HomeMy WebLinkAbout200 MTD CC Report_3_ Final 10.03.2025203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM October 3, 2025 Mr. Tim Sears Deputy Building Commissioner Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 RE: Controlled Construction Report No. 3 New Industrial Bay Building 212 200 Mid Tech Drive, West Yarmouth, MA Dear Mr. Sears, Construction activities are ongoing at the subject project. Over the few months of this project 1. Completion of all Fire Protection Systems 2. Completion of all Plumbing Systems 3. Completion of all Heating and Ventilation Systems 4. Completion of all Electrical Systems 5. Installation of smoke and fire proof sealants and caulking at wall penetrations 6. Installation and testing of BDA, Fire Alarm, and Fire Sprinkler systems in coordination with Yarmouth Building and Fire Departments 7. Completion of paving and Striping 8. Completion of landscape plantings including the drainage basins 9. Completion of the Water & Fire Service in coordination with the Yarmouth Water Department Our consulting Engineer has visited the site and provided punch lists of any outstanding work, and this office has visited the site to back-punch that small list and verified their completion. 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM The architects Punch list of small items was very short and repetitive, but these items have all been addressed by the general contractor. The only item on the plans that is not yet complete is the fenced in yards to be constructed behind each unit; this work is contracted and will be installed in the coming weeks. This should not prohibit occupancy. Catalyst was on site with the owner and project manager on 9/10/2025 and all agreed the project was substantially complete. Pic 3.1 The water service, meters and expansion tanks x 12 accounts is fully functional and located within the Sprinkler Room Pic 3.2 BDA equipment is fully functional in the Rated Closet enclosure located at the rear of the Sprinkler Room 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Pic -3.3 Sprinkler Valve and Signally equipment are fully functional in the Sprinkler Room Pic -3.4 House Electric Panel and Fire Alarm Control Panel fully functional in the Sprinkler Room 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Pic -3.5 This picture shows typical insulated plumbing supply lines and fire sealed wall penetrations Pic -3.6 Erosion control plantings with one of two similar drainage basins Pic -3.7 Typical Parking Lot Tree 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Pic -3.8 Small plantings are complete adjacent to entry driveways, Signage and traffic/parking striping is complete in parking lot. All work completed to date has been done in a good and workmanlike manner and in general accordance with the construction documents. If you have any questions, please feel free to contact me at any time. Sincerely, Kurt E. Raber Project Architect CC: Waylon Lohr, Lohr Construction (General Contractor) Jeff Bilezikian (Owner) Rick Fenuccio (OPM, ClearPath Advisors) Enc. Copy of fire protection report - 200 MTD Scanned NFPA13 Report 09-18-2025 19.30 Copy of fire alarm report - 200 Mid Tech Fire Inspection Report