Loading...
HomeMy WebLinkAboutCOC request 7.24.2025Kos cam. S. '-JG,( MLkJ+t-) CONSERVATION OFFICE MOW qcneuli 9nh.arr • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. Sa6m4tiag an C[Vpticatian. y Hardcopy of the COC application mailed to or dropped off at the Conservation office in Town Hall. Signed statement from an Engineer or similar professional to who prepared the approved plan stating the date of a recent site inspection and certifying compliance with the permit and outlining departures from the approved plan, if any exist. V As -Built plan — *Refer to issued Order of Conditions: Special Conditions to determine if required*. Pdf of the COC request including application, letter, & as -built plan if needed emailed to bdirienzo@yarmouth.ma.us and jjerolimo@yarmouth.ma.us V Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at hops://www.yarmouth.ma.us/696/Filing-Forms. *Chech the Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664- 4499 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 9 TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us Rev 3/2025 Sull'van Engineering& 1Consulting, Inc. (508) 428-3344 • P.O. Box 659 • 711 Main Street, Osterville, MA 02655 seci@sullivanengin.com • www.sulliyanengin.com July 18, 2025 Conservation Commission Town of Yannouth 1146 Route 28 South Yarmouth, MA 02664 RE: DEN 083-2229 - Certificate of Compliance Request Robert J. & Gina M. McCullough (formerly Robert & Rita Davis) 177 River Road Soudi Yarinoudi Dear Commissioners, At. die request of die applicant, I have perfonned an inspection of die project. I believe die project to be substantially in compliance Niridi die approval and would like to request a Certificate of Compliance. Attached are WPA For1n 8b, Photos of die site, Stamped Existing Conditions Plan and die associated fee with this request. I trust this meets your needs. Very ly yours, f , rq' U Jol 1 O'Dea, P.E. Sul ivan Engineering & Consulting, Inc. V.A. CONSERVATION OFFICE Town of Yarmouth Conservation Commission 21-DAY WAIVER Please complete this form, sign at the bottom and return to the Conservation Office. 1, Leah O'Dea , hereby waive the 21-day time period for a public hearing/meeting and/or issuance of the: OOC / DOA / COC / ORAD following receipt of my filing of a: ❑ Notice of Intent ❑ Request for Determination of Applicability ® Request for Certificate of Compliance ❑ Other by the Yarmouth Conservation Commission under Massachusetts General Laws, Ch. 131, sec. 40, and/or under Yarmouth Wetland Bylaw. The application was submitted on for work at 177 River Road, Yarmouth (project address/location) I am the: ❑ Applicant ® Applicant's Representative ❑ Property Owner Signature (date received by Conservation Office) 7/18/2025 Date NOTE: Please be advised that you will be notified of the meeting date once this application has been assigned to a Conservation Meeting Agenda at the email address listed on the application. 21 day waiver Rev July 2024 New Logo Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance 083-2229 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information This request is being made by: Robert J. McCullough and Gina M. McCu Name 177 River Street IYIa11111y nuulczb South Yarmouth MA 02664 City/Town State Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the work 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Robert J./Rita M. Davis Applicant 7/8/2020 083-2229 Dated DEP File Number The project site is located at: 177 River Street Yarmouth Street Address 34 Assessors Map/Plat Number %..ayI i own 291 Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Robert J. McCullough and Gina M. McCullough Property Owner (if different) Barnstable County Book CTF 224751, LCP 18832-A Certificate (if registered land) 5. This request is for certification that (check one): Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29114 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance 083-2229 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.ciov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-you r-city-or-town. html ). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 ra ILIR WW \m 4 iL •`� - to _ - - _ . - { y/ t j � r !' lJ + ,S