Loading...
HomeMy WebLinkAboutCOC request 9.16.2025CAPE COD ENGINEERING, INC Robert M. Perry, P.E. a P.O. Box 1517 East Dennis, MA 02641 508-385-1445 bobperrv( is capecodenzincerin2.com September 16, 2025 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Certificate of Compliance — 935 Great Island Road, Yarmouth; DEP SE 83-1922 Elevated Stairway To the Conservation Commission, Enclosed please find Form 8A and a check for $150. The applicant is requesting a Certificate of Compliance. I inspected the site on August 22, 2025 and I hereby certify that the beach stairway was constructed in substantial compliance with the Order of Conditions. The stair case 1 post spacing is slightly wider than shown on the plan however the railings are simple post -held ropes, has a very open frame, sand is collecting in the zone, and beachgrass growth surrounding the stair is robust. Large stepping stones originally proposed were not installed. The stair has been in place for approximately I 1 years and is in good condition with stable ground on the approach path. A narrow single board bench was added to the upper landing. A photo of the current condition appears below: -r Ffyf/ Sincerely, Cape Codoerry, ering, Inc. Robert M. r,`K Massachusetts Department of Environmental Protection LiBureau of Resource Protection - Wetlands WPA Form 8A -- Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project information Important: When filling out 1. This request is being made by: forms on the Cape Cod Engineering, Inc. computer, use Name only the tab PO Box 1517 key to move . ---- your cursor - Mailing Address do not use the return key. tsb z. Upon completion of the work 3. authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. DEP File Number: SE 83-1922 _ Provided by DEP East Dennis MA CitylTown State 508-385-1445 Phone Number This request is in reference to work regulated by a final Order of Conditions issued to: John H. Bocock &Nora M. Brookfield Applicant 4/19/2012 SE 83-1922 Dated DEP File Number The project site is located at: 935 Great Island Road West Yarmouth Street Address City/Town 3 1 _ Assessors MaplPlat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for Property Owner (if different) Barnstable County Book Doc: 1,190,480 Cert: 186096 _ Certificate (if registered land) This request is for certification that (check one): 02641 Zip Code Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc • rev. 5l29l14 Page 1 of 2 LlMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE 83-1922 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DPP Regional Office (see htt://www.mass. ov/eea/a encies/massde /about/contacts/find-the-massde -re ionaI-office- for-your-city-or-town.html). wpaformBa.doc — rev. 5/29/14 Page 2 of 2