HomeMy WebLinkAboutPacketLanding_ConCommHearing_070325 (PDF)Conservation Commission Hearing
July 3, 2025
Packet Landing Marina
Resiliency Project
Functions
Rescue
Commercial
Fishing
Emergency
Response
Recreational
Boating
Packet Landing Marina
Challenges
Flooding from periodic
storm and extreme water
level events
•Restrict Access
•Wear and tear on
infrastructure and
equipment
•Decrease economic
benefitsPacket Landing Marina
Bass River
2024
Alternative
Assessment
Redesign Packet Landing to
be more resilient to flooding.
Alternative 2
Preferred
Elevate parking lot with fill
Removal of timber bulkhead
and new installation of
continuous sheet pile.
Reconstruct wharf, add
elevated boardwalk and
install new gangway for
alternate access to floats.
Repoint stone revetment and
reconfigure stormwater
system
PARKING AREA
EXISTING
PROPOSED
BULKHEAD
EXISTING
PROPOSED
WHARF
EXISTING PROPOSED
REVETMENT
EXISTING PROPOSED
DOCK ACCESS
EXISTING
PROPOSED
STORMWATER
EXISTING PROPOSED
Coverage Table and Impacts to Resources
TOTAL 1,465 SF*
*Not including
Aluminum
Gangway
MITIGATIONReimbursement_Packages
Requesting a Variance
A variance from the Town of Yarmouth Wetland Protection
Regulations, Part 6.02(1), 6.02(3)(a), and 6.02(3)(b), is requested to
allow for reduced mitigation planting.
•Due to the existing features of the site, there is no 35-foot
undisturbed buffer zone landward of the wetland resource areas.
•The current and intended uses for this site do not allow for this
undisturbed buffer zone.
•Due to space restrictions on the project parcel, 2:1 and 3:1
mitigation ratios cannot be met.
•Approximately 1,352 square feet of mitigation planting is
proposed for this project, a 0.92:1 ratio
Thank you
Dave Condon
Department of Natural Resources
Dcondon@yarmouth.ma.us
Brittany Hoffnagle
Woods Hole Group
bhoffnagle@woodsholegroup.com
Nicholas Bateman
Tighe & Bond
nbateman@tighebond.com