HomeMy WebLinkAbout91 Weir Road inspection reportTown of Yarmouth, MA
Inspection Report
Inspection: Inspection
Inspector: Debra Bruinooge
Inspection Date: Aug 19, 2025
Record: Rental Registration #BHR-25-648
Location: 91 &93 WEIR RD, YARMOUTH PORT, MA
02675
Applicant: Adrian Mann
Rental Inspection
Overall Result: Pass
Overall Remarks:
Met with owner Ryan and tenant of 7 years Pat.
Spoke with Ryan post inspection to go over
findings. He committed to addressing issues
identified. See below for findings.
Checklist:
1.
Number of Bedrooms/Measurements
Result: Pass
Remarks:
#1 9.750 13.440 #2 11.380 X 13.495
2.
Maximum Occupancy: Based on septic system
capacity, number of bedrooms and bedroom
square footage
Result: Pass
Remarks:
440 GPD for property/ 2 Bedrooms-Maximum
Occupancy-4
3.
Basement
Result: Pass
Remarks:
Recommend removing any old carpet or items
that could grow mold from previous illegal
basement occupancy.
4.
Electrical Panel
Result: Pass
5.
Copy of Tenant's Legal Rights have been issued to
tenant.
Result: Pass
Remarks:
Gave to tenant with my business card
105CMR 410.00 0Minimum Standards
of Fitness for Human Habitation
(State Sanitary Code: Chapter II)
Result: Pass
410.100 Kitchen Facilities
*
Result: Pass
410.110 Bathroom Facilities : Sinks,
Toilets, Tubs & Showers
*
Result: Pass
410.120 Approved Toilets
*
Result: Pass
410.130 Water supply
Potable Water/Sanitary Drainage
Result: Pass
410.140 Plumbing Connections
*
Result: Pass
410.150 Hot Water
110-130 °F for faucets & 110-120 °F for bathtubs a
& showers
Result: Pass
410.160 Heating Systems
*
Result: Pass
410.170 Venting
*
Result: Pass
410.180 Temperature Requirements
Owner shall proved heat in every habitable room &
every room containing a toilet, shower or bathtub
from September 15th through May 31st. 64° from
11:01 pm to 6:59 am 68° from 7 am to 11:00 pm
Result: Pass
410.200 Provision and Metering of
Electrical or Gas
*
Result: Pass
410.210 Provision of Oil
*
Result: Not Observed
410.220 Natural and Mechanical
Ventilation
*
Result: Pass
410.230 Owner's Laundering
Responsibilities
If owner provides bed linens, towels, pillows or
mattress
Result: Not Observed
410.235 Owner's Installation,
Maintenance and Repair
Responsibilities
*
Result: Fail
Remarks:
-Tenant stated leaking from shower head-repair
-Shower surround requires scraping and
recaulking maintain in operable condition free
from leaks, obstructions or other defects, all
facilities and equipment which the owner is
required to provide, and all owner installed
equipment
410.240 Occupant's Installation and
Maintenance Responsibilities
*
Result: Pass
410.250 Asbestos-containing Material
*
Result: Pass
410.260 Means of Egress
*
Result: Pass
410.270 Locks
*
Result: Pass
410.300 Electrical Supply &
Illumination
*
Result: Pass
410.310 Auxiliary Emergency Lighting
Systems & Exit Signs
For properties with 10 or more units
Result: Not Observed
410.320 Electrical Service
Temporary Wiring, Amperage
Result: Pass
410.330 Smoke Detector and Carbon
Monoxide Alarms
*
Result: Pass
Remarks:
Present as required. Tested and working.
410.400 Owner/Manager Contact
Information and Notice of Occupants'
Legal Rights and Responsibilities
Contact information and postings inside and
outside of home
Result: Pass
410.410 Building Identification
*
Result: Pass
Remarks:
Numbers on property are at the end of their
useful life, recommend to upgrading to make it
easier for first responders to see from the road
410.420
Habitability Requirements
Result: Pass
410.430 Natural Light and
Obstructions
*
Result: Pass
410.470 Lead-based Paint Hazards in
Residence
*
Result: Pass
410.500 Owner Responsibility to
Maintain Building & Structural
Elements
*
Result: Fail
Remarks:
-Rotted trim on the house-repair/replace (A)
Every owner of a residence shall maintain all
buildings and structural elements in compliance
with accepted standards so they are in good
repair and in every way fit for the intended use,
including: (1) Protected from wind, rain and snow,
and are watertight, free from excess moisture or
the appearance of mold, and pest resistant; and
(2) Free from holes, cracks, loose plaster, or
defects that render the area difficult to keep
clean, create an injury risk, or provide an entry or
harborage for pests. (B) In the event of leaks and
flooding, the owner shall ensure all surfaces have
been dried within 48 hours from the time they
are notified or the end of the event, whichever is
sooner
410.510 Occupant 's Responsibility
Regarding Building and Structural
Elements
*
Result: Pass
410.520 Protective Railings and Walls
*
Result: Pass
410.530 Weather-tight elements
*
Result: Pass
410.540 Installation of Screens
*
Result: Pass
410.550 Elimination of Pests
Owners & Occupants are responsible for the
control & elimination of pests
Result: Pass
Remarks:
N
410.560 Refuse
*
Result: Pass
Remarks:
Owner responsible. Went over owners'
responsibility for trash in a duplex. Gave him flyer
with the information.
410.570 Maintenance of Areas in a
Sanitary and Safe Condition
*
Result: Pass
410.620 Conduct of Inspections
The need for an additional inspection by a
specialized inspector pursuant to 105 CMR
410.620(A) and the reason that such inspection is
necessary
Result: Not Observed
410.630 Conditions Deemed to
Endanger or Materially Impair Health
and Safety
One or more of the violations cited on this report
may materially impair the health or safety and/or
well-being of any person(s) occupying the
premises
Result: Not Observed
780 CMR 111.5.1 Posting of Use &
Occupancy
STR Only
Result: Not Observed
780 CMR 111.5.2 Required Egress
posting
STR Only
Result: Not Observed
780 CMR Means of Egress
STR Only
Result: Not Observed
780 CMR R314 & R315 Smoke/CO/Heat
STR Only
Result: Not Observed
This inspection report is signed and
certified under the pains and
penalties of perjury.
Inspector's signature, date and time
Result: Pass
Remarks:
Debra Bruinooge-08/19/2025-1:30PM