Loading...
HomeMy WebLinkAbout792-24Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services 104, 105, 321, 322, 333, 324, 325, 326 ETHAN MEDEIROS 10/9/202510/8/2025 4000 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method:Pump INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 10/13/2025792-24A 4.06 5 23.5 5780Lab 10/15/2025792-24B 7Lab 10/22/2025792-24C 14Lab 11/5/2025792-24D 28Lab 11/5/2025792-24E 28Lab 792-24F Lab Remarks: 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By