Administrative Checklist
Certificate of Compliance
General Information:
•All filings must be made on Town of Yarmouth forms.
•All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
•Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
•Contact the Conservation Office if you need assistance.
Submitting an Application:
______
______
Hardcopy of the COC application mailed to or dropped off at the Conservation
office in Town Hall.
Signed statement from an Engineer or similar professional to who prepared the
approved plan stating the date of a recent site inspection and certifying compliance
with the permit and outlining departures from the approved plan, if any exist.
As-Built plan – *Refer to issued Order of Conditions: Special Conditions to
determine if required*.
Pdf of the COC request including application, letter, & as-built plan if needed
emailed to bdirienzo@yarmouth.ma.us and jjerolimo@yarmouth.ma.us
Local filing fee. Refer to Fee Schedule. Make check payable to “Town of
Yarmouth” and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Chech the Yarmouth Street Index for parcel-related Conservation
documents.
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us
CONSERVATION
OFFICE
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Alfred A. Delfino
Name
P.O. Box 808
Mailing Address
West Yarmouth
City/Town
MA
State
02673
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Alfred A. delfino
Applicant
2/21/2025
Dated
SE 83-2459
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
15 Webster Road
Street Address
Yarmouth
City/Town
29
Assessors Map/Plat Number
150
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Alfred A. Delfino
Property Owner (if different)
Barnstable
County
36842
Book
161
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).