Loading...
HomeMy WebLinkAboutsprinkler test and inspection 2005{bctrEo SPRINKLER FIRf, PROTECTIVE SERVICE 350 Main Street .W. Y!rmouth MA 026?3.(5m) 775-2800 Iln!l\llo\{ Pre\ lnlion De\ i.es Fa\:(508) 778-9628 Name of Premise Address Owner Address REPORT # REPORT DATE A & B CANCO Tel # 5OB-775-28O0 350 Main Street - West Yarmouth MA 02673 A & B CANCO Tel # 508-775-2800 350 Main Street - West Yarmouth, MA 02673 F 44684 ANNUAL TEST & INSPECTION October12,2OO5 SEMI-QRTLYTNSPECTTON Owner's Section A. Explain any occupancy hazard changes since the previous inspection NONE B. Describe fire protection modifications since the last inspection NONE C. Describe any fires since the lasl inspection NONE D. When was the system piping last checked for stoppage, corosion, or foreign mattep 1995 E. When was the dry piping system last checked for proper piich? 1995 F. Are dry valves adequately protected from freezing? YES 1.) General A. ls the building occupied? B. Are all systems in service? C. ls there a minimum of 18 in. clearance between the top of the storage and the sprinkler deflector? D. ln areas protected by wet systems, does all of the building appear to be properly heated? E. Does the hand hose on the sprinkler system appear to be satisfactory? F. ls the building completely sprinkled? G 2" main drain flowed? H. Dry system, low points drained this inspection? l. Alarms teste.: this inspection? lnspection comments YES {.T t { _T T { -T NO N/A THIS IS A DRY SYSTEM WITH LOCAL ALARMS ONLY. t\ \ ,T' (^,t ------f-V SPRINKLER SYSTEM REPORT OF TEST & INSPECTION { P YES NO N/A 3.)Water Supplies A. Was a water flow test of the main drain made at the sprinkler riser? 4.1 Tanks. Pumps. Fire Department Connections A. Are fire pumps, gravity tanks, reservoirs, and pressure tanks in good condition and properly maintained? B. Are fire department connections in satisfactory condition, couplings free, caps in place, and check valves tight? Are they accessible and visible? s.)Wet stems A Are cold weather valves (O.S & Y.) in the appropriate open or closed position? B. Have antifreeze system solutions been tested? C. Were the antifreeze test results satisfactory? 6.) Drv Svstems A ls the dry valve in service? B. Are the air pressure and priming water level in accordance with manufacturer's rnstructions? C. Has the operation of the air or nitrogen supply been tested? D. Were low points drained during this inspection? E. Did quick opening devices operate satrsfactorily? F. Did the dry valve trip properly during the trip pressure test? G. Did the heatirrg equipment in the dry-pipe valve room operate at the time of inspection? { { { {T { 2.) Control Valves A. Are all sprinkler system control valves and all other valves in the appropriate open or closed position? B. Are all control vales in the open position and locked, sealed, or equipped with a tamper switch? 7.) Special Svstems A. Did the deluge or preaction valves operate properly during the last test? B. Did the healresponsive devices operate properly during testing? C. Did the supervisory devices operate during testing? 8.)Alarms A. Did the water motor and gong test satisfactorily? B. Did electric alarm test satisfactorily? C. Did supervisory alarm service test satrsfactorily? e)Sprinklers A. Are all sprinklers free from corrosion, loading, or obstruction to spray discharge? B. Are sprinklers less than 50 years? C. ls stock of spare sprinklers available? D. Does the exterior condition of the sprinkler system appear to be satisfactorily? E. Are sprinklers of proper temperature ratings for their locations? 10.) Date dry-pipe valve tested (control valve partially open) 1 1 . ) Date dry-pipe valve tested (control valve fully open) 12.) Date quick-opening device tested 1 3. ) Date deluge or preaction valve tested 14.) Review control valve maintenance 10-12-05 12-'t 0-98 N/A YES {T t { _T t YES NO N/A N/A Trip Test Table DRY VALVE DRY PIPE OPERATING TEST DELUGE & PRE- ACTION VALVES o.o.D. IF NO. EXPLAIN SERIAL NO. OPERATEO PROPERLY IF NO. EXPLAIN OPERATION HYDRAULIC NO SEC NO NO MAXIMUM TIME TO OPERATE RELEASE N/A Control Valve Maintenance Table Control Valves Number Type Open Secured Closed Explain Abnormal Signs Condition IIAX E MOOEL c3 AL 1 TIME TO TRIP THRU TEST CONNECTION WATER PRESSURE AIR PRESSURE TRIP POINT AIR PRESSURE TIME REACHED TEST OUTLET MIN sEc PSI PSt PSI MIN SEC YES WTHOUT Q.O.D.35 71 44 10 wlTH Q,O,D PNEUMATIC ELECTRIC PIPING SUPERVISED YES NO DETECTING MEDIA SUPERVISED YES DOES VALVE OPERATE FROTT' THE II.IAI'IUAL TRIP ANO/OR REMOTE CONTROL STATIONS YES IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING YES NO MODEL DOES EACH CIRCUIT OPERATE SUPERVISION LOSS ALARM OOES EACH CIRCUIT OPERATE VALVE RELEASE YES NO YES NO MIN IIII City Connection PIV NONE Tank Control Valves NONE Pump Control Valves NONE Sectional Control Valves NONE System Control Valves 2 OS&Y YES YES NO YES NONE Other Control Valves NONE Make Model Size Type Serial # Backflow Valve AMES 2OOOSS 4',DC Size Location ATTIC - REAR 1 _ ABOVE BATHROOI\iI IN LEATHER SHOP, 1 - BASEMENT BY STAIRS IN FRONT ROOM 1 - BASEMENT BY VALVES. lnspectors Test Valve Auxiliary Drain Valves 3 -'1 MAKE MODEL GLOAE MAKE 2C10479 '1 5. ) Water Flow Test at Sprinkler Riser Water supply source City? I Tank? Date Pump? _ Test Pipe Location Size Test Pipe Static Pressure Residual Pressure Last Flow Test 1-3-00 RISER 75 65 Current Flow Test 1O-12-O5 RISER 2'71 60 16)Heat Resoon sive Devices Test Method N/A Type of Equip Manufacturer ment Test Results Valve No Valve No Valve No Valve No Valve No Valve No Valve No Valve No 17.) Explain any "No" answers and comments NONE ABCDEFABCDEFA B C DE FA B C DE F ABCDEFABCDEFA B C DE FA B C DE F 18.)Adjustments or conections made during this inspection. ADDED SIGNS, LOCKS & CHAINS TO CONTROL VALVES 1 9. ) Although these comments are not the result of an engineering review, the following desirable improvements are recommended. NONE Inspector's Name Company Date FRANCIS BERRIO ocToBER 12,2005 2', Auxiliary Equipment. No? _ Type? _ Location? _ Test Result? _ A & B CANCO