HomeMy WebLinkAboutPreconstruction meeting 9.18.2025 Y
°f' _41ik,o Yarmouth Conservation Commission
Pre-Construction Meeting
soitrAcncne
/4,CORPOR*TO�'
DEP File Number SW2025-001
Applicant Ekaterina & Family, LLC
Address 1272, 1276& 1282 Route 28
Company Contact l V ' ,� r-t L�y f�-
Info: G1 � 1" ` C�� ��' VW -
3--,_-CV ic___X (vp-1,44-1, 1
1 -ff0,.. _a3---/ 33ac -
Signature of Acknowledgement: My signature acknowledges that I read and understand the Order of Conditions,
including the special conditions per the Yarmouth Conservation Commission. A copy of the Order of Conditons will
remain onsi_f�� e duration of the
Mir _ -
Erosion Control Maintenance: It is your responsibility to maintain your sedimentation and erosion control in good working
order.
Final Stabilization and Erosion Control Removal: It is your responsibility to ensure permanent stabilization of the site and
remove and properly dispose of your sedimentation and erosion control once the site is fully stable.
Certificate of Compliance: It is your responsibility to request and secure from the Conservation Commission a Certificate
of Compl. ce once the project has been completed.
• / Order of Conditions Recorded?
[°j/ File Number Sign Up?
ltt Erosion Control: Your sediment and erosion control has been properly installed in the appropriate location(s)
You AY M T,egin work.
7.;...5.,<-.----------- c:-7Y/ -5----C--C'''246'7Lt-'"/?e-'1---1 6:947776///' 7raic-e C-o--7/c4 47,c- /-,„„/_.5
Other Comments:
f CC- �fit/l x.5 l✓J _ LI, r' "`11 -11 — 4,� ll/! lo '
L,:i( PzQf ........ rr r .�
4,4,,
yj e /
1