HomeMy WebLinkAboutAPPROVED plan 8.22.2025CROSS SECTION: LANDINGS NOT TO SCALE 3611 co 48" Minimum I- 1"x6" CAP 2"x4" RAIL 2"x4" RAIL 2"x4" RAIL 2"x6" DECKING, 3/8" SPACING 2"x 8" LANDING JOISTS (USE 3) PRESSURE TREATED (PT) 2"x12" STAIR JOIST (PT) 2"x8" YOKE (PT) 4"x 6" POST (PT) GRADE EROSION CONTROL DETAIL: NOT TO SCALE FILL MAX. 3" HEIGHT FLOW DIRECTION 2 z N I CONSERVATION NOTES: 2" x 2" WOODEN STAKES, SPACED 8' APART ON -CENTER 9" DIA. STRAW WATTLE --EXISTING GRADE CROSS SECTION: STAIRS 1.) PRIOR TO ANY ACTIVITY, THE PROPOSED STAIRWAY AND SHALL BE STAKED IN THE FIELD AND THE LIMIT OF WORK LINE INSTALLED AS SHOWN ON THE PLAN VIEW. THE LIMIT OF WORK LINE, ALONG THE SLOPE SHALL BE A ROW OF 9-INCH DIA. STRAW WATTLES, STAKED IN PLACE. IN ADDITION TO THE STAKED STAIRS AND THE INSTALLED LIMIT OF WORK, THE REPOSITIONED PATHWAY SHALL BE FLAGGED FOR INSPECTION. 2.) THE EXTENT OF TRIMMING AND BRANCH REMOVAL FOR THE PATHWAY SHALL BE REVIEWED WITH COMMISSION'S AGENT, PRIOR TO THE TRIMMING. 3.) AFTER CONSULTATION WITH AGENT, THE EXISTING VEGETATION WITHIN THE PROPOSED STAIRWAY STRUCTURE AND THE RELOCATED PATHWAY SHALL BE TRIMMED BACK A MAXIMUM OF 1 FOOT, TO PROVIDE ACCESS TO THE PROJECT AREA. 4.) NO ROOT MASS SHALL BE REMOVED FROM THE PROJECT AREA, EXCEPT AS REQUIRED FOR THE POST INSTALLATION. 5.) POSTS SHALL BE DUG INTO THE BANK A DEPTH OF 48". ALL EXCESS MATERIAL SHALL BE REMOVED FROM PROJECT SITE. 6.) ALL WORK SHALL BE DONE BY HAND. NO GASOLINE MACHINERY IS ALLOWED BEYOND THE TOP OF THE SLOPE. 7.) ALL MATERIAL CUTTING SHALL BE DONE BEYOND THE 100 FOOT BUFFER ZONE. 8.) ALL STOCKPI LI NG OF MATERIAL SHALL BE LOCATED BEYOND THE 100 FOOT BUFFER ZONE. 9.) UPON THE COMPLETION OF THE STAIRS AND LANDINGS, THE DISTURBED GROUND SHALL BE RAKED SMOOTH AND THEN SEEDED WITH A DROUGHT TOLERANT GRASS SEED MIX. IF NEEDED, THE SLOPE SHALL BE COVERED WITH AN EROSION CONTROL BLANKET AND SECURED TO THE SURFACE. 35 Z 0 0 u 6i 25 J LIJ U __j V) n; 15 4- 0 "All 50 wCn 0- o o 100' Buffer ---------------------- 10 20 30 40 50 I a� w w En I-- 11.01± 6.0'± 4.5'± 12.5'± o� LANDING STAIRS LAND'G STAIRS 61 In_ 1"x6" CAP 2"x4" RAIL 2"x4" RAIL 4"x 6" POST 2"x4" RAIL 2"x6" DECKING, 1/4" SPACING 2"x12" STAIRWAY STRINGERS (USE 3) 2"x8" YOKE UtiIlty #36-183 05 \o 5 \ �% PARSONAGE POINT 40' PRIVATE WAY °5 38,8 M 3 I �0/ 1..L� I- a 36.8 v �0 O I -- a O �t o m a w LU 36.5 BENCHMARKi Top of Catch Basin Rim EL=36.2± (NAVD88 Datum) L LU +I 3: B - of w_ oB � tl Edge of Pond 2-FOOT BENCH CANTILEVERED OFF LANDING - _ Bottom of Slope - - - - -M�- - - - -:� 60 70 80 90 100 110 120 130 140 "Al" SECTION A- 'A' SCALE: 1" = 10' 36.2 37.5 3 8.5 ' 80.00' 35.5 x 37.5 Utility -Pole °5 Paved Driveway' �7.6 2\\° / x 40,2 37A 40,1 X 39 3 OZ �° ( X4 i - .. LOT 39 \ ' I / / to � \ x 36.7 Area=12,197 SF± / x 42.8 / �'�// i/ I jPorch Existing Dwelling /�'�%;'i/ 42.5� / To of Foundation EL = p 44.3±P. Top of Slab EL = 37.2± 3 0 / First Floor EL = 44.6± % °1 Ridge Height EL = 61.0± / / 37.4 X 39,3 CD \ Deck \ X 3 7.9 x 36.1 x 36.6 1 r x 33.2 t x 35,3 CO.335,8 '..._ Utility oIe #36-182 x 34.9 X 35.8 / .-/ /////// /// j Abutting Dwelling / / / PROPOSED LIMIT OF WORK LINE ova Qj 3 sab �o Abutting Dwelling - 35,8 m PROPOSED ELEVATED'/,Vow, 34.2/ STAIRWAY i PROPOSED STEP Aq- 35.0 x 3` 8 Pine 41.0032,9 ine 12"1 • X 32� L co v C: O N O - - - - - -- 2- e� : 12" Oak • ; 4.7 34.4245.00' PROPOSED 3 FOOT PATHWAY 33.3 MY ,QJ co /o Vo 4 h PROPOSED 2-FOOT CANTILEVERED BENCH OFF LANDING " Oak 1� Oak /. Q/ oo PROPOSED ADJUSTMENT TO PATHWAY 9 M F. H IE Approximate Location of NHESP Boundary 3 \.PLOT 1 \, a PROPOSED ADJUSTMENT • �a� TO PATHWAY ti V Oa 14" Pine 9.6 10" Pine 6" Pine i f Ak I /9`-SOP2 I 0 20 40 60 SCALE 1"=20' G:\AAJOBS\HOLMES 9747\DWG\9747.PROPSOED SITE PLAN- STAIRS- CC PLAN.dwg Pine i ® V QO h 2- �Q- �v PROPOSED SHIFT OF THE PONDACCESS POINT, SHIFT PATHWAY ONTO LOCUS PROPERTY