Loading...
HomeMy WebLinkAboutCOC request 8.25.2025Rev 6/2025 Administrative Checklist Certificate of Compliance General Information: •All filings must be made on Town of Yarmouth forms. •All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. •Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. •Contact the Conservation Office if you need assistance. Submitting an Application: ______ ______ Hardcopy of the COC application mailed to or dropped off at the Conservation office in Town Hall. Signed statement from an Engineer or similar professional to who prepared the approved plan stating the date of a recent site inspection and certifying compliance with the permit and outlining departures from the approved plan, if any exist. As-Built plan – *Refer to issued Order of Conditions: Special Conditions to determine if required*. Pdf of the COC request including application, letter, & as-built plan if needed emailed to bdirienzo@yarmouth.ma.us and jjerolimo@yarmouth.ma.us Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth” and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Chech the Yarmouth Street Index for parcel-related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us CONSERVATION OFFICE WRS Engineering L.L.C. 467 OCEAN ST HYANNIS, MA 02601 508-776-0956 | royokurowski@gmail.com August 25th, 2025 To Edwin Hoopes Yarmouth Conservation Commission Chair Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 RE: REQUEST FOR CERTIFICATE OF COMPLIANCE 39 PRINCE RD, YARMOUTH, MA 02673 WRS Engineering L.L.C. requests a certificate of compliance for the work at 39 Prince Rd, Yarmouth, MA 02673 (Map/Plat# 29/90, Parcel/Lot# 29/90). The bulkhead was built according to the plan in compliance with the approved Order of Conditions (DEP File # 083-1222.) The date of the recent site inspection is 5-05-2025. Please schedule this for the next available Conservation Commission Public Hearing. If you have any questions or require additional information, please contact our office. Sincerely, WRS Engineering LLC Roy E. Okurowski P.E. wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: Provided by DEP A.Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1.This request is being made by: Name Mailing Address City/Town State Zip Code Phone Number 2.This request is in reference to work regulated by a final Order of Conditions issued to: Applicant Dated DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3.The project site is located at: Street Address City/Town Assessors Map/Plat Number Parcel/Lot Number 4.The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) County Book Page Certificate (if registered land) 5.This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html).