HomeMy WebLinkAboutSOC 3.16.20004
DEP
: i ne 0 fis DeaIffient d Preftladw DEP File Number
Bureau of Resource Protecdon - Wedands MODIFIED - II
WPA Form 5 = Order of Conditions for OEPuse only
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40
Applicant Information
From:
YARMOUTH
crosv Lion Commission
For:
SE 83-1352
ftleaFaeNumtr
To:
Siddharth Siddharth
AppliarNN"
283 Weymouth Street
WffingMmss
Holbrook,
cdy/rown
MA 02343
state Irp Code
The project site is located at:
South Yarmouth
C41Town
101 J2
Assessors A601at / P&MA01 J
and the property is recorded at the Registry of Deeds for.
Barnstable 10204 0080
County Book Page
aV= (it m9 steW land)
U Findings
Findings pursuant to the Massachusetts Wetlands
Protection Act.
Following the review of the above -referenced Notice of Intent
and based on the information provided in this application and
presented at the public hearing, this commission finds that the
area in which work is proposed is significant to the following
interests of the Wetlands Protection Act (check all that apply):
= Public Water Supply
• Private Water Supply
Groundwater Supply
X Rood Control
= Land Containing Shellfish
= Fisheries
B Storm Damage Prevention
XPrevention of Pollution
XProtection of Wildlife Habitat
The Notice of Intent for this project was filed on:
2/8/96
Do
The public hearing was closed on:
3/16/00
Date
Title and Date of final Plans and Other Documents:
Plan of land, Curve Hill Rd.,
So.Yarmouth - Lot J2 - prepared
for Siddharth Siddharth by
Yunits Engineering Co.,
Holbrook, MA - REV. 2/22/00
Furthermore, this Commission hereby finds that the project, as
proposed, is:
(check one of the following boxes)
Approved subject to:
)'the following conditions which are necessary, in accordance
with the performance standards set forth in the wetlands
regulations, to protect those interests checked above. This
Commission orders that all the work shall be performed in
accordance with the Notice of Intent referenced above, the
following General Conditions, and any other special
conditions attached to this Order. To the extent that the
following conditions modify or differ from the plans,
specifications, or other proposals submitted with the Notice
of Intent, these conditions shall control.
Rev. 10/98
Page 1 of 5
Massachusetle Department of Enlvironmenta/ Proiectfon Town of Yarmouth
Bureau of Resource Protection- Wetlands MODIFIED - II Wetland By -Law
WPA Form 5 - Order of Conditions Chapter 143
Massachusetts Wetlands Protection Act M. G. L. G. 131, §40
1;� Findings (coot.)
debris, including but not limited to lumber, bricks, plaster,
Denied because: wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators,
motor vehicles, or parts of any of the foregoing.
the proposed work cannot be conditioned to meet the
Performance standards set forth in the wetlands regulations
to protect those interests checked above. Therefore, work
on this project may not go forward unless and until a new
Notice of Intent is submitted which provides measures
which are adequate to protect these interests, and a final
Order of Conditions is issued.
ED the information submitted by the applicant is not sufficient
to describe the site, the work, or the effect of the work on
the interests identified in the Wetlands Protection Act.
Therefore, work on this project may not go forward unless
and until a revised Notice of Intent is submitted which
provides sufficient information and includes measures
which are adequate to protect the Act's interests, and a final
Order of Conditions is issued. A description of the specific
information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(b)(c).
General Conditions
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any
exclusive privileges; it does not authorize any injury to
private property or invasion of private rights.
3. This Order does not relieve the permittee or any other
person of the necessity of complying with all other
applicable federal, state, or local statutes, ordinances,
bylaws, or regulations.
4. The work authorized hereunder shall be completed within
three years from the date of this Order unless either of the
following apply:
(a) the work is a maintenance dredging project as provided
for in the Act; or
(b) the time for completion has been extended to a
specified date more than three years, but less than five
years, from the date of issuance. If this Order is intended
to be valid for more than three years, the extention date
and the special circumstances warranting the extended
time period are set forth as a special condition in this
Order.
5. This Order may be extended by the issuing authority for
one or more periods of up to three years each upon
application to the issuing authority at least 30 days prior to
the expiration date of the Order.
6. Any fill used in connection with this project shall be clean
fill. Any fill shall contain no trash, refuse, rubbish, or
7. This Order does not become final until all administrative
appeal periods from this Order have elapsed, or if such an
appeal has been taken, until all proceedings before the
Department have been completed.
8. No work shall be undertaken until the Order has become
final and then has been recorded in the Registry of Deeds or
the Land Court for the district in which the land is located,
within the chain of title of the affected property. In the case
of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the
land upon which the proposed work is to be done. In the
case of registered land, the Final Order shall also be noted
on the Land Court Certificate of Title of the owner of the
land upon which the proposed work is done. The recording
information shall be submitted to this Conservation
Commission on the form at the end of this Order, which
form must be stamped by the Registry of Deeds, prior to the
commencement of the work.
9. A sign shall be displayed at the site not less than two square
feet or more than three square feet in size bearing the
words,
"Massachusetts Department of Environmental Protection"
[or, "MA DEP"] "File Number
SE 83-1352 ,.
Project File Number
10.Where the Department of Environmental Protection is
requested to issue a Superseding Order, the Conservation
Commission shall be a party to all agency proceedings and
hearings before the Department.
11. Upon completion of the work described herein, the applicant
shall submit a Request for Certificate of Compliance (WPA
Form 8A) to the Conservation Commission.
12.The work shall conform to the following attached plans and
special conditions:
Final Approved Plans (attach additional plan references as
needed):
Plan of land -Curve Hill Road
Title
REV. 2/22/00
Dated
Terrence J. Chase, P.E.
SignedandSlampedby Rbt, Backman, PLS
Con Com
On file Witt
If, -.t-cachuseft Depjrftent of Enuironmentai Protect%n Town of Yarmouth
Bureau of Resource Protection - Wetlands MODIFIED - II Wetland By -Law
WPA Form 5 - Order of Conditions Chapter 143
Massachusetts Wetlands Protection Act M.G. L. c. 131, §40
U Findings (coot.)
13. Any changes to the plans identified in Condition # 12 above
shall require the applicant to inquire of the Conservation
Commission in writing whether the change is significant
enough to require the filing of a new Notice of Intent.
14. The Agent or members of the Conservation Commission
and Department of Environmental Protection shall have the
right to enter and inspect the area subject to this Order at
reasonable hours to evaluate compliance with the condi-
tions stated in this Order, and may require the submittal of
any data deemed necessary by the Conservation Commis-
sion or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in
interest or successor in control of the property subject to
this Order and to any contractor or other person perform-
ing work conditioned by this Order.
16. Prior to the start of work, and if the project involves work
adjacent to a Bordering Vegetated Wetland, the boundary of
the wetland in the vicinity of the proposed work area shall
be marked by wooden stakes or flagging. Once in place,
the wetland boundary markers shall serve as the limit of
work (unless another limit of work line has been noted in
the plans of record) and be maintained until a Certificate of
Compliance has been issued by the Conservation Commis-
sion.
17. All sedimentation barriers shall be maintained in good
repair until all disturbed areas have been fully stabilized
with vegetation or other means. At no time shall sediments
be deposited in a wetland or water body. During construc-
tion, the applicant or his/her designee shall inspect the
erosion controls on a daily basis and shall remove
accumulated sediments as needed. The applicant shall
immediately control any erosion problems that occur at the
site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional
erosion and/or damage prevention controls it may deem
necessary.
Special Conditions (Use additional paper if necessary)
SEE ATTACHED SHEETS -
PAGES 3-A & 3-B
Findings as to municipal law, bylaw, or ordinance
Furthermore, the
YARMOUTH
Conservation Commission
hereby finds (check one that applies):
that the proposed work cannot be conditioned to meet the
standards set forth in a municipal law, ordinance, or bylaw,
specifically
Name and citation of municipal law, bylaw, or ordinance
Therefore, work on this project may not go forward unless
and until a revised Notice of Intent is submitted which
provides measures which are adequate to meet these
standards, and a final Order of Conditions is issued.
that the following additional conditions are necessary to
comply with a municipal law, bylaw, or ordinance, specifi-
cally
Name and citation ot municipal law, bylaw, or ordinance.
The Commission orders that all the work shall be performed
in accordance with the said additional conditions and with
the Notice of Intent referenced above. To the extent that the
following conditions modify or differ from the plans,
specifications, or other proposals submitted with the Notice
of Intent, the conditions shall control.
Additional conditions relating to municipal law, bylaw, or
ordinance:
SPECIAL CONDITIONS - PAGE 3-A
SIDDHARTH SIDDHARTH
SE 83-1352
The applicant shall be held responsible to advise the contractor of all these Orders of
Conditions.
2. The Conservation Officer shall be notified at least 48 hours prior to the commencement of
the proposed work. Telephone number is 398-2231 ext. 283.
3. These Orders of Conditions shall apply to any successor in interest or successor in
control.
4. Any fill required, (See General Order #6 in Order of Conditions) shall be of clean sand and
contain no material over 12 inches in diameter.
5. The existing silt fence and haybales shall remain in place. No work whatsoever shall occur
on the wetland side of this line.
6. Any area proposed for removal of vegetation for a period of more than seven days, shall
be mulched or otherwise treated to prevent erosion.
7. The deck shall not be closed in without a filing of either a Notice of Intent or a Request
for Determination of Applicability.
8. The back yard shall be planted with indigenous ground covers shrubs, trees etc. Lawn will
not be allowed.
9. The general contractor shall arrange an on site meeting with the Conservation
Administrator prior to the start of any work.
10. The applicant shall be responsible for having a copy of the Orders of Conditions on the job
site at all times. Failure to do so could possibly result in a revocation of the Order, a fine
or both.
11. The Conservation Commission, its agents or assign, shall have the express right of entry
upon the property for the purposes of establishing compliance to the conditions stated
herein.
CONTINUED.........
SPECIAL CONDITIONS CONTINUED - PAGE 3-B
SIDDHARTH SIDDHARTH
SE SE 83-1352
12. Upon completion of the project a Certificate of Compliance shall be requested. This
Order shall be considered incomplete until the Certificate of Compliance is recorded.
13. Any changes whatsoever form the plan dated 2/22/00 shall be approved by the
Conservation Commission prior to implementation.
Ifo -q achnsetts Department of "--drenmentai Prot on Town of Yarmouth
Bureau of Resource Protection - Wetlands MODIFIED - II wetland By -Law
WPA Form 5 - Order of Conditions Chapter143
DEP
Massachusetts Wetlands Protection Act M.G. L. c. 131, §40
Findings (coot.)
This Order is valid for three years, unless otherwise specified
as a special condition pursuant to General Conditions #4,
from the date of issuance.
March 22, 2000
Date
This Order must be signed by a majority of the conservation
commission. The Order must be mailed by certified mail
(return receipt requested) or hand delivered to the applicant.
A copy also must be mailed or hand delivered at the same
time to the appropriate regional office of the Department of
Environmental Protection.
Appeals
The applicant, the owner, any person aggrieved by this Order,
any owner of land abutting the land subject to this Order, or
any ten residents of the city or town in which such land is
located, are hereby notified of their right to request the
appropriate Department of Environmental Protection Regional
Office to issue a Superseding Order of Conditions. The request
must be made by certified mail or hand delivery to the
Department, with the appropriate filing fee and a completed
Appendix E: Request for Departmental Action Fee Transmittal
Form, as provided in 310 CMR 10.03(7) within ten business
days from the date of issuance of this Order. A copy of the
request shall at the same time be sent by certified mail or hand
delivery to the conservation commission and to the applicant,
if he/she is not the appellant.
On this 16 In
day of
Month
YOU
before me personally appeared
"k --,/� 1 �- � K"
if�tr'f tss1 q-s1
to me known to be the person described in and who executed
the foregoing instrument and acknowledged that he/she
executed the same as his/her free act and deed. _
No" Public I`-.
'-1-v AA- A �? .9—d.2
* commission evims
This Order is issued to the applicant as follows:
by hand delivery on
Date
MX by certified mail, return receipt requested, on
March 22, 2000
Date
The request shall state clearly and concisely the objections to
the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the
Massachusetts Wetlands Protection Act (M.G.L. c.131, §40
and is inconsistent with the wetlands regulations (310 CMR
10.00). To the extent that the Order is based on a municipal
bylaw, and not on the Massachusetts Wetlands Protection Act
or regulations, the Department of Environmental Protection has
no appellate jurisdiction.
Massachiusetle Deparbuent of Environmental Proteetion Town of Yarmouth
Bureau of Resource Protection - Wetlands MOD IF•I ED - II Wetland By -Law
WPA Form 5 - Order of Conditions Chapter 143
Massachusetts Wetlands Protection Act M.G. L. c. 131, §40
W Recording Information
This Order of Conditions must be recorded in the Registry of
Deeds or the Land Court for the district in which the land is
located, within the chain of title of the affected property. In the
case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the
land subject to the Order. In the case of registered land, this
Order shall also be noted on the land Court Certificate of idle
of the owner of the land subject to the Order of Conditions. The
recording information shall be submitted to the
YARMOUTH
Conservation Commission
on the form below, which must be stamped by the Registry of
Deeds.
Detach on dotted line and submit to the Conservation Commission. _ _ _ _ ----------
TO: YARMOUTH
Conservation Commission
MODIFIED — II
Please be advised that the Order of Conditions or the project
at
_Lot J2, Curve Hill Road, So. Yarmouth
ftiectLocanon D9ReNumber SE 8 3 —13 5 2
has been recorded at the Registry of Deeds of
BARNSTABLE
county
and has been noted in the chain of tide of the affected property
in
Book
PW
in accordance with the Order of Conditions issued on
3-22-00
Date
If recorded land, the instrument number which identifies this
transaction is
IMUMentMober
If registered land, the document number which identifies this
transaction is
Document Number
Signature of Applicant
•
COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
SOUTHEAST REGIONAL OFFICE
ARGEO PAUL CELLUCCI
Governor f! �= f`` r
Michael B. Stusse
25 Mid -Tech Drive, Suite C
W. Yarmouth, Massachusetts 02673
Dear Mr. Stusse:
April 9, 1998
TRUDY COXE
Secretary
DAVID B. STRUHS
Commissioner
RE: YARMOUTH -- Wetlands
File No. SE 83-1352
Superseding "Modified"
Order of Conditions
Following an in depth review of the above referenced file
and in accordance with Massachusetts General Laws, Chapter 131,
Section 40, the Department of Environmental Protection has issued
the enclosed Superseding Order of Conditions (SOC). This Order
approves the proposed project subject to certain conditions.
The Department has determined that the project site abuts a
bordering vegetated wetland (BVW), as defined in 310 CMR 10.55(2).
The proposed project consists of constructing a retaining
wall between a single-family dwelling and a BVW to prevent the
slope from constantly eroding, resulting in siltation of the BVW
and destabilization of the building foundation.
The enclosed SOC requires that the erosion control barrier
installed between the wetland resource area and the work area, be
maintained until the construction of the retaining wall is
completed. The SOC directs that all disturbed areas be stabilized
prior to removing the erosion control barrier.
The SOC contains additional requirements to protect the -
interests of the Act. It is the opinion of the Department that,
as conditioned herein, the proposed project adequately protects
the above -noted interests of the Act.
In the opinion of the Department the reasons given here are
sufficient to justify the enclosed SOC. However, the Department
reserves the right to raise additional issues and present further
evidence as may be appropriate should there be further proceedings
in this matter.
20 Riverside Drive • Lakeville, Massachusetts 02347 • FAX (508) 947-6557 • Telephone (508) 946-2700
0 Printed on Recycled Paper
-2-
If you have any questions regarding this SOC, please contact
Daniel F. Gilmore at (508) 946-2808.
Very truly yours,
-'Tena Y/Davies
Regiodal Watershed Coordinator
Bureau of Resource Protection
D/DFG/dg /bh
Enclosure
CC: Yarmouth Conservation Commission
Siddharth Siddharth
283 Weymouth Street
Holbrook, MA 02343
Certified Mail # Z 333 585 685
RETURN RECEIPT REQUESTED
310 CMR 10.99
Form 5 DEP File No SE 83-1352
(To be provided by DEP)
City/Town YARMOUTH
Applicant Siddharth Siddharth
Superseding "Modified" Order of Conditions
Massachusetts Wetlands Protection Act
G.L. c.131, 540
From Department of Environmental Protection
To Siddharth Siddharth (Name of Applicant)
Address 283 Weymouth Street, Hingham, MA 02343 (applicant)
To Same (Name of Property Owner)
Address Same (owner)
This Order is issued and delivered as follows:
❑ by hand delivery to applicant or representative on (date)
® by certified mail, return receipt requested on A=J 1 9, 1998 (date)
# Z 333 585 685
This project is located at Lot 2 Curve Hill Road
The property is recorded at the Registry of Deeds, Barnstable County
Book 10849
Page 306
Certificate (if registered)
The Notice of Intent for this project was filed on 2/8/96 (date)
The public hearing was closed on 2/5/98 (date)
Findings
The Department of Environmental Protection has reviewed the above -referenced
Notice of Intent and plans and has held a public hearing on the project. Based on
the information available to the Department of Environmental Protection at
this time, the Department of Environmental Protection has determined that the
area on which the proposed work is to be done is significant to the following
interests in accordance with the Presumptions of Significance set forth in the
regulations for each Area Subject to Protection Under the Act (check as
appropriate):
❑ Public water supply ® Flood control ❑ Land containing shellfish
❑ Private water supply ® Storm damage prevention ❑ Fisheries
® Ground water supply ® Prevention of pollution ® Protection of wildlife
habitat
Total Filing Fee Submitted $250 State Share $112.50
City/Town Share $137.50 04 fee in excess of $25)
Total Refund Due $ 0 City/Town Portion $ 0 State Portion $ 0
N total) (M total)
Effective 11/20/92 5-1
Therefore, the Department of Environmental Protection hereby finds that the
following conditions are necessary, in accordance with the Performance Standards
set forth in the regulations, to protect those interests checked above. The
Department of Environmental Protection orders that all work shall be performed
in accordance with said conditions and with the Notice of Intent referenced
above. To the extent that the following conditions modify or differ from the
plans, specifications or other proposals submitted with the Notice of Intent, the
conditions shall control.
General Conditions
1. Failure to comply with all conditions stated herein, and with all related
statutes and other regulatory measures, shall be deemed cause to revoke or
modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it
does not authorize any injury to private property or invasion of private
rights.
3. This Order does not relieve the permittee or any other person of the
necessity of complying with all other applicable federal, state or local
statutes, ordinances, by-laws or regulations.
4. The work authorized hereunder shall be completed within three years from the
date of this Order unless either of the following apply:
(a) the work is a maintenance dredging project as provided for in the Act;
or
(b) the time for completion has been extended to a specified date more than
three years, but less than five years, from the date of issuance and
both that date and the special circumstances warranting the extended
time period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods
of up to three years each upon application to the issuing authority at least
30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill,
containing no trash, refuse, rubbish or debris, including but not limited to
lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,
refrigerators, motor vehicles or parts of any of the foregoing.
7. No work shall be undertaken until all administrative appeal periods from
this Order have elapsed or, if such an appeal has been filed, until all
proceedings before the Department have been completed.
8. No work shall be undertaken until the Final Order has been recorded in
the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In
the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon
which the proposed work is to be done. In the case of registered land,
the Final Order shall also be noted on the Land Court Certificate of
Title of the owner of the land upon which the proposed work is to be
done. The recording information shall be submitted to the Department of
Environmental Protection on the form at the end of this Order prior to
commencement of the work.
9. A sign shall be displayed at the site not less than two square feet or more
than three square feet in size bearing the words, "Massachusetts Department
of Environmental Protection, File Number SE 83-1352 "
10. Where the Department of Environmental Protection is requested to make a
determination and to issue a Superseding Order, the Conservation Commission
shall be a party to all agency proceedings and hearings before the
Department.
5-2
11. Upon completion of the work described herein, the applicant shall forthwith
request in writing that a Certificate of Compliance be issued stating that
the work has been satisfactorily completed.
12. The work shall conform to the following plans and special conditions:
Plans:
Title: Revised Site Plan in South Yarmouth, MA for Siddharth Siddharth
Dated: January 28 1998
Signed & Stamped by: Edward E. Kelley, RPLS & Francis E. LaJoie, RPE & T. Varnum
Philbrook RPE
On File With: DEP
Special Conditions (Use additional paper if necessary)
1. Prior to the commencement of construction, General Condition No. 8, above,
must be complied with.
2. All construction must comply with the above -referenced plans and the
conditions of this Order. For any proposed change in the approved plans or
in the work, the applicant shall file a new Notice of Intent or inquire, in
writing, of the Department whether the change is substantial enough to
require a new Notice of Intent. No change in plan, under this filing, is
permissible without prior written approval from the Department allowing this
change.
3. It is the responsibility of the applicant, owner and/or successor(s) to
ensure that all conditions of this Order are complied with. The project
engineer and contractors are to be provided with a copy of this Order and
referenced documents before commencement of construction.
4. Members and agents of the local Conservation Commission and the Department
shall have the right to enter and inspect the property at all reasonable
times to evaluate compliance with the conditions stated in this Superseding
Order, and may require the submittal of any data deemed necessary by this
Department for that submittal.
5. A copy of this Order and the above -referenced plans shall be kept available
on site during all phases of construction, until a Certificate of Compliance
has been issued by the Department.
6. This Superseding Order of Conditions does not relieve the applicant from
obtaining approval under, and complying with any requirements of, the Town
of Yarmouth by-laws.
7. The erosion control barrier, as shown on the plan of record and established
on the site, shall be maintained until all construction has been completed
and all disturbed areas have been stabilized.
8. In any area where erosion has encroached into the bordering vegetated
wetland (BVW), the applicant shall remove the sediment from the BVW using
hand tools and manual labor.
9. Upon completion of the project, a Certificate of Compliance shall be
requested in accordance with General Condition No. 11, and under the
provisions of 310 CMR 10.05 (9)(d). An "AS- BUILT" plan and a statement
from a Registered Professional Engineer certifying compliance with the
conditions of this Order shall accompany the request for a Certificate of
Compliance.
There are no attached sheets with additional conditions.
5-3B
Issued by the department of
ironmental Protection
Signature
Tena J. Davies, -Regional Watershed Coordinator
v
On this 9th day of April 1998 before me
personally appeared Tena J. Davies
to me known to be the person described in ana wno execuLeu L.11c ��L�s��•7
instrument and acknowledged that he/she executed the same as his/her free act and
deed.
NotarysPubli My commission expires
u,r4c��_
The applicant, the owner, any person aggrieved by the Superseding Order, any
owner of land abutting the land upon which the proposed work is to.be done, or
any ten persons pursuant to G.L. c.30A §10A, are hereby notified of their right
to request an adjudicatory hearing pursuant to G.L. c.30A, §10, providing the
request is made by certified mail or hand delivery to the Department, with the
appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),
within ten days from the date of issuance of this Superseding Order, and is
addressed to: Docket Clerk, Office of General Counsel, Department of
Environmental Protection, One Winter Street, Boston, MA 02108. A copy of the
request shall at the same time be sent by certified mail or hand delivery to the
Conservation Commission, the applicant, and any other party.
A Notice of Claim for an Adjudicatory Hearing shall comply with the Department's
Rules for Adjudicatory Proceedings. 310 CMR 1.01(6), and shall contain the
following information:
(a) the DEP Wetlands File Number, name of the applicant and address of the
project.
(b) the complete name, address and telephone number of the party filing the
request, and, if represented by counsel, the name and address of the
attorney;
(c) the names and addresses of all other parties, if known;
(d) a clear and concise statement of (1) the facts which are grounds for the
proceedings, (2) the objections to this Superseding Order, including
specifically the manner in which it is alleged to be inconsistent with the
Department's Wetlands Regulations (310 CMR 10.00) and does not contribute to
the protection of the interests identified in the Act, and (3) the relief
sought through the adjudicatory hearing, including specifically the changes
desired in the Superseding Order;
(e) a statement that a copy of the request has been sent to the applicant, the
conservation commission and each other party or representative of such
party, if known.
Failure to submit all necessary information may result in a dismissal by the
Department of the Notice of Claim for an Adjudicatory Hearing.
Detach on dotted line and submit to the Department of Environmental Protection
prior to commencement of work.
To Department of Environmental Protection, Issuing Authority. Please be advised
that the Order of Conditions for the project at Lot 2 Curve Hill Road , File
Number SE 83-1352, has been recorded at the Registry of Deeds Barnstable County
and has—been noted in the chain of title of the affected propertyinaccordance
with General Condition 8 on '
If recorded land, the instrument number which identifies this transaction is
If registered land, the document number which identifies this transaction is
Signature Applicant
K/DFG/dg /bh
5-4B
NOTICE OF APPEAL RIGHTS/ADMINISTRATIVE ORDER/DETERMINATION
APPEAL RIGHTS AND TIME LIMITS
This Order/Determination is an action of the Department. If
you are aggrieved by this action, you may request an adjudicatory
hearing. A request for a hearing must be made in writing within
and postmarked within ten (10) days of the date this
Order/Determination was issued.
CONTENTS OF HEARING REQUEST
Under 310 CMR 1.01(6)(b), the request must state clearly and
concisely the facts which are the grounds for the request, and the
relief sought. Additionally, the request must state why the
Order/Determination is not consistent with applicable laws and
regulations.
FILING FEE AND ADDRESS
The hearing request along with a valid check payable to
Commonwealth of Massachusetts in the amount of $100 must be mailed
to:
Commonwealth of Massachusetts
Department of Environmental Protection
P.O. Box 4062
Boston, MA 02211
The request will be dismissed if the filing fee is not paid,
unless the appellant is exempt or granted a waiver as described
below.
The filing fee is not required if the appellant is a city or
town (or municipal agency), county, or district of the Commonwealth
of Massachusetts, or a municipal housing authority.
WAIVER
The Department may waive the adjudicatory hearing filing fee
for a person who shows that paying the fee will create an undue
financial hardship. A person seeking a waiver must file, together
with the hearing request as provided above, an affidavit setting
forth the facts believed to support the claim of undue financial
hardship.