Loading...
HomeMy WebLinkAboutEngineer's Report 8/15/25 RECEIVED AUG 19 20251 5 Michael Road East Bridgewater,MA 02333 BUILDING DEPARTMENT (508)378-9602 domdean@aol.com By -- - -- Field Report#2 Date: 8-15-25 Present: Domenic W.DeAngelo Bill Reagan(ConSery Group,Inc.) Chris Destefano-(ConSery Group Inc.) Location: Willis Residence 194 Pawkannawkut Drive-Yarmouth,MA Building Permit# l pnc Remarks: 8:45 am-9:15 am 72 degrees cloudy The following observations were made(Action items are noted in bold italics): -Formwork for the foundation walls and column piers is complete.The width of the formwork in both cases has been done in accordance with the design drawings. -Reinforcing steel placement for the foundation walls is also complete.The wall reinforcing consisted of 2-#5s top and bottom as required. Corner bars were observed at all changes in wall direction and lap lengths met or exceeded the required minimum(30"). Similarly,the pier reinforcement steel is complete and consisted of 8-0A8 bars with the horizontal ties at 12"on center as required by the design drawings. -The anchor bolts required for the structural steel columns are also onsite.The size and length are in agreement with the design and structural steel shop drawings.A plywood template has been provided with the anchor bolts at the proper center to center dimensions. -No deviations or omissions were observed. -A concrete pour is scheduled for Monday morning. Cc: Yarmouth Building Department ConSery Group,Inc. ► �Q�V OF Iv�,y6,t1 y, 90Vs, DOMENIC W. DeANGELO STRUCTURAL y► 6,No.35062.0 c `:Po, FGI Ts' 'it{"!SE' •. '.Y..'� rtrj W : aR 1st w Y 41r Y" t `lp - • "1�