Loading...
HomeMy WebLinkAboutPacketLanding_ConCommHearing_070325 (PDF)Conservation Commission Hearing July 3, 2025 Packet Landing Marina Resiliency Project Functions Rescue Commercial Fishing Emergency Response Recreational Boating Packet Landing Marina Challenges Flooding from periodic storm and extreme water level events •Restrict Access •Wear and tear on infrastructure and equipment •Decrease economic benefitsPacket Landing Marina Bass River 2024 Alternative Assessment Redesign Packet Landing to be more resilient to flooding. Alternative 2 Preferred Elevate parking lot with fill Removal of timber bulkhead and new installation of continuous sheet pile. Reconstruct wharf, add elevated boardwalk and install new gangway for alternate access to floats. Repoint stone revetment and reconfigure stormwater system PARKING AREA EXISTING PROPOSED BULKHEAD EXISTING PROPOSED WHARF EXISTING PROPOSED REVETMENT EXISTING PROPOSED DOCK ACCESS EXISTING PROPOSED STORMWATER EXISTING PROPOSED Coverage Table and Impacts to Resources TOTAL 1,465 SF* *Not including Aluminum Gangway MITIGATIONReimbursement_Packages Requesting a Variance A variance from the Town of Yarmouth Wetland Protection Regulations, Part 6.02(1), 6.02(3)(a), and 6.02(3)(b), is requested to allow for reduced mitigation planting. •Due to the existing features of the site, there is no 35-foot undisturbed buffer zone landward of the wetland resource areas. •The current and intended uses for this site do not allow for this undisturbed buffer zone. •Due to space restrictions on the project parcel, 2:1 and 3:1 mitigation ratios cannot be met. •Approximately 1,352 square feet of mitigation planting is proposed for this project, a 0.92:1 ratio Thank you Dave Condon Department of Natural Resources Dcondon@yarmouth.ma.us Brittany Hoffnagle Woods Hole Group bhoffnagle@woodsholegroup.com Nicholas Bateman Tighe & Bond nbateman@tighebond.com