HomeMy WebLinkAboutsprinkler test and inspection 2005{bctrEo SPRINKLER FIRf, PROTECTIVE SERVICE
350 Main Street .W. Y!rmouth MA 026?3.(5m) 775-2800
Iln!l\llo\{ Pre\ lnlion De\ i.es Fa\:(508) 778-9628
Name of Premise
Address
Owner
Address
REPORT #
REPORT DATE
A & B CANCO Tel # 5OB-775-28O0
350 Main Street - West Yarmouth MA 02673
A & B CANCO Tel # 508-775-2800
350 Main Street - West Yarmouth, MA 02673
F 44684 ANNUAL TEST & INSPECTION
October12,2OO5 SEMI-QRTLYTNSPECTTON
Owner's Section
A. Explain any occupancy hazard changes since the previous inspection
NONE
B. Describe fire protection modifications since the last inspection
NONE
C. Describe any fires since the lasl inspection
NONE
D. When was the system piping last checked for stoppage, corosion, or foreign mattep
1995
E. When was the dry piping system last checked for proper piich?
1995
F. Are dry valves adequately protected from freezing?
YES
1.) General
A. ls the building occupied?
B. Are all systems in service?
C. ls there a minimum of 18 in. clearance
between the top of the storage and the sprinkler
deflector?
D. ln areas protected by wet systems, does all
of the building appear to be properly heated?
E. Does the hand hose on the sprinkler system
appear to be satisfactory?
F. ls the building completely sprinkled?
G 2" main drain flowed?
H. Dry system, low points drained this
inspection?
l. Alarms teste.: this inspection?
lnspection comments
YES
{.T
t
{
_T
T
{
-T
NO N/A
THIS IS A DRY SYSTEM WITH LOCAL ALARMS ONLY.
t\
\
,T'
(^,t
------f-V
SPRINKLER SYSTEM REPORT OF TEST & INSPECTION
{
P
YES NO N/A
3.)Water Supplies
A. Was a water flow test of the main drain made
at the sprinkler riser?
4.1 Tanks. Pumps. Fire Department Connections
A. Are fire pumps, gravity tanks, reservoirs, and
pressure tanks in good condition and properly
maintained?
B. Are fire department connections in
satisfactory condition, couplings free, caps in
place, and check valves tight? Are they
accessible and visible?
s.)Wet stems
A Are cold weather valves (O.S & Y.) in the
appropriate open or closed position?
B. Have antifreeze system solutions been
tested?
C. Were the antifreeze test results satisfactory?
6.) Drv Svstems
A ls the dry valve in service?
B. Are the air pressure and priming water level
in accordance with manufacturer's rnstructions?
C. Has the operation of the air or nitrogen
supply been tested?
D. Were low points drained during this
inspection?
E. Did quick opening devices operate
satrsfactorily?
F. Did the dry valve trip properly during the trip
pressure test?
G. Did the heatirrg equipment in the dry-pipe
valve room operate at the time of inspection?
{
{
{
{T
{
2.) Control Valves
A. Are all sprinkler system control valves and all
other valves in the appropriate open or closed
position?
B. Are all control vales in the open position and
locked, sealed, or equipped with a tamper
switch?
7.) Special Svstems
A. Did the deluge or preaction valves operate
properly during the last test?
B. Did the healresponsive devices operate
properly during testing?
C. Did the supervisory devices operate during
testing?
8.)Alarms
A. Did the water motor and gong test
satisfactorily?
B. Did electric alarm test satisfactorily?
C. Did supervisory alarm service test
satrsfactorily?
e)Sprinklers
A. Are all sprinklers free from corrosion,
loading, or obstruction to spray discharge?
B. Are sprinklers less than 50 years?
C. ls stock of spare sprinklers available?
D. Does the exterior condition of the sprinkler
system appear to be satisfactorily?
E. Are sprinklers of proper temperature ratings
for their locations?
10.) Date dry-pipe valve tested (control valve partially open)
1 1 . ) Date dry-pipe valve tested (control valve fully open)
12.) Date quick-opening device tested
1 3. ) Date deluge or preaction valve tested
14.) Review control valve maintenance
10-12-05
12-'t 0-98
N/A
YES
{T
t
{
_T
t
YES NO N/A
N/A
Trip Test Table
DRY VALVE
DRY PIPE
OPERATING
TEST
DELUGE
& PRE-
ACTION
VALVES
o.o.D.
IF NO. EXPLAIN
SERIAL NO.
OPERATEO
PROPERLY
IF NO. EXPLAIN
OPERATION HYDRAULIC
NO
SEC
NO
NO
MAXIMUM TIME
TO OPERATE
RELEASE
N/A
Control Valve Maintenance Table
Control Valves Number Type Open Secured Closed
Explain
Abnormal
Signs Condition
IIAX E MOOEL
c3
AL
1
TIME TO TRIP
THRU TEST
CONNECTION
WATER
PRESSURE
AIR
PRESSURE
TRIP POINT
AIR
PRESSURE
TIME
REACHED
TEST
OUTLET
MIN sEc PSI PSt PSI MIN SEC YES
WTHOUT
Q.O.D.35 71 44 10
wlTH
Q,O,D
PNEUMATIC ELECTRIC
PIPING SUPERVISED YES NO DETECTING MEDIA SUPERVISED YES
DOES VALVE OPERATE FROTT' THE II.IAI'IUAL TRIP ANO/OR REMOTE CONTROL
STATIONS
YES
IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING
YES NO
MODEL DOES EACH CIRCUIT OPERATE
SUPERVISION LOSS ALARM
OOES EACH
CIRCUIT OPERATE
VALVE RELEASE
YES NO YES NO MIN
IIII
City Connection
PIV NONE
Tank Control
Valves NONE
Pump Control
Valves NONE
Sectional
Control Valves NONE
System Control
Valves 2 OS&Y YES YES NO YES NONE
Other Control
Valves NONE
Make Model Size Type Serial #
Backflow Valve AMES 2OOOSS 4',DC
Size Location
ATTIC - REAR
1 _ ABOVE BATHROOI\iI IN LEATHER SHOP,
1 - BASEMENT BY STAIRS IN FRONT ROOM
1 - BASEMENT BY VALVES.
lnspectors Test
Valve
Auxiliary Drain
Valves 3 -'1
MAKE MODEL
GLOAE
MAKE
2C10479
'1 5. ) Water Flow Test at Sprinkler Riser
Water supply source City? I Tank?
Date
Pump? _
Test Pipe
Location
Size
Test Pipe
Static
Pressure
Residual
Pressure
Last Flow Test 1-3-00 RISER 75 65
Current Flow Test 1O-12-O5 RISER 2'71 60
16)Heat Resoon sive Devices
Test Method N/A
Type of Equip
Manufacturer
ment
Test Results
Valve No Valve No
Valve No
Valve No
Valve No
Valve No
Valve No
Valve No
17.) Explain any "No" answers and comments
NONE
ABCDEFABCDEFA B C DE FA B C DE F ABCDEFABCDEFA B C DE FA B C DE F
18.)Adjustments or conections made during this inspection.
ADDED SIGNS, LOCKS & CHAINS TO CONTROL VALVES
1 9. ) Although these comments are not the result of an engineering review, the
following desirable improvements are recommended.
NONE
Inspector's Name
Company
Date
FRANCIS BERRIO
ocToBER 12,2005
2',
Auxiliary Equipment. No? _ Type? _ Location? _ Test Result? _
A & B CANCO