HomeMy WebLinkAbout2012 Nov 30 - Emails with Bruce LloydvonHone, Am
From: vonHone, Amy
Sent: Friday, November 30, 2012 9:11 AM
To: 'Bruce Lloyd'
Subject: RE: Timmy's Roast Beef
A couple of issues:
1. The observation port is a separate entity in the leach field, if it was connected to
laterals, the laterals will all flow into the observation port if the port is connected to
the line connecting the laterals.
2. I am concerned about the vent being located in the front where the entry into the store
is and also where there currently are picnic tables for outdoor customer dining. Every
time the pump turns on, there will be a push of air from the system. I would need to see
where the flower bed is to make a final decision.
When are you starting the system?
Amy
Amy L. von Hone, R.S., C.H.O.
Assistant Health Director
Yarmouth Health Department
-----Original Message -----
From: Bruce Lloyd [mailto:blloyd3@verizon.net]
Sent: Friday, November 30, 2012 8:30 AM
To: vonHone, Amy
Subject: Re: Timmy's Roast Beef
Hi Amy been looking at the plans for Timmy's Roast Beef. We would like to make a small
change to the plan. Looking at the ends of the drain tubes it says to tie them together
with the observation port. What we would like to do is to tie the vent into this
end.putting the vent tube with filter next to the flower bed that is right next to we're
the end of the system will be. We will put a cement post in front of it to protect it. By
doing this it will give better circulation of air to the system. Let me know if this will
be acceptable. Thanks Bruce Sent from my iPhone
1