Loading...
HomeMy WebLinkAbout792-12Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #23 9/23/20259/22/2025 4000 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 9/25/2025792-12A 4.02 3 16.0 3970Lab 9/29/2025792-12B 7Lab 10/6/2025792-12C 14Lab 10/20/2025792-12D 28Lab 10/20/2025792-12E 28Lab 792-12F Lab Remarks: 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By