Loading...
HomeMy WebLinkAbout2012 Nov 20 - Email to EAS Survey - RevisionsPage 1 of 1 vonHone, Amy From: vonHone, Amy Sent: Tuesday, November 20, 2012 1:40 PM To: 'eas.survey@yahoo.com' Subject: 198 Route 28 Timmy's Roast Beef Ed - Bruce and I have reviewed this plan and have the following questions: proposing to raise plumbing — please provide the measurement of how much the plumbing is to be raised label the type of foundation (will need to list the additional setback variance if not a slab) ✓ leach units must be fed every 20' per Title 5 15.253 (6) ✓ 4. provide grease trap sizing in design calcs. ✓ does Title 5 allow a 25% reduction in tank size versus leach capacity only? ✓ your water usage note on page 2 references the lowest water records rather than the highest water records in 2012 (88,000 gallons) �1. Title 5 does not allow a 25% reduction in leach facility AND II'variance to groundwater ✓ Per Bruce's request, could you stop by the office around 10:30 am some time this week or next week to review the septic design? Please email or cal with a preferred day. Thanks, Amy Amy L. von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F) 508-760-3472 avonhone@yarmouth.ma.us 11 /20/2012