HomeMy WebLinkAboutEngineer Report 7/31/25 RECEIVED DWD Engineering,Inc. AU6 1120251 5 Michael Road East Bridgewater,MA 02333 BUILDING DEPARTMENT (508)378-9602 domdean(a)aol.com By ----- __. Field Report#1 Date: 7-31-25 Present: Domenic DeAngelo Chris Destefano-Project Superintendent Formwork Subcontractor Location: Willis Residence 194 Pawkannawkut Drive-Yarmouth,MA Building Permit# Remarks: 8:30 am-9:00 am 72 degrees sunny The following was observed and discussed Action items are noted in bold italics: -Excavation for the perimeter foundation walls and interior spread footings is complete.The bottom of the excavation is free of debris and standing water. -Formwork for the exterior wall footings and interior spread footings is also complete. The width and depth of the formwork was in conformance with the design drawings. -Reinforcing steel placement is ongoing and approximately 50%complete.The exterior footing reinforcement consisted of 2-#5s(bottom).Clearance between the underside of the steel and the bottom of footing is being maintained by the use of steel chairs.Vertical steel for the concrete piers consisted of 6-#8s in lieu of 6-#7s as shown on the design drawings.The formwork subcontractor had the#8s available.The substituted reinforcement is acceptable and no further work is required. -No omissions or deviations were observed. -A concrete pour is scheduled for tomorrow morning depending on the weather. Cc: Yarmouth Building Department ConSery Group,Inc. ��P� OF MAS,S9,4 1zc DOMENIC W. % DeANGELO e E STRUCTURAL No.35062 4;14:,Grs,l,F�s `� I.