Loading...
HomeMy WebLinkAboutquarterly inspection May 2025Report of lnspection / Test Quarlerly NFPA 25 ATUTED w =r$dr 05-21-2025 Property Supply New England 269109 28 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Prinl Date: 0t28-2025 Conducted by: Mike Mennella License Sprinkler Fitter Report of lnspection / Test General Questions OIA'NER SECNON ls the bualding occupied?E Yes DNo trNA Has the occlpancy dassificalion and hazard of contents remained the same since the last inspection? El Yes ONo ONA Are all fire prolecton systems in service?E Yes DNo trNA Has the system remained in service witholt modification since the last inspection? El Yes O tto trNA Was the system free of actuations ofdevices or alarms sinc€ the lasi inspection? g Yes E tlo trNA FIRE DEPARTMENT CONNECTION ls the FDC plainly visible?E Yes E trlo ONA ls the FDC easily accessible?E Yes trNo ONA ls the FDC check valve dflp free?E Yes E tto 0NA ls the dapper and automalic drain \€lve in place and properly operating? E Yes E t'.to trNA ls lhe FDC identification sign(s) in place?Yes No NA Has the five year FDC hydrostatc test been comdeted?E Yes E t'to trNA VALVE AREA Are the conlrol valves (including backflow preventer isolation valves) sup€rvised with seals locksd or is supeavision in place? E ves E t.lo trNA g Yes C t.to trNAE Yes D tto DNA Are the control valves (including valves on backllow preventers) with locks or eleckical supervision locked or is supervision in place? I Yes ENo 0NA Are the @ntrol valves (including valves on backllo/l/ preventers) with locks or eleclr cal supervtsion have lhe appropriate wrenches? E Yes DNogNA Are allcheck valves enernally rnspected, operaling properly, and are in good condition? @ Yes E tto DNA Are the gauges on system in good conditton and showing normal waler supply pressure? E Yes ENo trNA The electrical ,rraterflow alarm devices passed test by opening inspectot's test connectrory'bypass conneclion with alams actualjng and flow obserued? E Yes ENo DNA ALARMS E Yes trNo ONA Are alarms and supervisory devices not damaged?ls the alarm valve free Irom physical damage?E Yes ONo ONA Copyrighl 2025 lnspect Point Page 1 of 5 Allied Fire Protection lnspection Services lnc. '108 Pond Street West warwick Rhode lsland 02893 40'l-828-2600 inspections@all iedfi re.us @ tr o Are the control valves (including backflow preventer isolation valves) supervised with seals free from leaks? Are the contrd valves (including valves on bactflow proventors) with locks or eleclrical superv sion in correct (open or dosed) position? 05-21-2025 Property Supply New England 269'109 28 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date:0$28-2025 Allied Fire Protection lnspection Services lnc. 108 Pond Stroet West Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfi re.us Report of lnspection / Test Quarterly NFPA 25 Wry..8; Conducted by: Mike Mennella License Sprinkler Fitter ls the rim in crnect (open or closed) position?@ tr tr Yes No Have adjusted, repairrd, recondition€d, or r€placad components had proper tesls,,lnspections performed? e tr n Yes No I I Has the lnternal Pipe inspeclion been done in the past 5 years? E YesgNo trNA Copyrighl 2025 ,nspect Point Page 2 of 5 MAINTENANCE 5 YEAR *Report of Inspection / Test Quarterly NFPA 25 I\IUIED S"t 05-21-2025 Property Supy'y New England 269109 28 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Dat6: 0t2&2025 Conducted byi Mike Mennella License Sprinlder Fitter Allied Fire Protection lnspection Services lnc 108 Pond Street West Warwic* Rhode lsland 02893 401-82&2600 inspections@alliedfire.us MAIN DRAIN FLOWTESTS System lnitial Static Residual Static Oid waterflow alarm operate? N/A NiA N/A Yes Yes 4 ' shotgun. Ris6. and frow 62 60 Yes Yes VALVES (we0 \d\as on s€ll 'n slpply DRAIN VALVES (weo Copyraghl 2025 lnspect Point Page 3 of 5 Flow Observed? 50 05-21-2025 Property Supdy New England 269109 28 Aaon Way West Yarmouth MA 02673 Jason Sidok'18003379469 Print Date: 0S2&2025 Allied Fire Protection lnspection Services lnc. 108 Pond Street West Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfire.us Report of Inspection / Test Quarterly NFPA 25 :l:-- S*WW-.i Conducted by: Mike Mennella License Sprinkler Fitter Oeficioncy #1 ycar FDC hyd.o6tatic lest b.en complebd?: No Cr lical Has lhc fiva Status: Non Deficiency *2 Has ths Intqrn.l Pipc inspection been done in the past 5 years?: No Status: Non Crtical None None None None Copyrighl 2025 lnspect Point Page 4 of 5 Deficiencios - Gen6ral Questions Deficiencies - General Wet Syslem Questions Deficiencies - " Deficiencies - 4 " shotgun. Riser and flow Deficiencies - Valves Deficiencies - Drain Valves Report of lnspection / Test A\IJI]IED w =-S*Quarterly NFPA 25 05-21-2025 Property Supply New England 269109 28 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Dale: 0S28-2025 Conducted by: Mike Mennella License Sprinkler Fitter lnspector Signature I state that the informalion on this form is conect at the time ahd place of rny inspeciion, and all equipment tested at this time was left in operational condition upon completioh ofthrs inspection except as noled. lnspeclor Name Signature Date Completed Mike Mennella License Sprinkler Fitter 202r0r2'l Copyright 2025 lnspect point Page 5 of 5 Allied Fire Protection lnspection Services lnc. 108 Pond Street Wesl Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfire.us Report of lnspection / Test Quarterly NFPA 25 05-21-2025 Property Supply New England 269108 40 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date: 0t28-2025 Conducted by: Mike l\,4ennella License Sprinkler Fitter Allied Fire Protection lnspection Services lnc. 108 Pond Street West Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfire.us Report of lnspection / Test General Questions OII'NER SECTION ls the building occupied?E) Yes E tto trNA Has the occupancy classification and hazard of contents remained the sarne since the last inspection? E Yes E tto trNA Are all fire protection systems jn service?Has the system remained in service without modification since the last inspecton? Yes No NA Was the system free of actuat ons ofdevices or alarms since the lasl inspect on? E Yes E t',lo trNA FIRE DEPARTMENT CONNECTION ls the FDC plainly visible?E Yes E t'.lo trNA E Yes E t.to trNA ls lhe FDC check !€lve drip free?E Yes ENo trNA ls the clapper and automatic drain valve in place and properly operat ng? E Yes E tto trNA ls the FDC identflcatjon sign(s) in place?E Yes E tto trNA Has the five year FDC hydrostatic test been compleled?E Yes ENo trNA VALVE AREA Are the control valves (including backflow preventer isolation valves)supervised with seals locked or is supervision in place? El Yes E l',to E] NA Are the control valves (including backfow preventer isolation valves) supervised with seals free from leaks? E tr tr Yes No NA Are the control valves (includang valves on backflow preventers)with locks or electr cal sLtpervrsjon in correct (open or dosed) positjon? E Yes D t'to trNA Are the control valves (including valves on backjlowprevenlers)with locks or eleckical supervis on locked or is supervision in place? E Yes ENo trNA Are the control valves (includlng valves on backflow preventers) with locks or electrical supervision have the appropriate wrenches? tr D E Yes No Are all check valves externally nspected, operating properly, and are in good condition? EI Yes ENo ONA Are the gauges on system in good condition and showing normal water supply pressure? E Yes E tto DNA Yes No NA ALARMS E Yes 0No trNA Are alarms and supervisory devic€s not damaged?ls the alarm valve free from physical damage?El Yes ENo trNA Copyright 2025 lnspecl Point Page 1 of 5 WWr"ffi E D tr Yes No NA a tr tr ls the FDC easily accesslble? The electrical waterflow alarm devices passed tesl by opening inspectot"s test connectiorvbypass connection with alarms actuating end flCn observed? Eg tr 05-21-2025 Property Supply New England 269108 40 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date: 0$2&2025 Allied Fire Protection lnspection Services lnc '108 Pond Street West Warwick Rhode lsland 02893 401-82&2600 inspections@alliedfi re.us Report of lnspection / Test Quarterly NFPA 25 W'-.'ffiA]"ME} Conducted by: Mike Mennella License Sprinkler Fitter ls lhe trim in conect (open or closed) position?E Yes ENo trNA Heve adjusted, repaired, recondit oned, or replaced components had proper tests/inspections performed? El Yes DNo trNA Has the lnternal Pipe inspeclion been done in the pasl5 years? E Yes ElNo DNA Copyright 2025 !nspect Point Page 2 of 5 MAINTENANCE 5 YEAR 05-21-2025 Property Supply New England 269108 40 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date: 0t2&2025 s.,,,[IA\UX,JIED -;1EXH- Conducted byr Mike Mennella License Sprinkler Fitter MAIN DRAIN FLOW TESTS System lnitial Static Residual Static Flow Observed?Old watorfow alarm op€rate? 4'shotg!n riser 81 55 76 Yes Yes VALVES 4" shotgun risor (Wel) DRAIN VALVES 4" sholgun ri6er (Wet) I Copyrighl 2025 lnspect Point Page 3 of 5 Report of lnspection / Test Quarterly NFPA 25 Allied Fire Protection lnspection Services lnc. '108 Pond Street West Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfi re.us 05-21-2025 Property Supply New England 269108 40 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date: 0t2&2025 Allied Fire Protection lnspection Services lnc. 108 Pond Street Wesl Warwick Rhod6 lsland 02893 401-828-2600 inspections@alliedfi re.us Report of lnspection / Test Quarterly NFPA 25 WWr&; Conducted by: Mike Mennella License Sprinkler Fitter Deficiency l'l Ha6 the frvc y.ar FDC hydrcrt tic tcst bGGn complct.d?: No Status: Non Crltical Noles: Five-year FDC Hvdro test due Deficiency #2 Hls thq lntqmtl Pipe inspection becn dono i tho p.3t 5 y6.'3?: No Status: Non Crlical Notes: Five vear internal oiDe insogclion due None None None Copyright 2025 lnspecl Poinl Page 4 of 5 Deficiencies - General Ouestions Deficiencies - General Wet System Questions Deficiencies - 4" shotgun riser Deficiencies - Valves Deficiencies - Drain Valves 05-21-2025 Property Supply New England 269108 40 Aaron Way West Yarmouth MA 02673 Jason Sidok 18003379469 Print Date: 0+2&2025 Allied Fire Protection lnspection Services lnc. 108 Pond Street West Warwick Rhode lsland 02893 401-828-2600 inspections@alliedfi re.us Report of lnspection / Test Quarterly NFPA 25 f ar----WW-S* Conducted by: i/ike Mennella License Sprinkler Fitter I state that the intormatron on this form is correcl at the time and place of my inspeclion, snd all equipment tested at this iime was lefr n operational condjtion upon complet on of this rnspection except as noted. lnspector Name Signature Date Completed Mike Mennella Liconse Sprinkler Fitter Copyrighl 2025 Inspecl Point Page 5 of 5 lnsp€ctor Signature 2025-05-21