Yarmouth Photo Showing lower landing and steps to beachPhoto showing first set of steps to lower landing Photos showing mitigation plantings PROPOSED PLANTING LIST: PLANT LIST (200 +sq.ft.)HEIGHT WIDTH SPACING POT SIZE QUANTITY (+)COVERAGE (SQ.FT.) SWEET PEPERBUSH 6’6’4"0.C.1G 4 64 BEARBERRY 12"4 1"0.C.4”POT 9 9 LAUREL 3 3 4-5"0.C.3G 4 64 LOW BUSH BLUEBERRY 2-3 2 3 0.C.1G 7 63 TOTAL =200 NOTE:QUANTITIES SHOWN HERE ARE APPROXIMATE AND CAN BE ADJUSTED AS LONG AS THE TOTAL SQUARE-FOOT COVERAGE EQUALS 200 SQUARE FEET.OTHER PLANT SPECIES CAN BE SUBSTITUTED WITH CONSERVATION APPROVAL. ~Om [HTHfr "Oposey Ql 1]°eo o fT o—JX os TH AT=,h D (5) 51°40""Oposeq wTN86°51°40"w 9rateq.gn i 0 BEA CH _ — g —;_— AS—BUILT PLAN PROPOSED ;,—2 ————AS-BULT SCALE:1"=10’ PLAN SHOWING AS—BUILT CONDITIONS SHOREFRONT CONSULTING SCALE 1”=10’FOR 290 CENTER STREET SHEET 1 OF 1 JEFFREY AND BETH FANARA DENNISPORT,MA 02639 MARCH 28,2025 116 MAYFLOWER TERRACE 508-280-8046 YARMOUTH,MASS.SHOREFRONTCONSULTING@GMAIL.COM