October 3, 2025
Mr. Tim Sears
Deputy Building Commissioner
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
RE: Controlled Construction Report No. 3
New Industrial Bay Building
212 200 Mid Tech Drive, West Yarmouth, MA
Dear Mr. Sears,
Construction activities are ongoing at the subject project. Over the few months of this
project
1. Completion of all Fire Protection Systems
2. Completion of all Plumbing Systems
3. Completion of all Heating and Ventilation Systems
4. Completion of all Electrical Systems
5. Installation of smoke and fire proof sealants and caulking at wall penetrations
6. Installation and testing of BDA, Fire Alarm, and Fire Sprinkler systems in coordination
with Yarmouth Building and Fire Departments
7. Completion of paving and Striping
8. Completion of landscape plantings including the drainage basins
9. Completion of the Water & Fire Service in coordination with the Yarmouth Water
Department
Our consulting Engineer has visited the site and provided punch lists of any outstanding
work, and this office has visited the site to back-punch that small list and verified their
completion.
203 WILLOW STREET SUITE A PH 508-362-8382
YARMOUTHPORT MA 02675 FAX 508-362-2828
WWW.CATALYSTARCHITECTS.COM
The architects Punch list of small items was very short and repetitive, but these items
have all been addressed by the general contractor. The only item on the plans that is not
yet complete is the fenced in yards to be constructed behind each unit; this work is
contracted and will be installed in the coming weeks. This should not prohibit
occupancy.
Catalyst was on site with the owner and project manager on 9/10/2025 and all agreed
the project was substantially complete.
Pic 3.1
The water service, meters and
expansion tanks x 12 accounts
is fully functional and located
within the Sprinkler Room
Pic 3.2
BDA equipment is fully
functional in the Rated Closet
enclosure located at the rear of
the Sprinkler Room
203 WILLOW STREET SUITE A PH 508-362-8382
YARMOUTHPORT MA 02675 FAX 508-362-2828
WWW.CATALYSTARCHITECTS.COM
Pic -3.3
Sprinkler Valve and Signally
equipment are fully functional
in the Sprinkler Room
Pic -3.4
House Electric Panel and Fire
Alarm Control Panel fully
functional in the Sprinkler
Room
203 WILLOW STREET SUITE A PH 508-362-8382
YARMOUTHPORT MA 02675 FAX 508-362-2828
WWW.CATALYSTARCHITECTS.COM
Pic -3.5
This picture shows typical
insulated plumbing supply
lines and fire sealed wall
penetrations
Pic -3.6
Erosion control plantings with
one of two similar drainage
basins
Pic -3.7
Typical Parking Lot Tree
203 WILLOW STREET SUITE A PH 508-362-8382
YARMOUTHPORT MA 02675 FAX 508-362-2828
WWW.CATALYSTARCHITECTS.COM
Pic -3.8
Small plantings are complete
adjacent to entry driveways,
Signage and traffic/parking
striping is complete in parking
lot.
All work completed to date has been done in a good and workmanlike manner and in
general accordance with the construction documents. If you have any questions, please
feel free to contact me at any time.
Sincerely,
Kurt E. Raber
Project Architect
CC: Waylon Lohr, Lohr Construction (General Contractor)
Jeff Bilezikian (Owner)
Rick Fenuccio (OPM, ClearPath Advisors)
Enc. Copy of fire protection report - 200 MTD Scanned NFPA13 Report 09-18-2025 19.30
Copy of fire alarm report - 200 Mid Tech Fire Inspection Report