HomeMy WebLinkAboutFINAL 212 MTD Arch Final Construction Control 09.09.2025 (1)
Final Construction Control Document
To be submitted at completion of construction by a
Registered Design Professional
for work per the ninth edition of the Massachusetts State
Building Code, 780 CMR, Section 107
Date: 09 / 09 / 2025
Permit No: _________________
Project Title: 212 Midtech Drive – New Contractor Bays
Property Address: 212 Midtech Drive, West Yarmouth, MA 02673
Project: Check (x) one or both as applicable: (_X_) New construction (___) Existing
Construction Project description:
Construction of a single story building of approximately 11,360 gross square feet, consisting of eleven (11) new
industrial contractor bays. The work has been concluded in compliance with code and the construction documents.
I have also indicated below that the structural engineering is complete, and have attached hereto the local structural
engineers letter dated 04.14.2025.
I Kurt E. Raber MA Registration Number: 10563 Expiration date 8/31/2026, am a registered design professional, and I
have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
(_X _) Architectural (_X __) Structural (____) Mechanical
(____) Fire Protection (____) Electrical (____) Other: Describe
for the above named project. I, or my designee, have performed the necessary professional services and was present at
the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit
and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress
and quality of the work and to determine if the work was performed in a manner consistent with the construction
documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a “wet” or electronic
signature and seal
Phone number: (508) 362-8382
Email: kurt@catalystarchitects.com
Version 01_01_2018
Building Official Use Only
Building Official Name: Permit No.: Date: