Loading...
HomeMy WebLinkAboutApproved Plan 8.21.2025LEGEND 99 — EXISTING CONTOUR X 99. 1 EXIST. SPOT ELEV. —[991— PROPOSED CONTOUR 198.4] PROPOSED SPOT EL. TH1 0 TEST HOLE O CONCRETE BOUND UTILITY POLE Y, FIRE HYDRANT 0 LIGHT POST 4Oo WATER SHUT OFF X FENCE — W WATER LINE G GAS LINE OHE OVERHEAD ELECTRIC S SEWER LINE NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING w o co N r BENCHMARK: o N CEMENT BOUND t = 10.0' NAVD88 ZONE 11) I 'ONE VE 13) l . ABUTTING WALL T.O.W. 8.7'f 25' SEAWARD LIMIT FOR BEACH ACCESS WORK ZONE JDCE #24-083 EXISTING DWELLING UNIT #3 PATIO REBUILD EXISTING STONE REVETMENT WALL AS SHOWN EXISTING VEGETATION LINE TO REMAIN IN THIS AREA. RESTORE IF DISTURBED. X g/ A? s N 84- 48' 30"E �'*41,111 Scale:1"= 30' 0 15 30 45 60 75 FEET EX/STING UN/T �4 LL/N0 l DECK l _j PATlO MEAN HIGH WATER EL. WOODEN RAMPS TO 1.6 NAVD, BE REBUILT IN KIND (TYP.) 1 C�7 a ZR�jS ___1 0 UPPER UN TL #6 ii `� DECK 1 #6 OWNER TO REMOVE PATIO PATl0 & WALL TO 7 THIS LINE TOP CO TRANSITION FROM r T�T .5:1 SLOPE TO 4j 2. OPE YY N /STAGING AREA err�cc � 25' SEAWARI FOR BEACH WORK ZONE 3.0 1.0 EXISTING GRADE VARIES EL 5.0-8.0' 5-6 TON TOE STONE BURIED 3-5' SECTION C-C NOT TO SCALE � A ED E 0 N Az LANDSCAPED AREA ti GQ V� �o ZONE AE -7 E (EL. 13) st\ PROPOSED 10' WIDE VEGETATED BUFFER ALONG TOP OF WALL. SEE NOTE 13. 2� PROPOSED 2-4 TON ARMOR STONES FIT IN PLACE (NOT DUMPED) 12" MIN. ROCKS TOP EL 7.0-8.0' tot ff- W NOTES 1. DATUM IS NAVD88 2. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (811) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 4. EXISTING SEPTIC SYSTEMS NOT SHOWN. 5. PROPOSED RAMP SUPPORT POST SHALL BE ATTACHED TO THE ROCK WITH CONNECTORS DRILLED INTO THE STONE WHEN SPANNING REVETMENT. 6. FILTER CLOTH SHALL BE MIRAFFI 60OX OR APPROVED EQUAL, INSTALLED IN TWO LAYERS, AND OVERLAP 3' MINIMUM ON ALL SIDES. 7. BEDDING STONE SHALL BE ONE LAYER OF GRANITIC STONE GRADED 6 TO 9". 8. ARMOR STONES SHALL BE OF NATIVE GRANITE BOULDERS AS SPECIFIED FOR WEIGHT ON THE TYPICAL PROFILE DETAIL. SELECT PRIMARILY UNIFORM, (NON —ELONGATED) ANGULAR STONE SHAPES AND FIT INTO PLACE FOR MAXIMUM STABILITY SUBJECT TO REVIEW AND INSPECTION BY OWNERS ENGINEER. ALL ARMOUR STONES SHALL FIRMLY CONTACT THE BED STONES AND ALL ARMOR STONE DIRECTLY ADJACENT. ARMOR STONES SHALL BE PLACES SO THEY INTERLOCK TO AVOID SHIFTING. ARMOR STONES SHALL BE SET IN A "POINTS UP" ORIENTATION. 9. REMAINING BOULDERS AND BEDDING STONE SHALL BE REMOVED FROM THE BEACH AND BUFFER ZONE DURING THE COURSE OF THE INSTALLATION. STONE CHIPS AND BEDDING MATERIAL SHALL BE CONTAINED IN A STEEL BIN OR OUT SUITABLE DEVICE. 10. ANY AREA OF BANK DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO PRE —CONSTRUCTION CONDITIONS. THIS INCLUDES RESTORING THE BANK SLOPE AND PLANTING WITH AMERICAN BEACH GRASS IN 12" CULMS SPACING. JUTE MESH/MATTING WITH TWINE AND OAK STAKES SHALL BE USED TO SECURE/STABILIZE THE SLOPE WHILE PLANTINGS BECOME ESTABLISHED. THE BEACH GRASS CAN BE PLANTED DIRECTLY THROUGH THE JUTE MESH. 11. INCIDENTAL GAPS AND SPACES WITHIN THE STONE FACE SHALL BE FILLED AND FITTED WITH THE LARGEST STONE THAT CAN BE FITTED INTO EACH OBSERVABLE SPACE. PLACING OR DUMPING OF STONE CHIPS ONTO THE STONE FACE IS NOT PERMITTED. 12. CONSTRUCTION ACCESS SHALL BE THROUGH THE CONDO ASSOCIATION DRIVEWAY(S) TO THE TOP OF THE BANK. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO MATCH THE PRE —CONSTRUCTION GRADES AND CONDITION. ALL ACTIVITY OVER PRIVATE BEACH PROPERTY SHALL BE SUBJECT TO ALL PRIVATE PROPERTY AUTHORIZATIONS TO THE EXTENT REQUIRED. 13. CREATE/MAINTAIN 10' MINIMUM WIDE BUFFER VEGETATED ALONG TOP OF ROCK WALL. PLANT SPECIES TO INCLUDE BEACH PLUM, VIRGINIA ROSE AND BAYBERRY, SEE MITIGATION PLANTING SCHEDULE. 14. ANY WORK WITHIN THE INTERTIDAL ZONE SHOULD BE CONDUCTED DURING LOW TIDE ONLY. PROPOSED MITIGATION PLANTINGS SEE NOTE 13 25' WORK ZONE MHW 1.6t 11A nGATION PLANTING SCFE XA E SYMBOL PLANT NAME SIZE QUANT. VIRGINIA ROSE #1 48 ROSA 14RGIN/ANA BEACH PLUM PRUNUS MARIAMA #5 23 daNIDA d NORTHERN BAYBERRY #3 30 a MYRICA PENSYL VANICA DATE PROPOSED 2-4 TON ARMOR STONES FIT IN PLACE (NOT DUMPED) \ *1.5 AT SECTION A -A VARIES 2.0 AT SECTION B-B 1.5-2.0* 1.0 I �I 5-6 TON TOE STONE BURIED 3-5' EL.=-2.0'f SECTION A -A & B-B Re] IaIt•�Y•DA 10 jHOFMgSs�C VjNOF44,9. DANIEL tirN� DANIELA. �GN� A. ; o OJALA ; OJALA N CIV!L. N q No.40980 No.40502 lq�jOESS\a RRGISTE�� SURVEY SSiONAL 6N DANIEL A. OJALA, P.E., P.L.S. c P o 0 L wi Boy Bind. Q ° Locu r o "o or Lewis Lewis Pond Bay Bodo owers Rood of 15100d �a�ti �O�r>>� Gre LOCUS MAP SCALE 1 "=2000'f ASSESSORS MAP 16 PARCEL 48C LOCUS IS WITHIN FEMA FLOOD ZONES VE 13 & AE 11 AS SHOWN ON COMMUNITY PANEL #25001CO588J DATED 7/16/2014 TOP OF WALL EL. 8.5t TAPER TO MATCH 10' WIDE EXISTING GRADE VEGETATED STRIP AT TOP OF WALL tIASEE NOTE 13 EL.=8.0-9.0 PROPOSED MIRAFI 60OX FILTER FABRIC IN TWO LAYERS OVERLAP JOINTS 4' MIN. STAGGER OVERLAPS PROPOSED 6"-10" LAYER OF 6" CRUSHED BEDDING STONE OVER DBL LAYER FABRIC, FILL ANY LARGE VOIDS IN ARMOR STONE WITH 1-2' ROCK EXISTING GRADE SITE PLAN OF 29 LEWIS BAY BLVD WEST YARMOUTH, MA PREPARED FOR YARMOUTH SHORES CONDO ASSOCIATION DATE: APRIL 29, 2025 REV: JUNE 26, 2025 (WALL SLOPE/PLANTINGS) REV: JULY 24, 2025 (CONSCOM COMMENTS, ACCESS PATH) REV: AUGUST 21, 2025 (SECTION C—C PLANTINGS) off 508-362-4541 I fax 508-362-9880 downcape.com down cape engineering, hK civil engineers land surveyors SURVEY: QAH 939 Main Street ( Rte 5A) DRAFTED BY: DEG/PTT YARMOUTHPORT MA 02675 CHECKED BY: Yam/ 24-083 YSCA.DWG