HomeMy WebLinkAboutChapter 91 Notice 7.18.2025 DEPARTMENT OF ENVIRONMENTAL PROTECTION
WATERWAYS REGULATION PROGRAM
Notice of License Application Pursuant to M. G. L. Chapter 91
Waterways License Application Number 25-WW01-0077-APP
William A. Hearn
NOTIFICATION DATE: July 18, 2025 NaQ
JUL 14 REC'D 0,19
Public notice is hereby given of the waterways application by William A. Hea to r:,�. �,,,,
an existing bulkhead and construct and maintain a pier and kayak racks at 1 '1 ::..a'1� ;:' NT
in the municipality of Yarmouth, in and over the waters of Bass River. The proposed project
has been determined to be water-dependent.
The Department will consider all written comments on this Waterways application received
within 30 days subsequent to the "Notification Date". Failure of any aggrieved person or
group of ten citizens or more, with at least five of the ten residents residing in the
municipality(s) in which the license or permitted activity is located, to submit written
comments to the Waterways Regulation Program by the Public Comments Deadline will
result in the waiver of any right to an adjudicatory hearing in accordance with 310 CMR
9.13(4)(c).
Project plans and documents for the Waterways application are on file for public viewing
electronically at: https://eeaonline.eea.state.ma.us/EEA/PublicAppi (enter 104 River Street
in the Search Page as the Location Address). If you need assistance, please
contact cally.harpermass.qov or if you do not have access to email, please leave a
voicemail at (617) 549-3598 and you will be contacted with information on alternative
options.
Written comments must be addressed to: Cally Harper, Environmental Analyst, DEP
Waterways Regulation Program, 20 Riverside Drive, Lakeville, MA 02347.
I CERTIFY THAT THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF THE REGISTERS OF
DEEDS OF THE COMMONWEATH OF
MASSACHUSETTS.
HOF
a PAUL
RACIST III Lo
No. 59719
�7L -2 6/5/25
FOR REGISTRY USE ONLY PLS DATE
QRAWNG INDEX 3 WILLOW ST
SHEET TITLE o I
1 COVER SHEET LOCUS
2 EXISTING CONDITIONS
3 PROPOSED CONDITIONS Ha
4 CROSS SECTIONS
5 DETAILS
� 4
LOCUS MAP
PLAN LEGEND NOT TO SCALE
HISTORIC HIGH WATER
MEAN HIGH WATER (EL.= 1.5 NAVD 88)
MEAN LOW WATER (EL.= —2.2 NAVD 88) H�y
EXISTING CONTOURS o,
— — — — FEMA FLOOD ZONE AE BOUNDARY .
? DAVID J.
8 CRISPIN a
CIVIL
PRIOR CHAPTER 91 AUTHORIZATIONS Noll
AUTHORIZATION ISSUING AGENCY DATE
N/A N/A N/A /
)1NOTES: 6
1. EXISTING CONDITIONS SHOWN ARE PROVIDED FROM A BSC SURVEY COMPLETED /
ON 4/19/23.
2. ELEVATIONS DEPICTED ON THIS PLAN REFER TO NAVD 88 DATUM.
3. FEMA INFORMATION FLOOD ZONE VE EL.=13 DATED 7/16/2014 PANEL
#25001C0589J
4. SOURCE OF:
HHW — MA MAPPER
HLW — NO DATA AVAILABLE
MHW, MLW (BUZZARDS BAY INTERACTIVE TIDAL DATUM VIEWER)
5. WATER ELEVATION BASED ON NOAA TIDE GAUGE STATION 8447435 CHATHAM.
6. THIS SET OF PLANS IS FOR PERMITTING ONLY AND NOT FOR CONSTRUCTION.
(THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION SPECIFICATIONS)
7. THE SITE IS LISTED AS ASSESSOR'S MAPE 43 LOT 44
Prepared by:
BSC GROUP, INC.
349 ROUTE 28, UNIT D
WEST YARMOUTH, MA 02673
COVER SHEET JOB NO. 5-0713.00
SHEET 1 OF 5
6/5/25
PLAN ACCOMPANYING PETITION OF WILLIAM A. HEARN TO
CONSTRUCT AND MAINTAIN A PIER, AND REPLACE AND
RAISE THE EXISTING BULKHEAD IN THE EXISTING FOOTPRINT
AT 104 RIVER STREET. IN AND OVER THE WATERS OF THE
BASS RIVER IN SOUTH YARMOUTH, MA
(BARNSTABLE COUNTY)
1
I CERTIFY THAT THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF THE REGISTERS OF
DEEDS OF THE COMMONWEATH OF
MASSACHUSETTS.
o2 G.
HAGIST III
No. 59719 p 1
M
7 SE 6/5/25
FOR REGISTRY USE ONLY PLS DATE
I 1
-`tHaF4lit.
EXISTING W00D BULKHEAD F7� -'4.
00C#SE 83 —385 .4 DAVID J.
N/F MHW 0 BULKHEAD 8 CRISPIN �n
ROBERT BRUCE HECK FORCED CIVIL
96 RIVER ST No2
ASSESSOR MAP 43 � �\
PARCEL 43 EXISTING TIE
BACKS (TYP.)` / 7 //.•
4/ ---/V/iI"()
....._--,,00t lx :
,25 •10011%.
8 .
DECK itg.:
�� i �,
N/F
WILLAM A HEARN TRUSTEE `
RIVER STREET NOMINEE TRUST
104 RIVER ST •
ASSESSOR MAP 43 �'g
PARCEL 44 =' Ce
A .El
•
h � / c e,
o
1 y m N
/•m 4,yo h /
/ESP( •
�Ps ; 1
` OPV
""
> F
\:, SCALE. 1" = 20'
1 N/F
liKs'DAVID C ST
0 10 20 40 mu
VATTLE 110ERIVER ST O
ASSESSOR MAP 43
PARCEL 45
Prepared by:
BSC GROUP, INC.
EXISTING CONDITIONS 349 ROUTE 28, UNIT D
SHEET 2 OF 5 WEST YARMOUTH, MA 02673
6/5/25
PLAN ACCOMPANYING PETITION OF WILLIAM A. HEARN TO JOB NO. 5-0713.00
CONSTRUCT AND MAINTAIN A PIER, AND REPLACE AND
RAISE THE EXISTING BULKHEAD IN THE EXISTING FOOTPRINT
AT 104 RIVER STREET. IN AND OVER THE WATERS OF THE
BASS RIVER IN SOUTH YARMOUTH, MA
(BARNSTABLE COUNTY)
I CERTIFY THAT THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF THE REGISTERS OF
DEEDS OF THE COMMONWEATH OF
MASSACHUSETTS.
(javrpll'iljt1444-444,------ 4.,,\IG \
ISLIII V.
5971 �t6m�41�7A-,- l?f 6/5/25
FOR REGISTRY USE ONLY PLS DATE
I I
_.,tHaFA1���
EXISTING WOOD BULKHEAD Fly , 115%�
N/F MHCW OEBULKHEAD ? DAVID J. 1��
ROBERT BRUCE HOCK FORCED S CCI CIVIL
96 RIVER ST No2
ASSESSOR MAP 43 3 Ai
PARCEL 43 EXISTING TIE , 2 `OP\�
BACKS (TYP.)
TO BE REMOVED AND �.,' /
REPLACED WITH ;1 • NEW SOLDIER PILES(7) EC,
HELICAL ANCHO' • /- ,. 15't O.C.
I
PROPOSED FILL 1.268±S.F. � N : 3' WIDE GRAVEL
�20 E BEHIND RAISED WALL . ' C • BUFFER STRIP
S6Ay7' ,5: V •• PROPOSED
5- k 12. PILE TYP.
�2 EXISTING DECK 1' ;
TO BE REPLACED
ONCE CONSTRUCTION B i. . -PROPOSED p
IS COMPLETE. DECIt LADDERS ,.• PROPOSED LADDER
VW;
j=- n B PROPOSED
PROPOSED RAMP --�i 8'X16'FIXED PIER
,�� EL 6.5
t
I N/F A ' ,; •'A Il
PROPOSED WATER
WIWAM A HEARN TRUSTEE + DEPENDANT STORAGE
RIVER STREET NOMINEE TRUST it`!^ • PROPOSED BOX ON PIER,
104 RIVER ST w. KAYAK 9o't10 CMA L
ASSESSOR MAP 43 ' . 8' STORAGE NNE _
PARCEL 44 x RACK (l��'
EXISTING(79± LF.) � • in ,
WOOD BULKHEAD " ' PROPOSED N \
+ TO BE REPLACED AND .. 33'X4' PIER 1 l`t 1
•k RAISED TO �: DECK ELEV.=6.31 `l
�4, ELEVATION 6.5 M .L- CO a
fi v., —
(�7 •
/� S69 p2 / •
g,SIDE ,NIOE V1P 2
l)N
\ SCALE: 1" = 20'
I Nf
DAVID C McC ST
S �"' 0 10 20 40 �rr
VAAT 110ERIVER ST c
ASSESSOR MAP 43
PARCEL 45
Prepared by:
PROPOSED CONDITIONS BSC GROUP, INC.
SHEET 3 OF 5 349 ROUTE 28, UNIT D
6/5/25 WEST YARMOUTH, MA 02673
PLAN ACCOMPANYING PETITION OF WIWAM A. HEARN TO JOB NO. 5-0713.00
CONSTRUCT AND MAINTAIN A PIER, AND REPLACE AND
RAISE THE EXISTING BULKHEAD IN THE EXISTING FOOTPRINT
AT 104 RIVER STREET. IN AND OVER THE WATERS OF THE
BASS RIVER IN SOUTH YARMOUTH, MA
(BARNSTABLE COUNTY)
1-
I CER11FY THAT THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF THE REGISTERS OF
DEEDS OF THE COMMONWEATH OF
MASSACHUSETTS.
. Y' 7AuL
HAGIST III N
No. 59719
C�• /‹. a-�/j 6/5/25
FOR REGISTRY USE ONLY PLS u DATE
EXISTING BULKHEAD TO
REPLACE 3-1g 10' BE REMOVED
TAG SHEETING GRAVEL BUFFER STRIP
TO ELEVATION 6.5
AND FILL BENWD PROPOSED FILL
6510'WHALERS70tC.Y. DUSTING GRADE
10 r- 21E111J d-PIES
5 L BASS RIVER --__�
I I
MLW -2.2
NEW NEI/CAL
5 Ir COECTION—
I -PMCE1r——
MONO CRAB 10'0/C EXISTING TIE ROD
II ST]IGM TO BE
10 L- ABANDONED IN PLACE
SCALE: 1" = 10'
BULKHEAD PROFILE A—A
i
0 5 10 20 rat
39't FROM MHW TO END
PROPOSED NEW 12'DIA.P.T.PILING
PROPOSED FIXED PIER TOP=10.0
PROPOSED RAMP DECK ELEV.=6.5 BOTTOM(MIN.12'BELOW GRADE
20 4'WIDE WITH PILINGS 20
PROPOSED FIXED PIER
10. 10
PROPOSED LADDER
MHW1.8 ' 0 MHW 1.5
MLW-2.2 MLW-2.2
EXISTING WOOD
10 BULKHEAD TOP OF -10
WALL El.4.0
-20 PUBLIC ACCESS -20H� CY
5'MIN.CLEARANCE
3 DAVID J.
PROPOSED BOTTOM OF RIVER 8 CRISPIN N
KAYAK RACK COAL
0+00 0+20 0+40 0+60 0+80 1+00 Not
PIER PROFILE B—@ �0`"`O
SCALE: 1- = 20' / Z
I I �
0 10 20 40 FEET ( /i
Prepared by: rJ
BSC GROUP, INC.
CROSS SECTIONS 349 ROUTE 28, UNIT D
SHEET 4 OF 5 WEST YARMOUTH, MA 02673
6/5/25
PLAN ACCOMPANYING PETITION OF WILLIAM A. HEARN TO JOB NO. 5-0713.00
CONSTRUCT AND MAINTAIN A PIER, AND REPLACE AND
RAISE THE EXISTING BULKHEAD IN THE EXISTING FOOTPRINT
AT 104 RIVER STREET. IN AND OVER THE WATERS OF THE
BASS RIVER IN SOUTH YARMOUTH, MA
(BARNSTABLE COUNTY)
i
I CERTIFY THAT THIS PLAN CONFORMS TO THE
RULES AND REGULATIONS OF THE REGISTERS OF
DEEDS OF THE COMMONWEATH OF
MASSACHUSETTS.
g G. PAUL
HAGIST III ,o
No. 59719
iltAktVt"LAHO,
6/5/25
FOR REGISTRY USE ONLY PLS DATE
DAVID J.
8 CRISPIN ,n
CIVIL
Nos3srW
lbAZSOA
6' S
8'-0"
PROP. 2"x8" FRAMING 1"x6" "TREX"
PILING (TYP) 16" O.C. DECKING OR
EQUIVALENT
liij1il Ali
Ii i iiiw
IIi i iII STAIRS
Ili i !
IIi i LAG BOLTS (TYP)�' I—MI
STORAGE BOX OEM II i iI!'
ON PIER Ili•i i11 0
Ihm.i ill
II�iIw�I�II
FRAMING TO BE
REINFORCED WITH
GALVANIZED SEATS I�Ir�I�IIIII
WITH BRACKETS �jilil�u�ll�
PIER END DETAIL
SCALE: NONE
Prepared by:
BSC GROUP, INC.
DETAILS 349 ROUTE 28, UNIT D
SHEET 5 OF 5 WEST YARMOUTH, MA 02673
6/5/25
PLAN ACCOMPANYING PETITION OF WILLIAM A. HEARN TO Mpg No. 5-0713.00
CONSTRUCT AND MAINTAIN A PIER, AND REPLACE AND
RAISE THE EXISTING BULKHEAD IN THE EXISTING FOOTPRINT
AT 104 RIVER STREET. IN AND OVER THE WATERS OF THE
BASS RIVER IN SOUTH YARMOUTH, MA
(BARNSTABLE COUNTY)