HomeMy WebLinkAbout25-067 Moran Septic Cert 9-10-25939 main street rte 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cope engineering, inc
civil engineers & land surveyors
September 10, 2025
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth, MA 02664
tel. (508) 362-4541
J fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E.
Craig J. Ferrari, E.I.T., S.E.
Phellyp T. Tonial, E.I.T., S.E.
DCE job #: 25-067 Moran
Regards: 20 Mill Lane, Yarmouth Port, map 121 parcel 30
Down Cape Engineering, Inc. viewed the soil removal on
September 8, 2025, and performed a septic system installation
inspection on September 10, 2025, for the address above. Down
Cape Engineering, Inc. certifies that the septic system as installed
conforms to the design plan and to all state and local requirements.
?S� 1
NOF41,4S�ti
c
DANIELA.
WAL A
CIVIL
Nc 46502
� o <
NAL ECG
Daniel A. Ojala, PE, PLS date
■ 0.