Loading...
HomeMy WebLinkAboutREVISED Plans 7.31.2025LEGEND 99 — EXISTING CONTOUR X 99 1 EXIST. SPOT ELEV. —[99}-- PROPOSED CONTOUR 198.4] PROPOSED SPOT EL. TM1 0 TEST HOLE El CONCRETE BOUND UTILITY POLE FIRE HYDRANT OCATCH BASIN LIGHT POST '*Oo WATER SHUT OFF — X FENCE — W— WATER LINE G GAS LINE — OHE — OVERHEAD ELECTRIC S SEWER LINE NOTE. NOT ALL SYMBOLS MAY APPEAR IN DRAWING JDCE #25-094 MILL NOTES 1. DATUM IS NAVD88 2. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (811) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 4. EXISTING SEPTIC LOCATIONS PER TIE —CARD ON FILE NTH TOWN. 5. WETLANDS FLAGGED BY PAUL SHEA OF INDEPENDENT ENVIRONMENTAL CONSULTANTS, LLC 3/21/25. 6. NATURE TRAILS SHOWN PER PLAN BOOK 641 PAGE 57. 7. EXISTING FENCING TO BE REPAIRED/REPLACED AS NECESSARY. r�' - 0 20 40 60 80 100 FEET DATE Barnstable Harbor sac G o Tha e Rood o � c to 64 o sM7dys�d LOCUS MAP SCALE 1 "=2000'f ASSESSORS MAP 121 PARCEL 14 & 15 STRUCTURES ARE WITHIN FEMA FLOOD ZONE X (AREA OF MINIMAL FLOOD HAZARD) AS SHOWN ON COMMUNITY PANEL #25001 C0559J DATED 7/16/2014 REFERENCES PLAN BOOK 641 PAGE 57 DEED BOOK 36916 PAGE 339 (#88) DEED BOOK 36917 PAGE 89 (#100) SITE PLAN OF 88 + 100 MILL LANE YARMOUTHPORT, MA PREPARED FOR NATASHA & OLIVER BRAHMST DATE: J U LY 2, 2025 REV: JULY 10, 2025 (ADDITIONAL FENCE & WALL) REV: JULY 31, 2025 (35' BUFFER & COMPOSTING AREA) 6 DANIEL A. OJALA, P.E., P.L.S. I 508-362-4541 downcape.com 00WJ7 cape eft giaee-Ping, iac. civil engineers land surveyors 939 Main Street (Rte 6A) YARMOUTHPORT MA 02675 SURVEY: NHO DRAFTED BY: DEG CHECKED BY: 25-094 BRAHMST.DWG