Loading...
HomeMy WebLinkAboutSOC recorded 8.7.2025Bk 37117 Pg154_31508 COMMONWEALTH OF MMSACHUSETTS 0 8- 0 7- 2 0 2 5 @ 0 8: 6,8 a EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION SOUTHEAST REGIONAL OFFICE * *1 1. n . n 71 ARGEO PAUL CELLUCCI . THIS IS A TRUE ATTEST COPY. TRUDYCOXE Secretary Governor April 9, 1998 DAVID B. STRUHS Commissioner Mays urn Redai We llardS Ch'.e+ Michael B. Stusse RE: YARMOUTH -- Wetlands 25 Mid -Tech Drive, Suite C File No. SE 83-1352 W. Yarmouth, Massachusetts 02673 Superseding "Modified" Order of Conditions Dear Mr. Stusse: Following an in depth review of the above referenced file and in accordance with Massachusetts General Laws, Chapter 131, Section 40, the Department of Environmental Protection has issued the enclosed Superseding Order of Conditions (SOC). This Order approves the proposed project subject to certain conditions. The Department has determined that the project site abuts a bordering vegetated wetland (SVW), as defined in 310 CMR 10.55(2). The proposed project consists of constructing a retaining wall between a single-family dwelling and a BVW to prevent the slope from constantly eroding, resulting in siltation of the BVW and destabilization of the building foundation. The enclosed SOC requires that the erosion control barrier installed between the wetland resource area and the work area, be maintained until the construction of the retaining wall is completed. The SOC directs that all disturbed areas be stabilized prior to removing the erosion control barrier. The SOC contains additional requirements to protect the interests of the Act. It is the opinion of the Department that, as conditioned herein, the proposed project adequately protects the above -noted interests of the Act. In the opinion of the Department the reasons given here are sufficient to justify the enclosed SOC. However, the Department reserves the right to raise additional issues and present further evidence as may be appropriate should there be further proceedings in this matter. 20 Riverside Drive • Lakeville, Massachusetts 02347 • FAX (508) 947-6557 • Telephone (508) 946-2700 0 Printed on Recycted Paper Bk 37117 Pg155 #31508 -2- If you have any questions regarding this SOC, please contact Daniel F. Gilmore at (508) 946-2808. Very truly yours, -"Tena J.. Davies Regio aai Watershed Coordinator Bureau of Resource Protection D/DFG/dg gbh Enclosure CC: Yarmouth Conservation Commission Siddharth Siddharth 283 Weymouth Street Holbrook, MA 02343 Certified Mail # Z 333 585 685 RETURN RECEIPT REQUESTED Bk 37117 Pg156 #31508 310 CMR 10.99 Form 5 DHP File No SE 83-1352 (To be provided by DEP) City/Town YARMOUTH Applicant Siddharth Siddharth Superseding "Modified" Order of Conditions Massachusetts Wetlands Protection Act G.L. c.1.31., 940 From Denartment of Environmental Protection To Siddharth Siddharth (Name of Applicant) Address 283 Weymouth Street Hingham, MA 02343 (applicant) To Same (Name of Property Owner) Address Same (owner) This Order is issued and delivered as follows: ❑ by hand delivery to applicant or representative on (date) ® by certified mail, return receipt requested on A=il 9� 7AGR (date) # Z 333 585 685 This project is located at Lot 2 Curve Hill Road The property is recorded at the Registry of Deeds, Barnstable County Book 10849 Page 306 Certificate (if registered) The Notice of Intent for this project was filed on218/96__ _ _(date) The public hearing was closed on_2/5_198 (date) Findings The _Department of Environmental Protection has reviewed the above -referenced Notice of Intent and plans and has held a public hearing on the project. Based on the information available to the Department of Environmental Protection at this time, the Department of Environmental Protection has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): Public water supply ® Flood control ❑ Land containing shellfish Private water supply Storm damage prevention ❑ Fisheries ® Ground water supply 1KJ Prevention of pollution ® Protection of wildlife habitat Total Filing Fee Submitted $250 State Share $112.50 City/Town Share $137.50 (% fee in excess of $25) Total Refund Due $ 0 City/Town Portion $ 0 State Portion $ 0 (M total) (M total) Effective 11/20/92 5-1 Bk 37117 Pg157 #31508 Therefore, the Department of Environmental Protection hereby finds that the following conditions are necessary, in accordance with the Performance Standards set forth in the regulations, to protect those interests checked above. The Department of Environmental Protection orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or :invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the -date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5.' This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. B. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is to be done. The recording information shall be submitted to the Department of Environmental Protection on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection, File Number SE 83-1352 10. Where the Department of Environmental Protection is requested to make a determination and to issue a Superseding order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 5-2 Bk 37117 Pg158 #31508 11. Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special conditions: Plans: Title: Revised Site Plan in South Yarmouth MA for Siddharth Siddharth Dated: January 28 1998 Signed & Stamped by: Edward E. Kelley, RPLS & Francis E. LaJoie, RPE & T. Varnum Philbrook RPE On File With: DEP Special Conditions (Use additional paper if necessary) 1. Prior to the commencement of construction, General Condition No. 8, above, must be complied with. 2. All construction must comply with the above -referenced plans and the conditions of this Order. For any proposed change in the approved plans or in the work, the applicant shall file a new Notice of Intent or inquire, in writing, of the Department whether the change is substantial enough to require a new Notice of.Intent. No change in plan, under this filing, is permissible without prior written approval from the Department allowing this change. 3. It is the responsibility of the applicant, owner and/or successor(s) to ensure that all conditions of this Order are complied with. The project engineer and contractors are to be provided with a copy of this Order and referenced documents before commencement of construction. 4. Members and agents of the local Conservation Commission and the Department shall have the right to enter and inspect the property at all reasonable times to evaluate compliance with the conditions stated in this Superseding Order, and may require the submittal of any data deemed necessary by this Department for that submittal. 5. A copy of this Order and the above -referenced plans shall be kept available on site during all phases of construction, until a Certificate of Compliance has been issued by the Department. 6. This Superseding Order of Conditions does not relieve the applicant from obtaining approval under, and complying with any requirements of, the Town of Yarmouth by-laws. 7. The erosion control barrier, as shown on the plan of record and established on the site, shall be maintained until all construction has been completed and all disturbed areas have been stabilized. 8. In any area where erosion has encroached into the bordering vegetated wetland (BVW), the applicant shall remove the sediment from the BVW using hand tools and manual labor. 9. Upon completion of the project, a Certificate of Compliance shall be requested in accordance with General Condition No. 11, and under the provisions of 310 CMR 10.05 (9)(d). An "AS- BUILT" plan and a statement from a Registered Professional Engineer certifying compliance with the conditions of this Order shall accompany the request for a Certificate of Compliance. There are no attached sheets with additional conditions. 5-3B Bk 37117 Pg159 #31508 Issued by the _pepartment of Signature �., "��l ''�' ,Tena J. Davies, ironmental Protection Waters on this 9th - day of Ax r4 1 199$ , before me personally appeared Tena J. Davies to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed t e same as his/her free act and deed. a12e� a - Notary ubli My commission expires The applicant, the owner, any person aggrieved by the Superseding Order, any owner of land abutting the land upon which the proposed work is to be done, or any ten persons pursuant to G.L. c.30A §10A, are hereby notified of their right to request an adjudicatory hearing pursuant to G.L. c.30A, §1,0, providing the request is made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7), within ten days from the date of issuance of this Superseding Order, and is addressed to: Docket Clerk, Office of General Counsel, Department of Environmental Protection, One Winter Street, Boston, MA 02108. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission, the applicant, and any other party. A Notice of Claim for an Adjudicatory Hearing shall comply with the Department's Rules for Adjudicatory Proceedings. 310 CMR 1.01(6), and shall contain the following information: (a) the DEP Wetlands File Number, name of the applicant and address of the project. (b) the complete name, address and telephone number of the party filing the request, and, if represented by counsel, the name and address of the attorney; (c) the names and addresses of all other parties, if known; (d) a clear and concise statement of (1) the facts which are grounds for the proceedings, (2) the objections to this Superseding Order, including specifically the manner in which it is alleged to be inconsistent with the Department's Wetlands Regulations (310 CMR 10.00) and does not contribute to the protection of the interests identified in the Act, and (3) the relief sought through the adjudicatory hearing, including specifically the changes desired in the Superseding Order; (e) a statement that a copy of the request has been sent to the applicant, the conservation commission and each other party or representative of such party, if known. Failure to submit all necessary information may result in a dismissal by the Department of the Notice of Claim for an Adjudicatory Hearing. Detach on dotted line and submit to the Department of Environmental Protection prior to commencement of work. To Department of Environmental_ Protection, Issuing Authority. Please be advised that the order of Conditions for the project at Lot 2 Curve Hill Road , File Number SE 83-1352, has been recorded at the Registry of Deeds Barnstable Count and has been noted in the chain.of title of the affected property -in accordance with General Condition 8 on 1 19 If recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature , Applicant K/DFG/dg /bh 5-4B JOHN F. MEADE, REGISTER BARNSTABLE COUNTY REGISTRY OF DEEDS RECEIVED E RECORDED ELECTRONICALLY