Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-23 (1)
Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #317, 318, 99, 100, 101, 102, 103, 319, 320 10/8/202510/7/2025 4000 69 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method:Pump INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 10/10/2025792-23A 4.04 3 24.5 6050Lab 10/14/2025792-23B 4.02 7 25.7 6390Lab 10/21/2025792-23C 14Lab 11/4/2025792-23D 28Lab 11/4/2025792-23E 28Lab 792-23F Lab Remarks: 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By