Loading...
HomeMy WebLinkAbout792-27 (1)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR 119, 292, 293, 120, 121, 122 10/10/202510/9/2025 4000 60 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 10/13/2025792-27A 4.04 4 24.7 6120Lab 10/16/2025792-27B 4.04 7 28.9 7160Lab 10/23/2025792-27C 4.00 14 36.9 9230Lab 11/6/2025792-27D 28Lab 11/6/2025792-27E 28Lab 792-27F Lab Remarks:SPECIFIC GRAVITY 1.92 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By