Loading...
HomeMy WebLinkAbout200 MTD CC Report_1 10.11.2024 Rev203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM October 11, 2024 Mr. Tim Sears Deputy Building Commissioner Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 RE: Controlled Construction Report No. 1 New Industrial Bay Building 212 Mid Tech Drive, West Yarmouth, MA Dear Mr. Sears, Construction activities are ongoing at the subject project. Over the months of August & September, the following general work has occurred in the period from 7/21/2024 to through 9/31/2024. 1. Existing Building Demolition 2. Controlled Backfill 3. Site Clearing and Grading 4. Excavation for Footings 5. Placement of Concrete Footings 6. Placement of Concrete Foundation Walls 7. Erection of Steel Superstructure 8. Installation of Exterior Steel Doors and Frames 9. Installation of Secondary Natural Gas Service Piping (exterior) Northeast Geotechnical Solutions have been retained to conduct soil, compaction, and concrete testing. We have reviewed their test reports and have not found any areas of concern. Their recent concrete strength testing report is attached here. 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Our consulting Engineer has visited the site on at least three occasions to view the work in progress, and inspect the footing and foundation wall reinforcing steel and also to review the structural frame. Catalyst attends on-site construction meetings with the project team every other Tuesday (or twice monthly) to monitor work in progress and adherence to the construction documents. Pic -1.1 Photo of Footing Formwork w/ Steel Reinforcing, tied and ready for concrete pour. Pic -1.2 Spread Footing below Steel Bent Location, with Strip Footings between, typical. 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Pic -1.3 Foundation Wall Forms for south half of the building. Pic -1.4 Foundations complete with Dampproofing Pic -1.5 Natural Gas Manifold at the north end of the building. 203 WILLOW STREET SUITE A PH 508-362-8382 YARMOUTHPORT MA 02675 FAX 508-362-2828 WWW.CATALYSTARCHITECTS.COM Pic -1.6 Steel Frame being Erected All work completed to date has been done in a good and workmanlike manner and in general accordance with the construction documents. We have attached field reports from ourselves and our consultants If you have any questions, please feel free to contact me at any time. Sincerely, Kurt E. Raber Project Architect CC: Craig Lohr, Lohr Construction(Contractor) Jeff Bilezikian (Owner) Rick Fenuccio (OPM, ClearPath Advisors) Set no. Date Cast Slump (in.)Air (%) Temp. (°F) Compressive Strength: 3-day (p.s.i.) Compressive Strength: 7-day (p.s.i.) Compressive Strength: 28-day (p.s.i.) Compressive Strength: 28-day (p.s.i.) Compressive Strength: 28-day (p.s.i.) Compressive Strength: 56-day (p.s.i.) Specified 28-Day Compressive Strength (p.s.i.)Location NEG-1 8/1/2024 6.5 5.5 73 ---2,150 2,860 2,630 2,690 3,990 3,000 Footings (note 1) NEG-2 8/20/2024 6 5.5 71 ---2,600 2,980 3,430 3,390 ---3,000 Found. Walls, Footing (note 2) NEG-3 8/28/2024 6.5 4 72 ---2,320 3,210 3,340 3,310 ---3,000 Foundation Walls (note 3) Notes NORTHEAST GEOTECHNICAL, INC. 1. Concrete pour for proposed footings (see Field Report No. 5). 2. Concrete pour for proposed foundation walls within south portion of building from 7/C to 7/A-lines, and footing along A-line from 4 to 5-lines (see Field Report No. 6). 3. Concrete pour for proposed foundation walls within north portion of building from 7C to 7A-lines (see Field Report No. 7). Concrete Testing Summary: Proposed Commercial Building - 212 Mid-Tech Drive, West Yarmouth, MA